Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,043 members, 7,818,127 topics. Date: Sunday, 05 May 2024 at 08:34 AM

PDP Abandoned 116 Water Projects Before Leaving Office In 2015 - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / PDP Abandoned 116 Water Projects Before Leaving Office In 2015 (6313 Views)

About Yam Eaters (pdp) Abandoned Secretarial / Complete All Ambode's Projects Before Starting New Ones, Sagay Tells Sanwo-olu / I Will Complete All Ongoing Projects Before Leaving Office – Fayose (2) (3) (4)

(1) (2) (Reply) (Go Down)

PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Tomis954: 2:43pm On Dec 24, 2018
Buhari inherited 116 abandoned, ongoing water projects – Minister
December 23, 2018Agency Report
The Minister of Water Resources, Suleiman Adamu, on Sunday said the federal government inherited 116 ongoing and abandoned irrigation and water projects from the immediate past government in 2015.


Mr Adamu told the News Agency of Nigeria (NAN) Forum in Abuja that President Muhammadu Buhari’s administration also inherited a liability of N89 billion.




Buhari's ongoing /completed projects.


Abia State
Rehabilitation of Enugu-Port Harcourt Road Section 1, Umuahia-Aba Township Rail/Road bridge crossing.
Amaudo (Ntalakwu-Bende) Flood & Erosion Control Project
Cassava processing Plant
Rehabilitation and Reconstruction of Enugu-Port-Harcourt dual carriage way Section 1, Lokpanta-Umuahia Tower, Abia.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along umuahia- Bende – Ohafia Road

Adamawa State
Reconstruction of Yola Mubi Bridge at Kaa’aShiwa and Mile 30- Kwambla Road
Rehabilitation of Gombe-Numan-Yola road, phase 1,
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ngurore Mayobelwa road

Akwa Ibom State
Construction of Ididiep-Ekpeyong 10.125km asphalt pavement.
University of Uyo Erosion and Flood Control Project
IkotEbok/ Mobil Pegasus School Flood and Erosion Control Project
Ikot-Ekpene Transmission sub-station
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ete-Abak road

Anambra State
Nanka Recent Landslide Project, Phase 1
Remediation Works on Nanka/Oko Gully Erosion Control.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nnewi – Ekwulobia – Umunze – Ibinta Road

Bayelsa State
Construction of Ogbia Nembe 25km road.
Sagbama Erosion Rehabilitation Works
Cassava processing Plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Mbiama – Yenagoa Road

Bauchi State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Bauchi – Gombe Road
Rehabilitation of Boto Dam, Tafawa Balewa LGA, Bauchi State
Construction of Road in Boto Town, Tafawa Balewa LGA, Bauchi State

Benue State
Construction of Loko-Oweto Bridge over River Benue in Nasarawa and Benue States.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Makurdi – Nasarawa State Border Road
Rehabilitation of 120 Poles Solar Street Lights on Katsina-Ala Bridge
Rehabilitation of Street Lights on Makurdi Bridge at Makurdi

Cross River State
Dualisation of Odukpani – Itu – Ikot Ekpene Road in Cross River 9.7 Km/ Akwa Ibom State with a spur to Ididep 12.2 Km.
Gully Erosion Control Project at Eastern Naval Command Headquarters
Rehabilitation of Aleshi-Ugep Road, Iyamoyun-UgepSectionin Cross River State.
Cassava processing Plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Calabar – Oban – Ekang Road

Delta State
Completion of the Itakpe – Ajaokuta – Warri (Aladja Jetty) Railway Line and from Aladja to Warri town Port, Refinery and from Itakpe to Abuja.
Establishment of Pilot Briquetting Plant
Construction of 23.6km Asphalt Gbaregolor Ogulagha road with 2 bridges measuring 651m.
Construction of Tebu-Gbokoda pavement road network for the Olero Creek indigenes covering about 6 communities.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Amukpe – Eku – Abraka – Umutu – Agbo (Edo State Border)

Ebonyi State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Afikpo – Okigwe Road

Edo State
Auchi Poly-Ekperi-Uzea-Ohe with a spur to Fugar-Afuda-Usugbenun road Section 1 and a pedestrian bridge at Auchi poly gate.
Construction of Ekpoma-Uhiele 31.1 km road in Esan West.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Benin – Auchi – Okene Road
Construction of 46.5km Udo Ofunama asphaltic concrete road-7.3m wide.
Azura 450MW Independent Power Project
Provision of Street Lights at Benin – Sapele Interchange along Benin – Sapele Road

