Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 5:46am On Nov 23, 2021
More site updates coming through
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:08pm On Nov 22, 2021
Work update from this site.
We are now doing the Master's bedroom ceiling

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 6:19pm On Nov 22, 2021
See how the finished casting looked like...

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 5:06pm On Nov 21, 2021
PrimeQuay:
Wow this is a really big job.

How much did you pay the casting crew? I’m looking for a “caster man” for an up coming job
Second decking was 390K the Caster man charged for this purpose.
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 12:32pm On Nov 21, 2021
Work update from the pent floor shade
This is reason why I love my team.
This is my carpenter assisting the electrician with their light point works.

This is one of my most hardworking and team player...

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op):
PrimeQuay:
Nice work. More grease to your elbow.

I’m very interested in the casting aspect(cost) of this slab. Do you mind sharing cost breakdown of the labor? And where you able to finish before dark (6/7pm)

Thanks
For the Second Decking...

We used 295 bags of Cement.
2.5 tons of 16mm
3.5 tons of 12mm
1 Ton of 10mm
4 roles of binding wire
2.5 Trips of granite of 30 Tons each.
2.5 Trips of Sharp Sand or 30 Tons each.
Marine board 80 Pieces
1x12x12 - 150 pieces
4 Bags of Nail.
And so on.
Bamboo lengths 380 Pieces

We casted 90% of work on the casting day and finished the remaining 10% of the next day.
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 6:26pm On Nov 20, 2021
FYI

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:23pm On Nov 20, 2021
uncleteeh:
Hmmm. Lovely.
You are well detailed with the construction.
Thanks sir.
We are hoping to do much more than we are doing in the nearest future.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:22pm On Nov 20, 2021
EgunMogaji2:
Nice one.
Thanks sir.
Well appreciated
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:28am On Nov 20, 2021
n3xt:
Massive!! Well done bro.
Thanks very much brother.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:20am On Nov 20, 2021
If you missed out on this construction and conversation.
Then follow this link to catch up with us.
It's an active work


https://www.nairaland.com/6656410/semi-detached-6-bedroom-duplex

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:20am On Nov 20, 2021
...
Properties › Re: Build This 4 Bedroom Duplex To Carcass in 2 MONTHS by Dennis3D(op): 5:14am On Nov 20, 2021
Good morning
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 5:14am On Nov 20, 2021
Resuming here soon
Properties › Re: New 4 Flats Construction -Ile Ife Osun State by Dennis3D(op): 5:13am On Nov 20, 2021
Good morning Viewers
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 5:10am On Nov 20, 2021
The family lounge ceiling is taking shape already

Picture 1 - Before
Picture 2 - During
Picture 3 - Almost
Picture 4 - Done

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 3:28am On Nov 20, 2021
Good morning Viewers, we are going to be doing alot of concrete work on this site today. Nov starting from the front shade of the pent house.

I will show that in 3D and in construction now.

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:26am On Nov 20, 2021
Demaxl:
Ok I understand. Please keep up the good work I enjoy seeing your updates
Thanks very much Sir.
Am delighted when I get positive comments like this. It's alot of encouragement and morale boost for my team and I and we don't take it for granted.

Thank you very much Sir.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:41pm On Nov 19, 2021
Demaxl:
Good day Sir. You and your team have really been working hard on this project, I really commend you.
So how much has been used so far in the construction of the house?
We should be around 23m now or so.

That's because we did the main construction when things were not so high as of today o. To this same structure this way now up to this stage will cost more than this...
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 10:24am On Nov 19, 2021
FYI

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:00am On Nov 19, 2021
Good morning Viewers.
More work updates coming through.

We are glad to equally announce to you that this thread clocks 20,000 + page views Today.

Thank you all who have found time to stop by here, comment and share our views and work. We appreciate.

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 7:39pm On Nov 18, 2021
ibawon:
In Sha Allah, you seff go build for me too
Feel free to contact us anytime sir.
We would be pleased to work with you.

Thank you once again for stopping keep.
You can always follow up with us to get more updates.

We have other projects going on in some other threads on our profile. All are active.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:43pm On Nov 18, 2021
More updates from here.
Bedroom 2 Upstairs.
Ceiling and Wall screeding update.

Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op):
ibawon:
Well done boss, following up Wella.
This full carcass estimate is how much can you also help in securing Lands also.
Thanks alot
Thanks for your time on our thread sir.
For this Carcass. It's costing 45m estimated.
We are in 40.5m already so far...

Secondly, we are mainly into design and construction, however, we can only recommend you to properly agents whom a few of our clients have bought from before, you contact them directly.

In other words, we don't secure land (purchasing) land for clients.

Thanks.

I hope my explanation helps.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:27am On Nov 18, 2021
We are starting the family lounge today.

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:30pm On Nov 17, 2021
walexProjects:
Wow good job in picking a very good team @Dennis 3D.
You and your team are doing a fantastic job.
Kudos sir
Thanks very much.
Am grateful for you finding time on our thread.
Properties › Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(op): 7:10pm On Nov 17, 2021
We should be starting the decking of this piece month end.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:07pm On Nov 17, 2021
And finally I was able to make it down here from Lagos today to check up on my team here. And am really pleased with everything they are doing here. This is one of the many reason why I always stick with my team because communication which is a major factor in building and project delivery is key.

Below are some life pictures from site today. Nov 17th 2021. Note the first picture is just the building plastered. Not screeded yet. The neatness in the job can be likened to the time it took the workers to carefully deliver this piece.

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:05pm On Nov 17, 2021
mufutau55:
I just had to commend you. You are a real working man. Keep doing all your best.

Hajji M.
Thanks very much Sir.
We will keep doing our best.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:00pm On Nov 17, 2021
n3xt:
Bogije, Lagos: 120k for drilling with pump, installation and profit grin

It’s also called Borehole.

_____

I did a couple of borehole around Ibeju Lekki - Eleko axis between 120 - 140k this year while I drilled a borehole in 2013 with 500k and we got no water huh
I did shallow borehole in Lekki for less that amount sef. So different terrain for different reasons for the varying cost.

Always refer to geological survey, if you doubt the competency of your borehole driller.

In the case of Enugu. The geological survey has it at 200 - 210meters that we will see water.

And guess what, we saw water at exactly 200m.

The whole details is on the thread.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:57pm On Nov 17, 2021
dongc:
https://www.nairaland.com/6518103/country-home-design-construction-swimming/1#101391231

This thread on dennis3d. his client spent 2.4m for borehole at enugu....enugu is Very tough place to get water....same for some places in Anambra like my town..

My village house anambra spent almost 1,6m to get water.....very tough terrain ...aba 210, anambra 1,6....if you don't trust people on ground or have an idea...one would think something is off..lol
This is a fact. We dug 650fit. That's over 200 meters. Pls let them visit the thread because seeing is believing.
Properties › Re: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 6:50pm On Nov 17, 2021
The roof Gutter construction and pent terrace shades are ongoing. This is over 40fit above the ground. Kudos to my team for their efforts.