Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,543 members, 7,812,692 topics. Date: Monday, 29 April 2024 at 05:38 PM

Construction Of Duplex And Attached Flats At Osapa London Ajah - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of Duplex And Attached Flats At Osapa London Ajah (18441 Views)

Construction Of Duplex And Attached Flats @isheri North GRA Lagos / Construction Of Duplex And Attached Flats @isheri North GRA Lagos / 670sqm Land for sale at Osapa London....7mins WALK to Shoprite (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 4:42pm On Apr 19, 2015
Construction of 2 Storey building of duplex and four units of 3 bedroom flat at Osapa London ajah Lagos state.
The raft and block setting to lintel level has been done by aventures.
Is a collaboration work.
We're going to start from the first floor slab
Seat back and watch the construction of this building by universal solutions associates limited.

2 Likes 1 Share

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:28pm On Apr 19, 2015
We're to engage our carpenter in order to commence work.
I will personally be on site for close monitoring and supervision for perfect job. and good finishing.
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:43pm On Apr 19, 2015
All the structural elements are perfectly okay.
The environment is friendly.
The road is good
There are buildings around..
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:58pm On Apr 19, 2015
Carpenter at work.
Working on the floor and the stairs.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by topsy23: 9:12pm On Apr 19, 2015
For your Electrical, plumbing design drawing and
installation. Contact us
For further info call 08033643191 or 08051750560
Email; atope23@live.co.uk,
topselg.engineering@gmail.com
You can visit our thread:
https://www.nairaland.com/1804476/complete-
package-design-drawing-electrical
https://www.nairaland.com/1233943/contact-us-
electrical-mechanical-plumbing/9
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 10:55pm On Apr 19, 2015
We shall continue to carry you along. By posting pictures of what is happening on site when and how. From one stage to another. From one level to the next level.
Thanks for following me, I appreciate you all. Will never disappoint you by God's grace.
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 2:15pm On Apr 20, 2015
Materials for formwork

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 2:33pm On Apr 20, 2015
The Iron rod (pulkit) reinforcements bar.for beams and floor Is time for iron bender (steel fixer ) to do what they know how to do best .alongside with carpenter.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 2:46pm On Apr 20, 2015
Working on the beam reinforcements. According to structural details and bending schedule.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 10:46pm On Apr 20, 2015
The iron men at work, performing extremely well. Good job and well done.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 10:57pm On Apr 20, 2015
Continue to watch the ironbender and the Iron in the ongoing construction

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:19pm On Apr 20, 2015
What you are looking at is first floor reinforcements bar, under the Iron is DPM nylon laying on the formwork, before arranging the Iron rod on the nylon. The concrete slab, expecialy under the concrete, after removing the formwork (headroom )will come out beautifuly and there will be no need for plastering.this nylon retaining the water in concrete and it gives it more strength. Will show you the pictures when we get there

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:23pm On Apr 20, 2015
Work continues

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:36pm On Apr 20, 2015
Men at work, the electrical pipes will come up next. The plumber will also fixe the necessary pipes in the areas that is needed and necessary. We show you as it comes up.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:41pm On Apr 20, 2015
Electrical pipes

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by Nobody: 12:38am On Apr 21, 2015
lafolabi:
What you are looking at is first floor reinforcements bar, under the Iron is nylon laying on the formwork, before arranging the Iron rod on the nylon. The concrete slab, expecialy under the concrete, after removing the formwork (headroom )will come out beautifuly and there will be no need for plastering. Will show you the pictures when we get there

Please explain this technique in more detail when you get a chance.
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:37am On Apr 21, 2015
Pipes

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:43am On Apr 21, 2015
Casting of first floor concrete slab

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 9:54am On Apr 21, 2015
Prescribed mixes is 1:2:4 which is standard quality for reinforcement concrete floor slabs (is call proplapin water proofer )we have in standby 3 pocker vibrator for vibrating the concrete. We use stonedust, inplace of sharp sand. Is a job well done.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 2:03pm On Apr 21, 2015
Semicircle terrace for the duplex

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 5:51pm On Apr 21, 2015
Side view .the concrete beams are 0.450 by 0.223 it projects by 1mt

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:30pm On Apr 21, 2015
Left side view

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:18pm On Apr 26, 2015
Lintel level.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 8:41pm On Apr 26, 2015
Materials for second floor formwork.
The purpose of formwork is to Contain freshly placed and compacted concrete, until it has gained enough strength, to be self-supporting, to produce a concrete member of the required shape and size. And to produce the desired finish to the concrete

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 9:20pm On Apr 26, 2015
Formwork should be sufficiently rigid to prevent undue deflection during the placing of the concrete

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 9:32pm On Apr 26, 2015
You can reach us with this contact. 2348066357743 , 2349090891067. or unisociate@gmail.com and unisociate@ymail.com. for building and construction undertaken
Building construction supervision, property management and land procurement .
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 12:29am On Apr 28, 2015
Formwork should be designed to resist all loads expected from the concrete.
The strength of formwork, although very important, is often secondary to its stiffness under load, otherwise the resulting concrete surface will show the deformation.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by EndiaSami: 10:45am On Apr 28, 2015
lafolabi:
Formwork should be designed to resist all loads expected from the concrete.
The strength of formwork, although very important, is often secondary to its stiffness under load, otherwise the resulting concrete surface will show the deformation.
boss lafolabi, good day nice job so far. Please view my thread www.nairaland.com/2163896/building-incomplete-it-lacks-these let me know what you think. 07036341294
Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:26am On May 03, 2015
Reinforcement.
reinforcemen may consist of round steel bars, welded mesh fabrics or deformed bars

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:38am On May 03, 2015
The preferred nominal sizes of bars are giving in schedule. Where it is necessary.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by lafolabi(m): 11:55am On May 03, 2015
The cutting and bending dimensions of reinforcement should be given .for proper cutting and bending.

Re: Construction Of Duplex And Attached Flats At Osapa London Ajah by EndiaSami: 12:14pm On May 03, 2015
lafolabi:
The preferred nominal sizes of bars are giving in schedule. Where it is necessary.
. Boss please view www.nairaland.com/2163896/building-incomplete-it-lacks-these lemme know what you feel and we can discuss later.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

Fire Guts Building In Warri, Man Suffers Life-threatening Burns (Graphic photos) / Arson - My House Deliberately Set On Fire (pics) / A Dangerous Trend I've Observed In Filling Stations

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.