Ekiti State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ado – Igede – Itawure – Osun State Border Road

Enugu State
Rehabilitation of Enugu–Onitsha dual carriageway.
Obinagu/Akpulu/ EnuguezeUmunneobagu Soil Erosion And Flood Control Project
Soil Erosion, Flood Control and Road Improvement Works at Federal College of Education, Eha-Amufu
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Nsukka – Adani – Anambra State Border Road

Federal Capital Territory, Abuja
Murtala Muhammad and Umar Musa Yar’Adua express ways
The Circle Road that envelopes the Central Business District.
The Nyanya-Gbagalape road
The Abuja Rail Mass Transit system. The total length of the rail double track laid is 45.245 kilometres
ICT innovation Hub
2MW solar power plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along kaduna road.
Provision of Street Lights at Giri interchange along Abuja – Lokoja Expressway
Provision of Street Lights at Kakao, Old Toll Gate along Abuja – Kaduna Road
Abuja – Kaduna Standard Gauge Railway

Imo State
Construction and Dualization of Port Harcourt/Owerri Road Junction.
Rehabilitation of Washed Away Internal Road and Rebuilding of Nwaorie Bridge at AlvanIkoku College of Education
Construction of Isinweke Oriaha, Uboma Road: a 16km road awarded in 2012, and picked by the Buhari-led administration.
Umuoki-Umuowasi Erosion Control and Road Improvement Works.
Cassava processing Plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ihiala – Umuduru Road interchange at EzeudoAmaokpa and Zimuzo Roads

Jigawa State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kano State Border – Garki – Gukel – M/Madori – Hadejia Road

Kaduna State
215MW Dual-Fired Plant in Kudenda
Rehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Zaria – Pambegua

Katsina State
Daura Township Erosion Control, Phase 1
Daura Township Erosion and Flood Control Project, Phase II
Katsina Wind Farm which has an installed capacity of 10.175MW
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Katsina – Batsari – Safana Road
Construction of Daura Township Roads

Kebbi State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kalgo – Bunza – Kamba – Peka Road

Kogi State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Okene – Ibillo Road
Nigeria
Remediation of Lead Contaminated Sites in Shikira, Rafi Local Government Area
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kontagora – Tegina Road
Rehabilitation of 120 Poles Solar Street Lights on Jebba Bridge, Jebba

Lagos State
The construction work on the Lagos – Ibadan Railway Standard Guage Rail line with extension to the Lagos Port Complex at Apapa, Lagos.
Lagos Shoreline Protection/ Rehabilitation Works
Gully Erosion Works at Magodo, Lagos State
Oghere Ahmed Erosion Control Works
Establishment of Pilot Lagos State Briquetting Plant
ICT innovation Hub
Rehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way, Section 1, Lagos-Sagamu.
Rehabilitation, Reconstruction and Expansion of Lagos-Ibadan dual carriage way.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along 3rd Mainland Bridge (Oworo Toll Gate)
construction of 60-room Hostel block for Artisans and Craftsmen at Onikan.

Ogun State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Abeokuta – Sango Ota Dual Carriageway

Plateau State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gimi Road

Rivers State
Rehabilitation and reconstruction of the moribund Rail system in the Port Harcourt port.
Construction of KAA-ATABA Road and Bridges: Originally awarded in 2012, Kaa-Ataba road connecting to Andoni/Opobo LGA was picked up by President Muhammad Buhari’s administration.
Dredging and Reclamation of 600 Hectares of swampy land with 60 million cubic meters of sand at the Onne Port, Port Harcourt, Rivers State, to enable port expansion at the Ocean terminal.
The Ogoni Land Clean-up and remediation project
Cassava processing Plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ahoada – Okoku – Okwuzi Road

Taraba State
The Kashimbilla Hydropower plant
3050MW Mambilla Hydro Power Plant
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Jalingo – MutumBiyu – Wukari Road

Nasarawa State
Completed the Inner Southern Expressway (ISEX), which is the expressway providing rapid East-West movement to the southern flank of the city linking the Abuja-Keffi road
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Lafia – Makurdi Road

