kopell:Yes. In the estate. It's central water, sewage and light. |
Let me show you another picture of more structures in this estate. So you can anticipate what we are up against... ![]()
|
Good morning Viewers |
Work is still ongoing here |
Hum2020:I think I get what you are trying to say. The cantilever you mean in this context is balcony/terrace cantilever that is well exposed usually at the upper floor family lounge, masters terrace etc. Those ones ought to have drainage points if the roof is not shielding them to be able to drain off water droplets that may be found there when it rains. However, cantilever is an integral part of the structure of the building which is highly reinforced to avoid wear and tear or bending moments in the future. Thats the reason why much attention is given to cantilever areas and careful consideration of future loads and all have to be considered before the concrete pour is done. This is my little opinion about it. |
Hum2020:Thanks sir for your in input here. However, cantilevers don't really require maintenance because it's part of the building structure. However, cantilevers are used in different places and purposes in a building. If you don't mind. I would like you to tell me and other followers here what your maintenance concerns are so that we can discus and broaden our scope. We learn daily by sharing ideas. Thanks in anticipation |
mufutau55:Yes sir. They have really huge cantilevers around this estate like I haven't seen in recent times for residential Duplex. Quite frankly, they are really interesting. The detailing on reinforcement is key to achieve this. Spanning 9 - 10fit on some cases suspended. |
Meanwhile, our POP Works here are still ongoing... First Floor lobby Ceiling works
|
Some magnificent photos of properties here so it will give you a taste of what we are about doing here.
|
And we commenced excavation, what we are doing is shallow. Just removing the top soil because it's well compacted and have been idle for a while now. 400mm is ideal in this instance... 100mm is gonna be for Blinding... We would prepare for Blinding soon for our reinforcement of the ground beam works to commence.
|
twinskenny:Noted. |
WishfulProtege:Ok. You can send me a message on Whatsapp on 07038166370 . Once I have a QS work. I can refer you or contact you directly if it's my direct work. |
Find attached some more pictures of houses in this estate. Some are finished and some are still under construction.
|
Still about what we do... |
Pick and we deliver |
FYI |
IjebuWarrior:Roofing sheet and accessories was 2.1m for 450sqm. Wood work was about 800K. Coz the roofing height was about 20fit |
IjebuWarrior:15m when we did it last year. But I can tell you categorically that this amount can't do what we did last year anymore. That includes fence, security and Gen House and main building. |
Setting out commenced today. We are setting out the grids. To enable us excavate the top soil.
|
PrimeQuay:Yes I believe. But most of the structures I see here are fully Detached duplexes for now. Would share a few of them as we proceed. |
See how far we have come with leveling...
|
We are still keep track with other projects |
Calabar POP work is ongoing still. Below is the front terrace ceiling works.
|
WishfulProtege:Which course actually ![]() |
Mykel51:Thanks sir. Kindly follow thread for details. |
kopell: thank you sir for always coming through.I know Oga Hajj will soon come with his seat soon. In this estate they don't allow anything like semi Detached houses. It must be fully Detached or nothing. With time, I will be sharing some houses being built here. They are really massive.Starting with the one am sharing below...
|
ibawon:Yeah. You are absolutely right. He is the same developer we did the semi Detached 6 Bedroom at Osapa there. Here in this estate. Burns Boy's house is here. Manchester United Igalo house is just a plot away from this one am working on. |
Currently, redesigning the site plan and adjusting the building a bit with some modifications on ground as client demands... A Few things to note. We are changing the entrance position of the building from right to left because of the existing drive away. Then we are mirroring the building to face the new entrance and adjusting some other thing which I will highlight in the course of this thread. So kindly follow up with us as we take you up on this journey. It should be an interesting one at that. Put on your seat belt. Get your pen and paper. And enjoy the ride. Your questions. Comments. Are all welcomed.
|
Good morning Dear Nairaland Followers. We are pleased to announce to you the new project we are embarking upon for a developer We urge you to follow us up on this journey. Project Title: 6 Bedroom Duplex Fully Detached with swimming pool, full automation and many more. FEATURES. Ground Floor: - Ante Room - Large Sitting room - Gym - Laundry - Visitors toilet - Dinning - Bar - Kitchen - Store - Guest bedroom ensuite - Maiden Room Ensuite - BQ Ensuite First Floor - 2 Bedrooms For the ensuite with walk in closets. - Family Lounge - Another Guest Toilet - Cinema Room - Front Terrace and side terraces from family lounge. Pent Floor - Madam's Bedroom ensuite with walk in closet - Master's bedroom ensuite with walk in closets and terraces. - Large sit out or lounge terrace at the front. Large enough to accommodate 20 persons at once comfortably. OTHER FEATURES - CCTV - Automated Gates - Swimming Pool. Project Location: Lekki Pls feel free to comment on our project posts. Thank you
|
FYI
|
Good morning. We have bought a total of 150Kg of Filax or Sponge at 2000 per kg, and 100 Bags of pop cement at 6000 per bag with 15 Buckets of paints, 3 top bond Buckets of 10kg each at 17K and other items as well like boards, glass, scaffolding items, nails, oil, etc This was just for a start, we are hoping to make more purchases. |
1 2 3 4 5 6 7 8 ... 107 108 109 110 111 112 113 114 115 (of 269 pages)


They are really massive.