Installation of the steel stanchions.
|
The finished work.
|
More pictures
|
Casting of the suspended german floor/oversite concrete. We had dumped 2 trips of 30 tons granite and 4 trips of 20 tons sharp sand. The thickness of the slab is 6inches ( 150mm ) and the mix ratio is 1:2:4.
|
Rubbiish:Unfortunately, I had a mishap with my phone on site and lost those pictures due to formatting of the memory. However, the pile points are 40 in all with 24 pile cap and we used percussion machine with casing. It took about 30 days to complete the boring, casting of pile points, pile caps and tie-beam. Yes, we are not backfilling the trenches. The german/over site concrete slab will be suspended. |
twinskenny:Thanks Twinskenny. |
mufutau55:My oga Hajji M, am loyal sir. Am pleased to be back too, have missed this forum. |
Reinforcements mat work on suspended wood platform formwork.
|
EgunMogaji:Yes sir, one way trip. Its a suspended floor slab so it removes the backfilling stage. Plus and minus variable cost of backfilling against cost of losing the woods. |
Dominionng:Yes boss, its been a long hiatus for me. Juggling work and updating projects progress became a hassle due to fatigue, but am back now. How have you been? |
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers. We currently have a brief for a client to construct a church auditorium using steel stanchions as the framework and blockworks for the facade carcass. There is an existing church auditorium building on the land and this will be demolished once the new auditorium is completed. We will share the floor plan, elevations and 3D views once we have permission from the client. Size of land - 1075.2sqm Total area of building - 416.0sqm Estimated budget for construction - currently unknown PROJECT timeline - 6 months We have started with the foundation work which is a pile foundation and work is moving at a steady pace. We will be casting the suspended german floor soon. Reinforcements work is ongoing on site.
|
Yes we can and we will. We have scaffoldings for rent/lease to construction companies, builders, contractors and artisans. Kindly contact BITSWORKS via the following channels to book your lease. We offer competitive rates and excellent customer service. Hotline - 08022228584 / 08072555901 Whatsapp/Call - 08188569130 / 08022228584 Email - seyisodiya@gmail.com |
andycom:N1.2mill |
TheTrueApostle:N1.2mill |
rexana:Ikorodu |
Specification: Condition - Nigerian Used Body Type - SUV Drive Type - AWD Fuel - Petrol Drive Setup - Lefthand Drive Transmission - Automatic Interior Type - Leather Door Count - 4 Engine Size -2.4L Year - 2007 Description: Clean 2007 Honda CR-V with reverse camera, green color and cream leather Interior. Fault: Change the No. 2 plug head/piston or change the engine. Engine cost is N270k. Contact 08072555901 or 08027484242
|
Gate columns all done and being allowed to cure. We won't remove the wood and bamboo bracing for another 2 weeks.
|
After the staging of the gates, the carpentry formwork and reinforcements work is done and it is then casted. We used a concrete mix of 1:2:4 . The size of the gate pillar post (columns) is 22" x 22". This will add beauty to the facade of the gate later on when it is finished in artificial stones or tiles.
|
Staging of the entrance gate, we have two gates planned for the 2 plots of land. Both gates will grant access to each plot once the center demarcation wall has been erected but that's much later.
|
More pictures of the columns casting stage.
|
Casting of the columns between the runs of block setting took place once we were done with the block work.
|
Block setting now at 9-12 coaches all round the 2 plot perimeter.
|
yak:Thank you. Yes you are free to ask any question. |
More pictures of block setting work, 5 coaches plus achieved all around already.
|
Block setting work in progress, we used 6" blocks all through with columns at intervals. The client earmarked 9 coaches all round with 2 entrance gates but due to the sloppy nature of the site, some places will have more than 9 coaches.
|
More pictures of the blinding work.
|
Foundation footing blinding for the perimeter wall ongoing.
|
More foundation trench excavation work pictures.
|
Excavation work for the foundation footing trench started on the 11th of July and concluded on the 13th of July due to intermittent rainfall.
|
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers. We currently have a brief for a client to construct 4 units of 2 bedrooms flats on a plot of land in Mowo-Nla, Ikorodu. This is a virgin land with two plots side by side and it is a fairly flat terrain. We will be constructing on just a plot for now but we will be building a perimeter wall to secure both lands. We will share the floor plan, elevations and 3D views once we have finalized on the design and permission has been given by the client. Size of land - 1296 sqm Total area of building - Estimated budget for construction - currently unknown PROJECT timeline - 12 months We are currently constructing the perimeter wall and since its still part of the project, we will showcase and highlight the construction process here in the interim, until we start the main dwelling unit construction.
|