Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:48pm On Jul 03, 2020 |
omanzo02: 1x12x12 is ₦2200 when I bought in May this year. Hardwood or soft? |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:45pm On Jul 03, 2020 |
More work updates on today coming. We have done filling now at Day 5
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:42pm On Jul 03, 2020 |
See the beam as the formwork is removed.
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:40pm On Jul 03, 2020 |
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:39pm On Jul 03, 2020 |
diordaves: Nice job.
Please throw more light on the choice of the foundation design. What's the soil condition like? Why the structural introduction of a ground beam? Given your knowledge of the soil condition, do you think there are alternative cost effective foundation designs without the ground beam?
The blocks are really unique. Very effective and practical for hollow blocks.
Well done. Thank you for your questions. The introduction of ground beam was as a result of historical background of the place. However, once it's ascertained that the land is good enough without ground movement and fast settlement, you may not need ground beam. Example of this was a two story we did in Uratta Owerri. There was no need for ground beam then because the soil was strong. The foundation still remains pad and strip. The only new thing is the beam. |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:31pm On Jul 03, 2020 |
... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:01pm On Jul 03, 2020 |
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 12:56pm On Jul 03, 2020 |
... Work update still on day 4
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:59am On Jul 03, 2020 |
alstacs: Baba, if another person had written what I wrote I would have said it is a lie. He was so unreasonable. He kept on speaking English about how he is a professional and how he worked for one of my neighbours on he street etc. Na so I leave am with my wife make dem de speak their English oh. As dem talk finish , no need to argue further. I just thanked him and told him we will get back to him.  That line sha "I will get back to you". Better say sorry I can't deal with this than to leave the person that way with that statement. It helps the person move on and maybe decide on how best to deal with clients subsequently. It's an honorable thing to dismiss a vendor, artisan or worker or even a contractor in a simple fashion than suspending or keeping the person hanging with that statement. If need be you don't say it in front of him. Leave them a text or whatsapp message thereafter. In my opinion, it's the best way to treat people. Positively or negatively in brings about a defining closure of a discussion. Thank you for your time. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:53am On Jul 03, 2020 |
JWTheocracy1: This is what he sent to me this evening... are all these the actual prices of materials in the east (Aba, Abia state to be precise). I will appreciate to be guided by the wonderful people of this forum. Note this is for remodeling of a storey building. If need may be, I can still upload the existing building here, so as to be guided properly. Some things here seem to be high as per unit prices. However, I can only say the prices of things I bought then with time. So you can do your plus or minus yourself to get an average. Firstly, what do you need the 20mm for? Secondly, use this price range coz that's what we bought then for the two story building we did then. - 9 inches block - 145 - 155 Naira for one - 6 inches block - 120 - 135 Naira for one. - a trip of Sand - 16 - 19K then - 1x12x12 - 1200 Naira then - Bag of nail - 8,000 - Cement then a bag was - 2500 - 30 Tons Granite - 230 - 250K then depending on your supplier and distance to your site. This is just to mention a few. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:47am On Jul 03, 2020 |
JWTheocracy1: Thank you for that detailed explanation. I don't base at home and this is my first project. With all these years of hardwork I won't like to pay more than the actual cost of materials. You are welcome. Good luck in your project. |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 5:40am On Jul 03, 2020 |
Day 4. Back filling and construction of ground beam. Block works took about 900 pieces Height of 850 from the back then 1m in front to achieve the level.
|
Properties › Re: Build & Sale 4 Bedroom Duplex - Lekki Investment Style by Dennis3D(op): 2:04am On Jul 03, 2020 |
... |
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 2:04am On Jul 03, 2020 |
..... |
Properties › Re: Semi Detached 4 Bedroom Duplex Design & Concepts by Dennis3D(op): 2:03am On Jul 03, 2020 |
... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:01am On Jul 03, 2020 |
JWTheocracy1: Ok thanks. How many tipper trips will make up 30 tons? Any idea? Approximately 3.5 - 4Trips |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:59am On Jul 03, 2020 |
Hum2020: Op if your Engineer gave you a quoation on grantie 30 ton at 250k will advise you to pay him because I brought mind 25ton at220k in imo state I discovered that the price of building materials is very expensive down in the east than any other place in nigerian .. True. Granite costs in East is very expensive compared to Lagos. I remember working in Owerri 2018. 30 tons was for 240K then at Uratta Imo State. Note, the distance plays a role too. So if I want to put a range I would say 200 - 250K. Though they have some other things cheaper too like Blocks there are cheaper than those in Lagos and a few more materials. Their plumbing pipes is shorter than that of PH and Lagos too. In fact east has their own advantages and disadvantages when it comes to materials and workforce |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:52am On Jul 03, 2020 |
.... |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:40pm On Jul 02, 2020 |
Ratun: Your 3D is not showing the swimming pool. See it here I believe with time I will update the 3D with my recent software to improve some things
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 12:23pm On Jul 02, 2020 |
... July 2nd 2020 Updates We have started back filling and preparing ground beam concrete work and reinforcement
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Dennis3D(m): 10:58am On Jul 02, 2020 |
Badgers14: Ok.. thanks.
