POP Works ongoing now
|
Day 3 - July 1st. We did the block work forming by 95% Also the carpenter boarded the pillars in the 20% block work formed yesterday. Brick layers used here = 4 Labour used here = 8 to achieve this speed of works coz the nature of the blocks here is entirely different from the Hollow blocks you know. This ones are 100 heavier than the regular 9 inches known in Lagos. This is half Hollow and half solid as shown in the pictures below
|
Work updates from today. We did the pillar base concrete works and commenced block forming on day 2. We formed blocks at 20% on this same day.
|
We Design and Build |
We Design and Build |
We Design and Build |
megacontrol:Not an overkill per say but saves space makes it functional at the same time. Would share a plan I did that solved that purpose soon. Reason for that is this. One bedroom flat is not meant to have so much people in it by virtue of design and space management. So it is assumed that under normal circumstances, the Occupant can as well us one convinence area by way of design and positioning. I quite understand why you feel there is need for it because of our culture of housing so much people in building basically. Just the way we Design and make car parking provisions for a specified number of cars for example. I don't know if you still understand what I mean. However if you don't, I will still find time to share one I did. See the building below. It has owbee occupied 4 Bedroom Duplex, one executive mini flat and a rentable 2 bedroom Duplex. All full options. The mini flat there has the description I have suggested herein. The yellow wall you see in the middle below is the mini flat.
|
Jumyg:Thanks for following through |
More updates coming up today |
mufutau55:Thumbs |
We can design and build for you |
We Design and Build |
More picture updates. Foundation depth - 3fit Welder Works and Blinding all done same day. Details below...
|
Day 1 - Officially We are on the move already... Setting out completed in a day with Digging and Blinding of the foundation. Welder works also 95% ready with columns and base.
|
Site Updates on setting out
|
We love what we do. So stay tuned with us |
For the love of what we do |
Stay tuned and follow us up |
Well done bro. |
We commences setting out today as scheduled. We just move this way in any site we go on. The colors are brilliant. After reviewing with the team. We started what we do best. We would have dug today but we decided to rest a bit and resume fully tomorrow. Some cultural stuff exists here about digging foundation for an indigine. Interestingly, I have once experienced that in Uratta in Imo State 2018 when I went with my team too for a project. In all, it's all good and promises to be fun while work is still been done as it should.
|
Stay tuned for more information about our works on all our threads... See our latest project thread. June start up date is June 2020 https://www.nairaland.com/5955403/new-4-bedroom-duplex-construction |
Stay tuned for more information about our works on all our threads... See our latest project thread. June start up date is June 2020 https://www.nairaland.com/5955403/new-4-bedroom-duplex-construction |
Stay tuned for more information about our works on all our threads... See our latest project thread. June start up date is June 2020 https://www.nairaland.com/5955403/new-4-bedroom-duplex-construction |
Our works speaks for itself |
More views of this is coming up shortly. See the dinning.
|
Borehole tap linked to site. Also attached is a screen shot of the construction document.
|