Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,610 members, 7,813,000 topics. Date: Tuesday, 30 April 2024 at 03:17 AM

DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] - Properties (6) - Nairaland

Nairaland Forum / Nairaland / General / Properties / DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] (40867 Views)

DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] / DIY Construction Of My House In PH. / DIY: Construction Of 4 Units Of 2-bedrooms Terraces [Ikorodu-I] (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 8:35pm On Jul 23, 2015
So sorry for the slow updates, its been rather hectic sourcing for finishing materials and managing the site and artisans.

Work has been completed on the roof slab and roof beam and the blockwork for the parapet wall will begin tomorrow.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by erico2k2(m): 10:13pm On Jul 23, 2015
Hello, nice work, can I see teh smoothness of under the slab you used the marine boards on plz. Im thinking it wil to plaster.l be smooth enough not
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 10:35pm On Jul 23, 2015
Plastering of the interior space is in full swing and will be done within a week before moving to the exterior plastering.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 1:24pm On Jul 25, 2015
@erico2k2, sorry I don't understand your question but I will post the picture of the under slab where we used the marine board once I get a clear shot but its smooth enough that we are going to do POP screeding straigth on it.
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by erico2k2(m): 3:17pm On Jul 25, 2015
BITSWORKS:
@erico2k2, sorry I don't understand your question but I will post the picture of the under slab where we used the marine board once I get a clear shot but its smooth enough that we are going to do POP screeding straigth on it.
ok.that was my request.to see how smooth the under slab is frm use of marine board
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 12:08pm On Jul 26, 2015
Blockwork on the parapet wall ongoing.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by Nobody: 12:22pm On Jul 26, 2015
BITSWORKS:
Blockwork on the parapet wall ongoing.
lovely and great work boss, Pls check out our works at Perfect Touch Aluminium . Tel:08153665659,08067079715. Thanks boss
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 5:10am On Jul 29, 2015
Blockwork on the parapet wall roof gable almost done, just one more wall to build. I don't like high places but this work has made me overcome my fear of heights.

Its a very lovely view from up here and the breeze is something else.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 5:12am On Jul 29, 2015
@adeekiti, you did not provide a link to view your work sir?
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 5:19am On Jul 29, 2015
Work on the parapet wall coping formwork is also ongoing, we should be able to cast the coping by Thursday.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by Nobody: 6:59am On Jul 29, 2015
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by Nobody: 2:10pm On Jul 29, 2015
Great work, I sight from here
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 9:17am On Jul 31, 2015
@erico2k2, the pictures you requested for the slab underneath.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by twinskenny(m): 11:34am On Jul 31, 2015
wow weldone sir... the building looking great

dont forget to call for dstv cctv in case you have need of it.

thanks
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by omoola007(m): 1:16pm On Jul 31, 2015
Nice work. looks like you are getting to the hardest part....finishing

I just have an observation and suggestion. The side walls of the terrace house should have windows. Instead of have just block work on the sides, window will bring in more ventilation, more lighting and overall more ascetics to the building. it will also add value compare to the middle unit. it's a fix that can still be done before proper finishing commences.

i live in a terrace house now with the same ugly side that is facing the street. Add some character with window for ventilation and light. it will even make the rooms seem bigger.

just my 2 kobo.

1 Like 1 Share

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by FastShipping: 2:02pm On Jul 31, 2015
omoola007:
Nice work. looks like you are getting to the hardest part....finishing

I just have an observation and suggestion. The side walls of the terrace house should have windows. Instead of have just block work on the sides, window will bring in more ventilation, more lighting and overall more ascetics to the building. it will also add value compare to the middle unit. it's a fix that can still be done before proper finishing commences.

i live in a terrace house now with the same ugly side that is facing the street. Add some character with window for ventilation and light. it will even make the rooms seem bigger.

just my 2 kobo.

You are right. I saw the same thing too and I just kept quiet.
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by mufutau55(m): 2:05pm On Jul 31, 2015
omoola007:
Nice work. looks like you are getting to the hardest part....finishing

I just have an observation and suggestion. The side walls of the terrace house should have windows. Instead of have just block work on the sides, window will bring in more ventilation, more lighting and overall more ascetics to the building. it will also add value compare to the middle unit. it's a fix that can still be done before proper finishing commences.

i live in a terrace house now with the same ugly side that is facing the street. Add some character with window for ventilation and light. it will even make the rooms seem bigger.

just my 2 kobo.

@Omoola007
We don't make much use of windows as another source of ventilation and lighting in Nigeria... but we are getting there.
Good observation.

Hajji M.
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by CarpeDiem: 6:31pm On Jul 31, 2015
sorry so what are windows for?
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 7:46pm On Jul 31, 2015
@omoola007, thanks for the observation it is well noted. However, that particular wall does not have any room space, just the stairwell and the toilets. Windows are quite important for ventilation and natural lighting and I appreciate your advise.

@Hajj M, thanks.

1 Like

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by erico2k2(m): 8:25pm On Jul 31, 2015
BITSWORKS:
@erico2k2, the pictures you requested for the slab underneath.
xlent, well will one achieve same if we use normal 1x12 board plus DPM on it?,I like the idea of smoothness,just lil bit of dressing needed then paint.
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 10:42pm On Jul 31, 2015
Roof woodwork started this morning and we should be through by Sunday. The roof cladding work will start immediately.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 10:35am On Aug 01, 2015
Window works in progress, some of the windows ordered have been delivered and they are just coupling the handles. Once the external plastering is concluded the windows will be fixed.

We are actually on go-slow mode since we started the finishing work but we are moving at a steady pace.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 6:31am On Aug 04, 2015
Ongoing work on the roof gable walls and the facial boards.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by Dominionng(m): 6:33am On Aug 04, 2015
God speed Boss.
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by TinoTino(m): 1:57pm On Aug 04, 2015
It's coming out greatly sir
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 7:21am On Aug 08, 2015
The roof slab block wall has been completed and plastered, what is outstanding is the coping to be casted on it. The gable wall has been plastered also and once all roof slab work is completed, we can then clad the roof.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 11:16am On Aug 09, 2015
Work is already ongoing on the electrical conduiting for the second floor, once it is concluded the 2nd floor wall plastering will start.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 7:21am On Aug 10, 2015
The roof cladding work started yesterday morning and by evening, we were already done with 2 units. One more unit to do and the flash bands.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 9:09am On Aug 10, 2015
More roof cladding pictures

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by kopell: 1:03pm On Aug 10, 2015
@Bitworks good job weldone Ooo. Pls what is the name of this roofing materia, Can you share more light on it cost per SQM?
Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by BITSWORKS: 1:44pm On Aug 10, 2015
@kopell, thanks for the compliments.

The roof cladding material is Onduvilla, its light weight, reflects heat and noise proof. Its made from bitumen and fibre and does not degrade or change colour. It cost between N2600 - N2800 per square metre, 3.23 sheets make a square metre.

Re: DIY: Construction Of 3 Units Of 4-bedrooms Terraces [Surulere-I] by kopell: 1:59pm On Aug 10, 2015
Thanks stay blessed.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

Notorious Ota Land-Grabber Elijah Adeogun aka Killer Arrested In Ogun State / Qatar Begins Construction Of 500,000 Housing Units For Less Privileged In Kaduna / 4 Bedroom Bungalow Enquiries on Design, Construction and Cost

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.