3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off (17622 Views)

Arrest Killers Of Fulani Herdsmen In Mambila, Numan, Others – Miyetti Allah / Buhari Award $5.8 Billion Mambila Dam Power Plant Contract To Chinese State Firm / Construction Of 3050MW Power Plant In Taraba: Fashola Opens Talk (2) (3) (4)

(1) (2) (Reply) (Go Down)

3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by ninjasta: 11:15pm On Sep 06, 2016
Forty Chinese engineers have visited the site of the 3050 WM Mambilla hydro-power project at Gembu in Taraba State.
The high profile visit which took place weekend is preparatory to the take off of the project, official sources told Daily Trust.
The visit was undertaken in company of officials from the Federal Ministry Power, Works and Housing and heavy security.
The area is located about 340 kilometres away from Jalingo, the state capital.
The team inspected areas mapped out for the project from River Dongo in Gembu, headquarters of Sardauna local government area.
The main project, including the huge turbines, is to be constructed at Baruf where River Dongo cascaded from 1671metres above sea level into the basin below.
It was gathered that this was the first time such a number of experts visited the site since the plan to construct the dam was conceived several decades ago.
The Dam, according to its design, will also boost irrigation farming in the state, a major source of excitement for thousands people who live in the project area.
A community leader, Alhaji Suleiman Zubairu, has commended President Muhammadu Buhari for his commitment towards the execution of the project.
Alhaji Suleiman told Daily Trust in an interview that the arrival of experts in large number to the project site was a good indication that the federal government was fully committed to actualisation of the project.

FG speeds project
The squabbles between two Chinese companies that caused setbacks previously, had been resolved, officials told Daily Trust yesterday.
It was also learnt that the scope of work at the site has finally been presented by the Chinese contractors to the federal government.
A consultant and former staff of the Bureau of Public Enterprises (BPE) had told our reporter that
President Goodluck Jonathan’s administration got a new French consultant who expanded the project’s scope to 3050mw and re-valued the cost at $3.2bn (about N636.9bn) in 2011.
The power sector expert attributed the delay in flagging off the project since 2011 to the inclusion of Sinohydro Corporation, a Chinese firm that was not part of the original bid winners – CGC/CGGC in 2005.
“The Obasanjo government signed the contract with the Chinese firm in 2007 and if it was followed by now, we would have added 2600mw additional hydropower to the grid,” he said.
Earlier this year, Fashola had said the Taraba State Governor who was a former Minister of State, Power, Mr. Darius Dickson Ishaku acquired the project land and would construct an access road to the site.
“The first thing to do is to acquire the land and deal with compensation issues, which the Governor has promised to deal with.
“The feasibility study has been done and so too the Environmental Impact Assessment. We move one day at a time closer to starting Mambilla,” Fashola had stated.
The Director, Energy Resources Development in the ministry, Mr. Emmanuel Ajayi who responded to a recent Daily Trust enquiries said the federal government this year resolved that the two Chinese firms, Gezhouba Construction Group Corporation (CGGC), and the Sinohydro Corporation must agree to handle the Engineering, Procurement and Construction (EPC) contract.
Mr. Ajayi in the exclusive interview said project cost had been reviewed with the Bureau of Public Procurement (BPP) valuing it at $5.732billion (about N1.140trn).
Another official in the ministry said the project could last for 63 months (over five years) after it is flagged off, including 12 months for a Defect Liability Period (test running). On the funding sources, it was gathered that the federal government will contribute its 15 per cent equity financing after raking in about N1trillion from the sales of the 10 gas-based power plants under the National Integrated Power Projects (NIPPs).
The transaction process has been on since 2014 when the bidders were announced.
Our reporter learnt that should the funding delay, government is ready to explore a loan source for the 15% from the Africa Development Bank (AfDB) to fast track the construction as the 85 per cent funding from China is already domiciled with the China Export Import (EXIM) Bank.
Senior Special Assistant on Media to Taraba State Governor, Silvanus Giwa yesterday confirmed the visit to the area by the Chinese firm saying they were there on a feasibility study preparatory to the commencement of the project.
On the issue of compensation Giwa said the Taraba State government was working towards creating the conducive environment for its payment which, according to him, had to come from the Federal Government.
“It is in view of this that the state government recently issued a warning to land owners at the place to stop selling land to speculators in order to avoid crisis in the payment of compensation”, Giwa said.
Also, a former deputy Speaker of the House of Representatives, Babangida Nguroje yesterday confirmed the visit by the Chinese to the Mambilla Hydro Power project site saying he was reliably informed that all necessary arrangements had been concluded for the take- off of the power project.
Nguroje who hails from Nguroje community on the Mambilla said: “I can confirm to you that the Chinese were at the project site yesterday and we have been reliably informed that they are making the necessary arrangements for the commencement of the project.”
He said the people of the Mambilla were excited over the project, especially following the recent visit to the area by former President Olusegun Obasanjo while assuring that they would give their maximum cooperation for the success of the project considering its potential economic benefits.
“We are psychologically prepared for the take- off of the project,” he said even as he appealed to the Federal Government to expedite action on its take-off.
Among the 27 active power generating plants in Nigeria, only three including Kainji, Jebba and Shiroro Generation companies (Gencos) are hydro based electricity source.
The other 24 plants are at the mercy of present vandals activities cutting short gas supply to them.
The country’s power grid had dipped to less than 2,000mw in this year and had barely risen to 4,133mw in mid-August when series of vandalism of gas pipelines crashed it to about 3,500mw yesterday, statistics from the Transmission Company of Nigeria (TCN) revealed.
Top most of the hydropower projects are the ongoing 700mw Zungeru project in Niger state, 40mw Gurara project in Kaduna state, 40mw Kashimbilla project and the mega 3050mw Mambilla project, both in Taraba

