Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi (884 Views)

CCECC: Itakpe–Ajaokuta Rail Line And Track Works Passes Final Acceptance / Nigeria To Extend Electricity Line To Senegal, Ghana, Others / Senate Hails Buhari On Completion Ajaokuta-warri Rail During Test Run Inspection (2) (3) (4)

(1) (Reply) (Go Down)

Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by zoba88: 9:30pm On Aug 07, 2017
Itakpe-Ajaokuta-Warri rail line to start operation in June 2018- Amaechi

  Mr Rotimi Amaechi, the Minister of Transportation on Monday said the Itakpe-Ajaokuta-Warri standard gauge rail lines would start commercial operation in June 2018.
Amaechi made this known this while inspecting the ongoing rail project in Warri.

  He said that the Federal Government had instructed that the project must be completed by the first quarter of 2018, which was included in the budget.

  The minister said that the project was first awarded in 1987 and abandoned for over 30 years which would have been the first standard gauge in Africa.

“There are two phases of the contracts; the first one was awarded in 1987. We have a directive from the Federal Government that we must complete the Itakpe-Ajaokuta-Warri rail line and it was put in this year budget.

“By the end of December last year, we had disbursed some money to the contractors; Julius Berger and others to commence work, so we have come to see how far.

“We are constructing bridges too in order to reduce contact with humans beings who would try to cross the track because this is a speed lane and once it starts, it is going to be 120 to 150 km per hour because it is a standard gauge.

“If this contract was completed within the time it was awarded, Nigeria would have been the first country in Africa to have a standard gauge line.

“We need to get this place functioning and the directive of the Federal Government is, we should start and our target is that by June, commercial activities will resume,” he said.

He said that Julius Berger opted out of the project because it did not have equipment on ground after the Itakpe-Ajaokuta rail tracks was vandalised.

  The Itakpe-Ajaokuta track that was vandalised would be given to China Civil Engineering Construction Company (CCECC) because it has the facilities on ground to complete the project.

  He further disclosed that Julius berger would however handle the civil work to construct new yard, the 99 bridges, flyovers and refurbish the 178km yard in Agbor.

  Inspecting the railway village in Agbor, the minister ordered that the village with about 420 houses should be handed back to the ministry due to poor maintenance.

   According to him, the ministry would hand over the village to Julius Berger for totally rehabilitation which could be rented to workers.

  At the Abraka site, the minister directed the Team Nigeria Ltd.,  the project consultant to expand the bridges to accommodate two vehicles as the bridges constructed could only accommodate one vehicle.

   However, Mr David Imafidon, Julius Berger Site Engineer said that with the level of work ongoing, the project could be completed within the speculated time.

  He said that 99 bridges are to be constructed in the ongoing project with 12 rail stations to be constructed, adding that the overpasses to Agbor town were already completed.
Mr Chiedu Nwazojie, the Consultant of Team Nigeria Ltd. said  the company will make all the adjustments indicated by the minister to expand the bridges to accommodate more vehicles.
He said the June 2018 date given to them by the minister was feasible.

The News Agency of Nigeria (NAN) correspondent on the entourage observed that the rail site had abandoned facilities such as the wagons, communication towers, locomotives workshop, rolling stock depot and clinic.

  The rail site was constructed since 1994 but was not completed, while the Agbor, Abraka and Warri sites, the tracks and the environment were covered with thick vegetation.

cc; Lalasticlala, mynd44

Source: http://www.trezzyhelm.com/2017/08/itakpe-ajaokuta-warri-rail-line-to.html?m=1

Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by zoba88: 9:30pm On Aug 07, 2017

Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by zoba88: 9:34pm On Aug 07, 2017

Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by CoolFreeday(m): 9:50pm On Aug 07, 2017
Great!!!
Am loving this administration
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by Nobody: 9:52pm On Aug 07, 2017
Lovely,
Laudable to see the resuscitation and expansion on course,

However, Government superintending over capital intensive projects such as this have proven unsustainable and counterproductive, past experience was ladden with parsimonious avidity, rapacious devastation and cantankerous mind boggling embezzlement,

Issues of inadequacies, ineptitudness, inefficiencies,exacerbated the already aggravated discombobulated situation.

The moribund ajaokuta steel complex is still comatose, will the jinx ever get broken? ? ? ? ?

The General Electric concession deal to me is the magic wand,
Though, I'm no paragon of clairvoyance, With all fortnightness, I forsee GE, taking the bull by the horn,
With the GE manufacturing hub kicking off soon at calabar free trade zone,
The future could be so bright, that we might get blinded by it.
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by freshest4live: 9:59pm On Aug 07, 2017
CoolFreeday:
Great!!!

Am loving this administration
Shhhh they would come for your head.
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by EVarn(m): 10:03pm On Aug 07, 2017
Nigeria should target 12,000km rail coverage over the next 10 years. Railway will definitely boost the economy by opening up trade between zones of the country and providing cheap means of transport for heavy goods.
The FG should however endeavor to concede the Nigerian railway system to private companies for effective management and optimum service.
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by CarlosTheJackal: 10:10pm On Aug 07, 2017
We ve had more better promises. APC lies Cantonese
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by serenegroup(m): 2:49pm On Aug 08, 2017
why Nigeria don't have a functional and efficient rail network in this era really baffles me. Federal Government in my own opinion is doing a desirable job in trying to get this sector up and running but they should hand over the building and operation of this rail transportation to tried and trusted hands in the private sector so that what bedevilled the sector in the time past due to lack of maintenance Will not reoccur again. God bless Nigeria
Re: Itakpe-Ajaokuta-Warri Rail Line To Start Operation In June 2018- Amaechi by MEILYN(m): 2:52pm On Aug 08, 2017
Oh my gosh! What kind of substandard rail way is this? Nigerians are really gullible. These people allocate billions for a project and at the end of the day they come up with substandard infrastructure for unbelievable prices.

PDP AND APC are failures...

(1) (Reply)

IPOB Unrest: Nigeria Police Orders The Removal Of Abia State Police Commissioner / Just In: Federal Government Recovers $85m From UK On Malabu Oil Deal / Those Who Always Criticize ABA And Ebonyi Should See This

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.