fash78:Guys any thoughts on these? I am actually planning to buy some bags of this powdery paints and bring them to naija for a trial but if it is available in Lagos can somebody let me know? Thanks |
Folks I am in the same boat with Befto with respect to my project. I have made up my mind to combine POP, ceiling screeding with cornices for the ground floor. And also combine POP and PVC for the first floor. However I just got a new idea but I am not sure if anybody have used this is naija before. In my present house my ground floor ceiling was done using what my builder called knockdown paint. It is a powdery paint that is water based. It is normally prayed on smoothly finished ceiling surface. See some of the pictures attached. This is the ground floor ceiling for my present house. Please can I get this in Lagos? Do we have artisans who know how to do this in Lagos?
|
Folks I am in the same boat with Befto with respect to my project. I have made up my mind to combine POP, ceiling screeding with cornices for the ground floor. And also combine POP and PVC for the first floor. However I just got a new idea but I am not sure if anybody have used this is naija before. In my present house my ground floor ceiling was done using what my builder called knockdown paint. It is a powdery paint that is water based. It is normally prayed on smoothly finished ceiling surface. See some of the pictures attached. This is the ground floor ceiling for my present house. Please can I get this in Lagos? Do we have artisans who know how to do this in Lagos?
|
lastpage: |
EgunMogaji:I have similar question guys. I already submitted all my drawings for one floor hostel building. Now I want to maximize returns and would like to make it a two floor building. We are at foundation level and I don't mind reinforcing the foundation to carry an extra floor. Do I need to go back and withdraw all the document submitted for approval or not?? My builder said I don't need to do that because we might not have enough parking space for a 2 floor building and so it won't be approved (but this is purely for students and really most of them won't have cars). The builder said so far we do the right thing and make sure the we reinforce the foundation to carry an extra floor we are good. Guys please kindly advice. |
Hello. Can you please send me your price list to my email address funsolaw@gmail.com |
befto:I don't understand your question bros. Are you asking for how much I am being charged for the AC piping work for my project? |
KolaShangOne:Thanks |
House can anybody provide me with unit cost of these materials? I need to buy them for the AC piping installation South African Copper Pipe (8 rolls) for the main AC piping South African 1/4" Copper Pipe (8 Rolls) Amaflex Tape Original 2.5mm Nigerian Cable (3 Rolls) Installation tape 5 3" PVC pipe (20 lengths) 1" PVC Pipe (25 lengths) PVC Gums (4 Cups) PVC Elbows |
House can anybody provide me with unit cost of these materials? I need to buy them for the AC piping installation South African Copper Pipe (8 rolls) for the main AC piping South African 1/4" Copper Pipe (8 Rolls) Amaflex Tape Original 2.5mm Nigerian Cable (3 Rolls) Installation tape 5 3" PVC pipe (20 lengths) 1" PVC Pipe (25 lengths) PVC Gums (4 Cups) PVC Elbows |
Dominionng:No problem. I will be glad to share the welder's number with you. |
Thanks for sharing. I am using the same person that did the one in Oyo state for me. I didn't bother to look for a comparative qoute as I think the amount the guy is asking for is a fair price. |
mufutau55:That is nice. I used the burglary proof for one of my other project in Oyo State. The posted pix is actually from my other project. The total cost of the burglary is for 63 windows of various sizes posted earlier on in this thread. |
spyder880:Thanks Spyder. I will share this with my site Engineer. |
mufutau55:Yea you are right these are not burglary embedded ones. The burglary proof contractor qoute 750K but I have been able to negotiate to 500K using the rate in my BOQ. The type of the burglary that I will be using is attached below.
|
fash78:The unit cost for each of the door are as follows: 2.5ft China door @18k, 3ft China door @ 21K, 4ft China door @34K, 3ft Turkey door @ 60K, 4ft Turkey door @ 96K. |
Total cost of doors is N1, 346, 000. The total number of doors is 54. This comprises of 22pcs of 2.5ft of China metal doors, 24 pcs of 3ft China metal door, 4 pcs of 4ft China metal door, 2 pcs of 3ft Walnut Turkey Security doors and 2 pcs of 4 ft Walnut Turkey Security door. |
The total cost for plastering negotiated with the Mason is 1.1M. This represents labour cost only. The scope include plastering of the building inside and out, installations of total number of 54 doors, installation of burglary proofs for all the window. |
mavverick:I have posted the prices for the doors several time but each time I have been banned for like 24 hrs. I don't know how else I can post the prices without been banned. |
Just came to my notice that the casement window contractor missed about 6 windows when he came to site for measurement. The windows missed are: 3pcs of 1200mm by 1200mm 1pcs of 1800mm by 1200mm 1pcs of 600 mm by 700mm This put the total number of window for this project at 70pcs. |
More ......
