Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:46pm On Dec 13, 2016 |
Lintel formwork removed and left to cure a bit before block setting for the decking level starts.
|
Properties › Re: DIY: Construction Of Semi-detached Duplexes At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:35pm On Dec 12, 2016 |
Carpentry formwork of the perimeter wall raft.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:29pm On Dec 12, 2016 |
Lintel casting done, waiting for it to cure a bit.
|
Properties › Re: DIY: Construction Of Semi-detached Duplexes At Harmony Villa [isheri OPIC] by BITSWORKS(op): 8:37am On Dec 10, 2016*. Modified: 9:01pm On Dec 10, 2016 |
Excavation and blinding of the perimeter wall raft.
|
Properties › Re: DIY: Construction Of Semi-detached Duplexes At Harmony Villa [isheri OPIC] by BITSWORKS(op): 3:49pm On Dec 09, 2016*. Modified: 4:09pm On Dec 09, 2016 |
We had to hire a payloader to assist in spreading the backfilling.
|
Properties › DIY: Construction Of Semi-detached Duplexes At Harmony Villa [isheri OPIC] by BITSWORKS(op): 9:59am On Dec 09, 2016*. Modified: 1:28pm On Dec 09, 2016 |
BITSWORKS Nigeria is a multi-discipline construction company comprising of architects, builders, civil engineers and interior designers.
We currently have a brief for a client to construct 4 units of semi-detached duplexes (terraces) on a plot of land in Harmony Villa estate, Isheri by OPIC. The Site is a virgin land, extremely water-logged and we are presently filling it.
We are still at the design stage of the building and we will share the floor plan, elevations and 3D views once we have finalized on the design and permission has been given by the client.
Size of land - 640 sqm Total area of building - design stage Total unbuilt area - 0.00 sqm Percentage of site covered. - 0.00% Percentage unbuilt - 0.00%
Estimated budget for construction - currently unknown PROJECT timeline - 10 months
We are presently constructing the perimeter wall and since its still part of the project, we will showcase and highlight the construction process here in the interim, until we start the main building construction.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 8:20am On Dec 09, 2016 |
Overhead view of the block setting and columns/lintel works.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 8:18am On Dec 09, 2016 |
Brainyman077: Hello can you send me the estimate for the foundation please. You're really doing a good job. The fence and the foundation you did was solid I must confess. Thanks for the good words. Kindly send me a mail. Regards. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 6:47pm On Dec 08, 2016*. Modified: 6:41am On Dec 09, 2016 |
Casting of the columns in progress.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 9:56am On Dec 08, 2016*. Modified: 2:14pm On Dec 08, 2016 |
Lintels formwork ongoing.
|
Nairaland General › Re: Help Advise On This Building Plan by BITSWORKS: 1:00am On Dec 08, 2016 |
bereiweris: all views no comment wetin i do una? Hello, kindly send me a mail. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:24am On Dec 08, 2016 |
pinky2016: Nice job. Please can you give an estimate for the raft foundation and what is the size of this plot? Thank you for the compliment, mail sent. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:14am On Dec 08, 2016 |
Reinforcement and formwork ongoing for the columns.
|
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 8:32am On Dec 06, 2016*. Modified: 12:41pm On Dec 06, 2016 |
Lintel level achieved, about to start the formwork for carpentry and reinforcement.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 3:05pm On Dec 04, 2016*. Modified: 3:21pm On Dec 04, 2016 |
5 coaches and we are almost at lintel level, hopefully we should be able to start lintel formwork by Wednesday.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 7:33am On Dec 04, 2016 |
Laying out of the floor plan on the german floor, this will give us a feel of the spatial flow and floor area.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 5:13pm On Dec 03, 2016 |
kopell: I salute you and the owner good job, no bi small money den enter ground there Oooo. Thank you sir for the compliment, it's better done right the first time when it comes to building. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 5:12pm On Dec 03, 2016 |
mufutau55: Oga mi, I love the thickness of that slab. Good work sir.
Hajji M. Thank you for your kind words always. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 10:48am On Dec 02, 2016 |
German floor all done and curing. We will do the plan layout today and start the block setting also.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 4:12pm On Nov 30, 2016 |
We are at 65% completion on the german floor.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 3:31pm On Nov 30, 2016*. Modified: 3:57pm On Nov 30, 2016 |
More pictures of german floor casting.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 3:00pm On Nov 30, 2016*. Modified: 3:16pm On Nov 30, 2016 |
Casting of the german floor in progress, we started at about 8:30am and hopefully we should be done by 4pm.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:30pm On Nov 29, 2016 |
Carpentry formwork for the german floor edge ongoing.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 9:12am On Nov 29, 2016 |
We used a leveling instrument (dumping level) to take off levels on different locations on the backfilling so we can have an even leveled surface for the German floor.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:38pm On Nov 28, 2016 |
adewaleID: well done, nice and solid,  Thank you for the compliment sir. |
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:38pm On Nov 28, 2016 |
Reinforcement floor mat for the german floor almost completed.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 12:17pm On Nov 26, 2016 |
Iron reinforcement work has started and we will be using 10mm and 12mm rebars for the german floor mat.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 7:08am On Nov 26, 2016 |
Laying of the damp proof membrane ongoing.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 5:54am On Nov 25, 2016 |
Compacting of the backfilled foundation ongoing.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 2:32pm On Nov 23, 2016 |
Backfilling of raft is still ongoing.
|
Properties › Re: DIY: Construction Of Residential Units At Harmony Villa [isheri OPIC] by BITSWORKS(op): 11:15am On Nov 21, 2016 |
We are at 60% done with backfilling, 5 trips down and still counting.
|