http://www.dailytrust.com.ng/news/general/3050mw-mambilla-hydro-power-project-set-to-start/161544.html#fWybDX4xlUT3WJUx.99

6 Likes 1 Share

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Beremx(f): 11:23pm On Sep 06, 2016
nice one from Fashola

31 Likes 2 Shares

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Grundig: 11:25pm On Sep 06, 2016
Headline is misleading.

For those who cannot be bothered to read...

Project is yet to begin. The engineers and officials went for site seeing.

113 Likes 7 Shares

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Ahmed0336(m): 11:39pm On Sep 06, 2016
Grundig:
Headline is misleading.

For those who cannot be bothered to read...

Project is yet to begin. The engineers and officials went for site seeing.
thank you my brother. I just suffer my eyes for nothing

37 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Grundig: 11:48pm On Sep 06, 2016
Ahmed0336:
thank you my brother. I just suffer my eyes for nothing
My guy, me sef vex as I read that thing.

One of tbe people wey follow go thete dey talk say they are psycologically prepared to take on tbe project.

Like say Na that one go bring light?

14 Likes 1 Share

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by idupaul: 11:51pm On Sep 06, 2016
Beremx:
nice one from Fashola

I didn't know Chinese men visiting a proposed site amounted to 3050 mws

17 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by asala1: 12:00am On Sep 07, 2016
Grundig:
Headline is misleading.

For those who cannot be bothered to read...

Project is yet to begin. The engineers and officials went for site seeing.

Thanks, you just saved a soul.

11 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Pavore9: 5:03am On Sep 07, 2016
“The Obasanjo government signed the contract with the Chinese firm in 2007 and if it was followed by now, we would have added 2600mw additional hydropower to the grid,”........Wasted 9 years! angry

By the way, the heading of the thread is misleading!

41 Likes 2 Shares

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Progressive01(m): 5:20am On Sep 07, 2016
Grundig:
Headline is misleading.

For those who cannot be bothered to read...

Project is yet to begin. The engineers and officials went for site seeing.
Had the Ineffectual Buffoon laid even a stone, we would have gone past the stage of "site seeing" a long time ago.

Clowns.

@ post:

Hopefully, this admin would bring about tangible progress on the project and deliver us yet another source of power independent of the activities of the Niger Delta saboteurs/terrorists.

The ineffectual buffoon never even laid a stone on the site and even the second Niger bridge he promised to deliver in his first tenure or go on self exile couldn't get past a couple of pillars, yet some idiots would come here pouring smelly brown spittle everywhere insulting this government and mocking her efforts.

Waiting for the day a bagger comes here to shout "thank you jonathan" when that bridge is completed.

61 Likes 3 Shares

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by greatgod2012(f): 5:40am On Sep 07, 2016
Beremx:
nice one from Fashola


My sister, are you sure you read this epistle before commenting?

The Chinese engineers have just gone for site seeing, nothing has been done yet.

4 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by ificatchmodeh: 5:47am On Sep 07, 2016
Why can't Apc work..with talking and plenty lies..
Who dem the gbo gbo with all this..
Project this..project that..na today?

-in a space of 2 years in this recession?
I don't wish ill to my country..am optimistic..but we first have to be honest with ourselves..

Make una first start work no be by talk..apc don the talk since pre election...chingbai we know see..stil dey talk after the win..

Work we still no see..
Na only hear we dey hear..see we no dey see..na wao!

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by porka: 5:52am On Sep 07, 2016
Pavore9:
“The Obasanjo government signed the contract with the Chinese firm in 2007 and if it was followed by now, we would have added 2600mw additional hydropower to the grid,”........Wasted 9 years! angry

By the way, the heading of the thread is misleading!

That was included in the article for a mischief purpose.

DailyTrust 'conveniently' overlooked Yaradua's tenure characterized by stalling, reversals and cancellations of Obasanjo's power sector reforms and projects and the revival of same by Jonathan accounting for the functionality of the several of the gas plants mentioned.