Kwara State
Rehabilitation of Ilorin-Jebba-Mokwa-Birnin-Gwari-Kaduna Road Section 1.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ilorin – Ganmo – AjaseIpo, Road
Installation/Rehabilitation of Street Lights on Ilorin-Ibadan Expressway Geri Alimi) Spur, Ilorin
Rehabilitation of Street Lights on Ogbomosho –Ilorin road, Spure Geri Alimi by (Eyienkorin) Ilorin

Oyo State
Dualisation of Oyo-Ogbomosho-Ilorin Oyo-Ogbomosho-Ilorin, Section II (OyoOgbomosho).
Kudeti Flood Control Works
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ogbomosho – Dogo – Igbetti Road
Construction and rehabilitation of Iseyin – Okeho
Provision of Street Lights at Ogbomosho Interchange along Ibadan – Ogbomosho – Ilorin Expressway, (Phase II) Ogbomosho

Ondo State
Cassava processing Plant
Construction of 13KV transmission line and 132/33KV Substation at Okitipupa, Ondo.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ore – Okitipupa Road

Osun State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Ibadan – Ife Dual Carriageway
Construction and rehabilitation of Elentere Apipontoro Road
Gombe State

Rehabilitation of Gombe-Numan-Yola road, phase 1.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gombe – Dukku – Darazo Road

Kano State
Dualisation of Kano-Maiduguri road section iv, (Potiskum-Damaturu)
Dualisation of Kano-Katsina Road phase 1.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along KwanarDumawa – KunyaBarubaJigawa State Border Road
Construction and Rehabilitation of Saminaka – Doguwa
Construction and Rehabilitation of Doguwa – Tiga
The execution of Kano – Kaduna Rail line
Lagos – Kano Railway Modernization Project

Sokoto State
Rehabilitation of Sokoto-Tambuwal-Jega road-Kotangora/makera road in sokoto/Kebbi/Niger States.
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Kajiji – Jabo – Zamfara State Border

Yobe State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Damaturu – Dapchi – Bayamari Road

Zamfara State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Gusau – TalataMarafa – Sokoto State Border Road

8 Likes 3 Shares

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Nwodosis(m): 2:45pm On Dec 24, 2018
Source :- APC beer parlor!

7 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Tomis954: 2:55pm On Dec 24, 2018

16 Likes 2 Shares

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Ekez(m): 3:02pm On Dec 24, 2018
And Apc abandon nigerians since 3yrs plus.

12 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by morikee: 3:14pm On Dec 24, 2018
PDP the evil party

18 Likes 2 Shares

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Nwodosis(m): 3:14pm On Dec 24, 2018
APC still want to use 2015 campaign propaganda format, PDP did this, PDP did that for 2019 again?
Buhari should be in the presidential debates to tell us all the good works he has done, we want to hear from the horse's mouth!

14 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by victorazyvictor(m): 3:15pm On Dec 24, 2018
And how many have you completed?

A good and responsible government can only abandon project because of some unforeseen issues, but irresponsible government abandon its people.

PDP has vision BUT
APC has no future.

22 Likes 1 Share

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by didfy: 3:15pm On Dec 24, 2018
And you did what with them? You forgot to include the railways that you took the glory.

APC + PDP = The same

5 Likes 2 Shares

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by deboysben(m): 3:15pm On Dec 24, 2018
Apc let me ask you do you know how much and many projects pdp inherited after military destructive rules?


APC has failed let pdp take over

It's only when you don't know what to do that you are reduced to blaming.

8 Likes 1 Share

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by kolnel: 3:15pm On Dec 24, 2018
Enough of pdp didn’t do this
Pdp didn’t do that

That’s why pdp will never rule us again
They are bunch of losers

1 Like 1 Share

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by zabuur: 3:16pm On Dec 24, 2018
Even if I'm not in support of APC. Let's clarify this.

A lot of us never knew the posts of reps and senators were this juicy until OBJ and co wanted to go for 3rd term.

All d foundations of corruption were built by PDP. They have never known opposition. There was a time PDP was known as the most powerful party in the world.

Unfortunately, there was absolute nothing to show for it. Even with a candidate involved in their first 8 years and wants to comeback.

Atiku's come back seems to me like the movie 'Blue Streak' where Martin Lawrence had to return to a building where he hid a stolen diamond and found out it has been changed into a police station. He disguised as a police officer to gain d chance to steal back his diamond.

