Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 6:49pm On Nov 17, 2021 |
Ehimzy: Please what does carcass mean? .. The Word Carcass as used in my context and as far as this discussion is concerned is. Building from foundation roofing. It covers the following... - Foundation - Ground Floor - Decking - First Floor - Concrete Facial - Roofing. - MEP piping as well. This is where my Carcass stops. Anything outside this I regard as finishing stage in my dictionary... |
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 7:04am On Nov 16, 2021 |
mufutau55: Transparency as usual. Good work, Oga mi Sir.
Hajji M. Very Important because we keep record and track of all our projects. Which in turn helps in projection of future projects and developments. Reason why when we do a quote. It's gonna be realistic enough as a projection. |
Properties › Re: New 4 Flats Construction -Ile Ife Osun State by Dennis3D(op): 9:16pm On Nov 15, 2021 |
We are resuming here to do parapet soon. |
Properties › Re: 10 Rest Room School Reconstruction Project - Sponsored by Rotary Club of Ojodu by Dennis3D(op): 9:16pm On Nov 15, 2021 |
Good evening |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 9:14pm On Nov 15, 2021 |
We are simultaneously screeding both the ceiling pop and the walls... The picture below is showing after the ceiling is screeded.
Mind you, we haven't painted yet. Wall screeding to follow soon, after we are done with the entire ceilings of the first floor...
|
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 9:12pm On Nov 15, 2021 |
More work updates to come tomorrow |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 3:02pm On Nov 15, 2021 |
Good afternoon all.
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:00pm On Nov 15, 2021 |
Work updates from here. POP Works.
|
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 2:58pm On Nov 15, 2021 |
presido997: How much is budgeted for the total work? Carcass is estimated to cost 14m. So far we have spent 5.5m |
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 7:54pm On Nov 14, 2021 |
Keep following up with us here too |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:27pm On Nov 14, 2021 |
Good evening all. Keep following up with us for more updates |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 12:44pm On Nov 14, 2021 |
Good afternoon people. We are leveling now
|
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 12:39pm On Nov 14, 2021 |
We have resumed leveling of the building
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:37pm On Nov 12, 2021 |
We are glad to welcome you back here. We are now set to do the POP.
Materials have been procured today. The cement we are using is called ABS
|
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 3:35pm On Nov 12, 2021 |
Resuming soon |
Properties › Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(op): 3:35pm On Nov 12, 2021 |
Good afternoon followers |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 12:28pm On Nov 12, 2021 |
More work update from the pent floor
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 8:34pm On Nov 10, 2021 |
n3xt: Nice one.
I’m looking for something like the below. Do you have?? Good evening bros. Currently don't Have this on my portfolio. Its usually a special request. Not a regular build or Design. |
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 7:36pm On Nov 10, 2021 |
Good evening all. Stay tuned still. We will be back shortly. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:32pm On Nov 10, 2021*. Modified: 2:07pm On Nov 11, 2021 |
|
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:27pm On Nov 10, 2021 |
Watch this and tell us what you think so far of what we are doing here.
Would be posting designs vs Construction. Pent House
|
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 5:15pm On Nov 08, 2021 |
Still on the pent house...
|
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 5:13pm On Nov 08, 2021 |
Good evening all. We are on a short break. We are resuming soonest. |
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 9:51pm On Nov 05, 2021 |
Some of the Works on lintel and Colums.
|
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 9:50pm On Nov 05, 2021 |
jazzykhm: Pls can u tell us d total cost to dese level So far we have spent 5.1m Total Blocks so far = 2,900 Blocks at 280 Per 1, from Foundation We bought reinforcements 1 Ton each of 16mm 12mm and 10mm at 415K pet ton, 4 roles of binding wire - 130 pieces of 1x12x12 Planks - 2 Bags of Nail - 3 Trips of Granite - 5 Trips of Sharp Sand - 8 Trips of Filling Sand and 230 Bags of Cement so far. |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 3:11am On Nov 05, 2021 |
Our pent House work is progressing.
|
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 3:10am On Nov 05, 2021 |
We are already doing pillars and Lintel works... So far we have used 1,700 blocks to get this level from the site concrete to the lintel level.
|
Properties › Re: 10 Rest Room School Reconstruction Project - Sponsored by Rotary Club of Ojodu by Dennis3D(op): 11:26am On Nov 03, 2021 |
We did it |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 11:25am On Nov 03, 2021 |
We are at Lintel level already. Work updates to commence on it tomorrow. |
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 11:22am On Nov 03, 2021 |
As promised. Here are some of the picture updates from the site. View from the front.
|
Properties › Re: Modern Architectural Building Designs For 2022 by Dennis3D(op): 2:45am On Nov 03, 2021 |
We Design and Build |
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 2:41am On Nov 03, 2021 |
More updates from the block works
|