6 Likes 1 Share

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by juman(m): 6:16am On Sep 07, 2016
Pavore9:
“The Obasanjo government signed the contract with the Chinese firm in 2007 and if it was followed by now, we would have added 2600mw additional hydropower to the grid,”........Wasted 9 years! angry


You see. Wasted 9 years!
Hmmm
South West obj ruled nigeria for eight years and failed woefully.


But one cannot sure if this buhari is also serious to do the much needed project. You know he is also a general and man of that generation like obj.
Their generation comprises of very useless people.

2 Likes 1 Share

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by juman(m): 6:19am On Sep 07, 2016
If there is sensible government this country can raise conveniently more than 10mw from hydropower.

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Earth2Metahuman: 6:59am On Sep 07, 2016
thunder fire all our past leaders..

since 1982, nothing has been done on the site ... na was.
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Nobody: 7:14am On Sep 07, 2016
greatgod2012:



My sister, are you sure you read this epistle before commenting?

The Chinese engineers have just gone for site seeing, nothing has been done yet.
Lol lol lol that was subtle.
You killed it

2 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by dullardeen(m): 7:18am On Sep 07, 2016
Good one from Jonathan!

2 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Nobody: 7:20am On Sep 07, 2016
“I can confirm to you that the Chinese were at the project site yesterday and we have been reliably informed that they are making the necessary arrangements for the commencement of the project.”
“We are psychologically prepared for the take- off of the project,” he said even as he appealed to the Federal Government to expedite action on its take-off.
That's the summary of the whole ish which many of us would fail to note.
Learning to read between the lines is a skill we have to acquire if we really wanna be objective.
So my friends, don't roll out the drums just yet, just be hopeful.

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Flyingngel(m): 7:22am On Sep 07, 2016
Ok
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by 989900: 7:26am On Sep 07, 2016
If only . . . this would have taken us to a minimum of 7,000 MW . . . roughly a constant 8-12 hours uninterrupted supply on the average across board.
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Pavore9: 7:28am On Sep 07, 2016
juman:


You see. Wasted 9 years!
Hmmm
South West obj ruled nigeria for eight years and failed woefully.


But one cannot sure if this buhari is also serious to do the much needed project. You know he is also a general and man of that generation like obj.
Their generation comprises of very useless people.

OBJ signed the contract with the Chinese firm in 2007 when he was almost out of office but Yar'dua and GEJ did not follow through even if it had meant they review the terms of the contract.

6 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by 989900: 7:38am On Sep 07, 2016
The country’s power grid had dipped to less than 2,000mw in this year and had barely risen to 4,133mw in mid-August when series of vandalism of gas pipelines crashed it to about 3,500mw yesterday, statistics from the Transmission Company of Nigeria (TCN) revealed.

I pity those who support militants, but don't even have power supply to charge their phones.

12 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by juman(m): 8:02am On Sep 07, 2016
Pavore9:


OBJ signed the contract with the Chinese firm in 2007 when he was almost out of office but Yar'dua and GEJ did not follow through even if it had meant they review the terms of the contract.

Those two buffoon were continuation of obasanjo failure. Obasanjo forced them on nigeria.

Even why obasanjo himself could not do the project in his eight years presidency?

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Pavore9: 8:04am On Sep 07, 2016
juman:


Those two buffoon were continuation of obasanjo failure. Obasanjo forced them on nigeria.

Even why obasanjo himself could not do the project in his eight years presidency?

We are now paying for the successive incompetency!
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by juman(m): 8:10am On Sep 07, 2016
Pavore9:


We are now paying for the successive incompetency!

So painful.

Hope general buhari is not another useless leader.

We had so much hope in obasanjo presidency but he turned out not to be the messiah.

2 Likes

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by veekid(m): 8:16am On Sep 07, 2016
Good news
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Amanwulu1(m): 8:18am On Sep 07, 2016
Plz tell us when it is ready. We're starved of cheering news since the inception of this regime. Make us happy, tell us when u're through and be fast about dat co we're losing patience. Never really believed in ur change but did not expect it to b dis bad.

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Thobiy(m): 8:19am On Sep 07, 2016
Good development
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by Pavore9: 8:19am On Sep 07, 2016
juman:


So painful.

Hope general buhari is not another useless leader.

We had so much hope in obasanjo presidency but he turned out not to be the messiah.

We only have to hope it works out in this administration!
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by kolnel: 8:19am On Sep 07, 2016
Hope it pans out well
Lots of promises since last year may
Nigerians are really patient people

1 Like

Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by martineinstein(m): 8:21am On Sep 07, 2016
tell me its a lie!

If its only buhari can stabilize i would rate him the best
Re: 3050mw Mambila Hydro-Power Project At Gembu In Taraba Set To Take Off by wristbangle: 8:22am On Sep 07, 2016
We are still hoping

1 Like

(1) (2) (Reply)

Clampdown On Intels: Stay Clear Of Politics, Frank Tells FIRS, NPA / Western Nigeria Governors To Bid For Murtala Muhammed Airport Concession / Abimbola Adelakun: "Femi Adesina Did Not Change" -

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 43
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.