I was praying it wasn't 50 x100.. 
Man, I have seen people almost squeeze a whole neighborhood in a 50 x 100..
their excuse is, oh that's a rental property. Me: and so ?
That's just appalling. I have done something that can surprise someone on 50/100fit before. About 5 flats or so |
Properties › Re: 8 Bedroom Duplex Construction - Lakowe Golf � by Dennis3D(op): 10:55am On Jul 02, 2020 |
... |
Properties › Re: New 5 Bedroom Duplex With BQ by Dennis3D(op): 10:55am On Jul 02, 2020 |
... |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 10:55am On Jul 02, 2020 |
Keep following |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:43am On Jul 02, 2020 |
Day 3. Colum to Decking is getting set
|
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:46am On Jul 02, 2020 |
mufutau55: Very nice work you are doing here, Boss. No time wasted at all. Keep up the good work.
Hajji M. Thank you sir. Well appreciated. Keep following |
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:17am On Jul 02, 2020 |
Stay tuned for Day 3 Updates. The columns for the ground floor to Decking is almost ready at this point in just day 3. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:10am On Jul 02, 2020 |
Salliet: I have taken contributions from my esteemed Engineering personel here and modified the layout.
Hints: 1. Put both toilets together for piping/evacuation ease. 2. Maintain the balcony for cloth hanger or inverter batteries or AC outdoor unit etc.
3. Position of kitchen to improve cross ventilation.
4. Visitor's toilet door was too close to bedroom door in the previous design.
5. The bedroom windows were previously split into two separate 600mm but now combined to a single 1200mm window.
6. Introduced a little shoot out by the kitchen, to make the 2storey building look a bit stylish than being just flat and bland.
7. Most importantly, with the same perimeter of a given space, the closer the space is to being a square the more the area created. Hence most of the spaces are square in nature.
What I mean is:
Length : breadth: Area : Perimeter
L : B : P : A 7 : 1 : 16 : 07 6 : 2 : 16 : 12 5 : 3 : 16 : 15 4 : 4 : 16 : 16
One drawback is that, there will be a visible tie beam in the kitchen. That could be concealed with pop though.
@coldcandy @ArcToyin @mufutau55 @uncleteeh @seglad2 @Takoro13 @One4me @Dennis3D @EgunMogaji2 @rotecch77 @Saydfact
Kindly look into Hello, Pls find my screenshot below and let me discus a few things. Firstly, the window in the living room can be expanded to 1.2m minimum at least by 1.2m that's 4fit x 4fit. As indicated by the yellow line below. I can see two different entrance door. One from the staircase area and one leading to the living room. Now where I need more clarifications is the window on the same wall with living room what's it for if the double swing door coming from the staircase area is there. Unless that place is an open terrace, that window wouldn't work. Look at the wall of the bedroom and the proposed kitchen. Kindly make it entirely straight to the bedroom. That recess is not ideal. If you want an ideal recess that can give you a good shape. Look at from 450mm to 900mm recess. That 225mm is not ideal. Rather in building setting out and foundation stage, an inexperienced person can miss it. If I find anything else I might need to highlight. I will do so. Remember, this is my opinion and suggestions from the little I know. Thanks and good luck
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 12:58am On Jul 02, 2020*. Modified: 3:13am On Jul 02, 2020 |
mufutau55: That is exactly what I was saying. Look at how the Toilet is positioned to be used by Guest and the Occupant. And still the people sitying in the Livingroom does not see the Toilet. Good plan.
And YES, if that is how the owner wants it, you have no choice o. Agreed.
Hajji M Will post the one I did too this morning. Let me fish it out from my archive. Rotecch77 is in order. Unless a client insist, then this option is the best. See attached below the mini flat floor plan of this project here.
|
Properties › Re: Build This Executive 4 Bedroom Bungalow With 10m Naira (Foundation - Finishing) by Dennis3D(op): 12:53am On Jul 02, 2020 |
You can contact us for building design and construction services on 07038166370, 08081465833 Dennis3Ddesigns@gmail.com. We Plan We Design We Build We Renovate We Landscape We Supervise We Consult
We offer: Architectural Design Structural Design Electrical Design Mechanical Design Plumbing Designs Project Management Bill Of Quantities (BOQ) |
Properties › Re: 100% 2019 Renovation Standard For A 25yr Old Village House Project by Dennis3D(op): 12:52am On Jul 02, 2020 |
See this |
Properties › Re: Executive Master's Bedroom Interior Design With Walk In Closet (AMAZING PHOTOS) by Dennis3D(op): 12:52am On Jul 02, 2020 |
See this |