Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:28am On Jun 14, 2017 |
Starting to cast............
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:35am On Jun 14, 2017 |
More pictures from this decking cast...........
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:42am On Jun 14, 2017 |
More...........
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 5:31am On Jun 18, 2017 |
Forming the partitioning walls for this house......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 5:32am On Jun 18, 2017 |
We keep moving. .......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 8:30pm On Jun 21, 2017 |
Block wall partitioning for rooms in progress.
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 8:43pm On Jun 21, 2017 |
The look of the house from the outside. ..........
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 9:10pm On Jun 24, 2017 |
My iron fitters are busy here......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 9:11pm On Jun 24, 2017 |
Front. .......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 6:14am On Jun 27, 2017 |
Works on the frontal columns and a look from the left wing of the house. .......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by Hum2020: 9:32pm On Jun 28, 2017 |
What's a nice work please continue with you good work i love this |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 6:49am On Jun 29, 2017 |
Hum2020: Thank you very much, I will not rest till this house will be as fine as the 3D image
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by mufutau55(m): 7:09pm On Jun 29, 2017 |
spyder880: That is always a usual "Sure banker" statement from you. And it shall be done by God grace. Hajji M. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:21pm On Jun 29, 2017 |
mufutau55: Amen. Thank you big boss. |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by Nobody: 2:44am On Jun 30, 2017 |
Op, txs for this laudable project and d update you post. What is the cost implication of this project ? |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 5:03am On Jun 30, 2017 |
Connection2017: The budget for the construction of this house is about N22m, but we are working to reduce the cost by reusing some materials like wood. We will have to reuse the decking wood for lintels. |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by Badgers14: 8:25am On Jun 30, 2017 |
spyder880: Wow, That's one mighty house you are building my friend. I had thought the budget would exceed 22m but what do i Know |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 9:10am On Jun 30, 2017 |
Badgers14: Construction only oo (foundation till roofing is completed) Finish not yet calculated. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by cyrano29: 10:37am On Jun 30, 2017 |
Good day spyder880. May I ask the size(dimensions in feet) of this structure. |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 9:42pm On Jul 04, 2017 |
cyrano29: 64 ft x 60 ft. Sorry for my taking too long to answer. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 9:53pm On Jul 04, 2017 |
We are still doing some work in this house. And waiting for the decking wood to be free so we can reuse them.
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by whirlwind7(m): 2:16pm On Jul 05, 2017 |
spyder880: Wasn't sure decking woods can be reused. Was thinking it can only be used once? Will they be strong enough to be reused for a second decking work? |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by mgbadike81: 6:18am On Jul 06, 2017 |
spyder880:what would be your ball point estimate to build three stories of three bedroom flats in anambra if the funding would be made available in a lump.i want your lowest quote and estimated time for completion. |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:37am On Jul 06, 2017 |
mgbadike81: 25m from foundation till roofing is completed, 0.45 aluminium sheets. This figure is for materials, labour and supervision till the roofing is done. We can complete the work in 150 days. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:40am On Jul 06, 2017 |
whirlwind7: Yes Sir, we can reuse decking wood. There is this specie of wood we call the "agba" and it has some elastic properties. We can reuse the, especially the ones used on the flat decking floor. |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by mgbadike81: 9:42am On Jul 06, 2017 |
spyder880:does the amount include finishings like toilet seats, the finishing would be basic for rental purposes |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 10:46am On Jul 06, 2017 |
mgbadike81: No Sir, the amount stops exactly where the roofing sheets are installed . There will be no ceiling sheets, no parapets, no plastering, no electrical wiring and no plumbing or tiles included in the above amount. But your location could make this amount reduce, the condition of the land ,and other environmental factors can make us go lower on costs. Thank you. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by jabolo(m): 11:03am On Jul 06, 2017 |
spyder880: Doesn't it make sense for some plumbing and electrical conduiting to be done during decking preparation to avoid chiselling later? May I join others in congratulating you on your continued professionalism, patience and courtesy. 1 Like |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 11:11am On Jul 06, 2017 |
jabolo: Thank you Sir, all electrical piping works (and any plumbing needed is included in the above plastic pipes, knockout boxes etc) were done as we did the decking and is inside the decking slab. The electrical I was saying is not inclusive is the purchase and fitting of electrical wires, distribution boards and other lighting fittings which is usually done as part of the finish process. Welcome Sir. 2 Likes |
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 6:54pm On Jul 08, 2017 |
Our work on the frontal columns......
|
Re: New 6 Bedroom Duplex Construction By Tigerkenn Homes by spyder880(m): 7:21pm On Jul 08, 2017 |
More....
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)
How Much Will It Cost To Finish This Building Please? (pics) / Man Singlehandedly Saved A Filling Station From Burning Down. Photos And Video. / Solar Inverters: Cost Implication, Durability And Issues
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 44 |