7 Likes 3 Shares

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Sirheny007(m): 3:16pm On Dec 24, 2018
Why blame PDP when they decamped to APC?

7 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Nobody: 3:16pm On Dec 24, 2018
Blame game..


Laughing

2 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by SarkinYarki: 3:16pm On Dec 24, 2018
so come Lagos which has been APC state for 19 years now doesn't have pipeborne water for any of it's 20 million inhabitants neither is any being built ..? stop making incompetence sound like a PDP thing when it's also an APC thing

10 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by 12345DKO(m): 3:16pm On Dec 24, 2018
At least they started and abandoned. You and your boss too should at least start something. Still blaming PDP after 3 years in office, na wa for una o.

8 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by godwinstringed1(m): 3:17pm On Dec 24, 2018
grin
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Nobody: 3:17pm On Dec 24, 2018
Yes they abandon them what are you doing to make them work?

4 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by mustmust(m): 3:17pm On Dec 24, 2018
APC has bought over premium times or what

2 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by berrystunn(m): 3:17pm On Dec 24, 2018
Yes we will vote PDP to complete them

5 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by 1solution: 3:17pm On Dec 24, 2018
For God's sake when will this useless party shut the Bleep up and do what they are voted to do.governace
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by RomeoEmpire(m): 3:18pm On Dec 24, 2018
.Avoid missing, stolen or kidnapped Chicken this Christmas and New Year. Get a Chicken Tracking device for just N3,500! Tested and trusted! Even if it is slaughtered and fried, the device would detect the Chicken in the pot Call me on my number to order yours now! now!. Thanks for ur patronage Tomorrow might be too late!

4 Likes 1 Share

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by YurFatHer: 3:18pm On Dec 24, 2018
After since obasanjo left power, PDP has being a curse to Nigeria.

1 Like 1 Share

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by ednut1(m): 3:18pm On Dec 24, 2018
More than 3 years later pdp still dey der mouth. Wakanda useless pple are these

3 Likes

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Jokkarm2: 3:18pm On Dec 24, 2018
OGA UNA PROMISE CHANGE, DO THE CHANGE AND STOP COMPLAINING.
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by budusky05(m): 3:18pm On Dec 24, 2018
Same way wike scammed Rivers people with water project.
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Omeokachie: 3:18pm On Dec 24, 2018
.

1 Like

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by safetyInspector(m): 3:18pm On Dec 24, 2018
So if APC is voted out by 2019 will we term any of their ongoing projects as an abandoned project?
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Bitterleafsoup: 3:18pm On Dec 24, 2018
Dummies you were suppose to continue where they stop, but instead you did nothing for 4 years so you are the ones that abandoned the projects.

Now just before election you want to make a To Do List

Go to hell Daura
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Suprises: 3:19pm On Dec 24, 2018
Season greetings to my fellow Nairalanders!

This is an appeal to good and kindhearted forumites. I have been having problems ever since I was duped of my hard earned money by fraudsters. Since then life has become unbearable for me. Things has become soo difficult for me that I cannot even afford transport money to take my properties to the village so I can start building my life from the village because paying house rent here is no longer affordable for me and I've been served Quit notice from my landlord.

Any good nairaland who can volunteer to help me in anyway financially or accomodate me in his house for this festive period would be relieving me from depression.
Please help an unfortunate brother. Thanks!
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by greatdreamer(m): 3:19pm On Dec 24, 2018
Four years in office, they are still blaming PDP, give them another four years, they won't stop to blame PDP.
Bunch of incompetent beings
Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by PointZerom: 3:19pm On Dec 24, 2018
Ebonyi State
Patching of potholes, pavement strengthening, repairs of failed sections and general maintenance works along Afikpo – Okigwe Road"




You can imagine what Buhari has done for the people of Ebonyi in 4 years.

1 Like

Re: PDP Abandoned 116 Water Projects Before Leaving Office In 2015 by Philinho(m): 3:19pm On Dec 24, 2018
Useless people,Wasted government

1 Like

(1) (2) (Reply)

NNPC Allays Fears On Ikeja Gas Leakage, Depressurizes Pipeline / North Is Provoking Nigerians: Civil War Looms — Lam Adesina / The Man Behind Buhari(colonel Mohammed Lawal Abubakar)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 51
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.