|
More pix of the building
|
Current look of the building with the window installation
|
Total amount for imported casement window complete with net and installation is N1,070,000. Total number of windows = 63pcs Breakdown of cost. 1800mm by 12000 @ N22K (1pc) ----------------------------------------------------22K 1500mm by 1200mm @ 20K (20pcs) --------------------------------------------------400K 1500mm by 900mm @ 15K (2pcs) ------------------------------------------------------30K 1200mm by 700mm @ 12K (2pcs) ------------------------------------------------------24K 600mm by 700mm @ 6.5K (6pcs) ------------------------------------------------------39K 1700mm by 1200mm @ 12K (2pcs) ------------------------------------------------------24K 800mm by 1200mm @ 12K (4pcs) ------------------------------------------------------48K 1200mm by 1730mm double leave with arc @ 19.5K (8pcs) -------------------------156K 1200mm by 1200mm @ 12K (7pcs) ------------------------------------------------------84K 1000mm by 1200mm @ 10K (1pcs) ------------------------------------------------------10K 1200mm by 900mm @ 11K (2pcs) ------------------------------------------------------22K 900mm by 1200mm @ 7K (4pcs) ------------------------------------------------------28K 1000mm by 900mm @ 10K (1pcs) ------------------------------------------------------10K 570mm by 600mm @ 8K (1pcs) -------------------------------------------------------8K 1000mm by 2870mm fixed light @ 50K (2pcs) -------------------------------------100K Total -------------------------------------------------------------------------------------------N1,005,000 Transportation ------------------------------------------------------------------------------N25,000 Installation -----------------------------------------------------------------------------------N40,000 Gross Total -----------------------------------------------------------------------------------N1,070,000 |
[quote author=mufutau55 post=39434178]Please don't forget to showcase the Turkey doors and the china metal doors with their respective prices... many people are interested in this in the other thread. Thanks. Hajji M.[/qutote] OK I will |
![]() arewafederation: |
Total amount for imported casement window complete with net and installation is N1,070,000. Total number of windows = 63pcs Breakdown of cost. 1800mm by 12000 @ N22K (1pc) ----------------------------------------------------22K 1500mm by 1200mm @ 20K (20pcs) --------------------------------------------------400K 1500mm by 900mm @ 15K (2pcs) ------------------------------------------------------30K 1200mm by 700mm @ 12K (2pcs) ------------------------------------------------------24K 600mm by 700mm @ 6.5K (6pcs) ------------------------------------------------------39K 1700mm by 1200mm @ 12K (2pcs) ------------------------------------------------------24K 800mm by 1200mm @ 12K (4pcs) ------------------------------------------------------48K 1200mm by 1730mm double leave with arc @ 19.5K (8pcs) -------------------------156K 1200mm by 1200mm @ 12K (7pcs) ------------------------------------------------------84K 1000mm by 1200mm @ 10K (1pcs) ------------------------------------------------------10K 1200mm by 900mm @ 11K (2pcs) ------------------------------------------------------22K 900mm by 1200mm @ 7K (4pcs) ------------------------------------------------------28K 1000mm by 900mm @ 10K (1pcs) ------------------------------------------------------10K 570mm by 600mm @ 8K (1pcs) -------------------------------------------------------8K 1000mm by 2870mm fixed light @ 50K (2pcs) -------------------------------------100K Total -------------------------------------------------------------------------------------------N1,005,000 Transportation ------------------------------------------------------------------------------N25,000 Installation -----------------------------------------------------------------------------------N40,000 Gross Total -----------------------------------------------------------------------------------N1,070,000 |
Coming up .... plastering work for the whole building, installation of casement window plus burglary proof and also installation of doors (Turkey doors and China metal doors). I will be sharing the total cost of materials and labour with you as soon as possible. Stay tuned. |
spyder880:Thanks Oga Spyder. Thanks for your help every time. |
Send me pictures and your comprehensive list to funsolaw@gmail.com Thanks |
brag3:Brag3 it depends on if you are targeting students around the area as potential tenants. If you are, then I will advice you to go for self contained rooms instead of a three bedroom penthouse. For my property I am not targeting students but if students can afford it why not ![]() |