Pheesayor's Posts
Nairaland Forum › Pheesayor's Profile › Pheesayor's Posts
1 2 3 4 5 6 7 8 ... 16 17 18 19 20 21 22 23 24 (of 86 pages)
thanks to my BB 9790 ![]() IGBOSON1: Nice camera! |
mrmetoo1: LOL!!!!!!!!!!!!!!!!! Yes o!!choi! Loooooooong time. From your earlier post here, seems you live on or around festac right? |
Hello, is this the same mrmeetoo that we used to argue 2face/Faze back then on the music/radio section? mrmetoo1: This FG is a joke!!! Apapa-Oshodi is there, they haven't even completed it. I moved back December and there's a strip they've been working on since then. As far as traffic grid lock there was none worse than than trying to get out of Festac passing by that Fagbems filling station or the NNPC gas station. To get out of Festac, to get to other side of Apapa-Oshodi then took at least 2hrs. This grid-lock was caused by Julius Berger not knowing what road to close and which to leave open. Then, going back into Festac, there was a time they closed the only entrance going into Apple junction and left a little space for cars going out and coming in. You could sit in the traffic for two hours conveniently stretching from "Chosen". I don't get how they're trying to push the grid-lock on LASG when it was the road the FG was working on the caused it. The so called out-cry mentioned in the article was when the rains were heavy and Apapa was a no go area due to the bad roads. Now as far as the Lagos-Badagry road, there's absolutely no traffic caused by the expansion, CCEC works on that road without being a nuisance to anybody. Traffic all the way to Badagry could be bad but its caused by the numerous potholes, the kind of potholes than can swallow a car. I actually thought it was LASG's responsibility to fix that road so I always cursed them whenever I had to drive to Badagry not knowing I'd been cursing the wrong ppl. I really don't want FG/Julius Berger to take over the Lagos-Badagry because of the way they've been handling the Apapa-Oshodi. Now if FG continues to work with CCEC, I might be ok with it because all I care about is development even though I know this is nothing but playing politics. JB is an arrogant company, they work without considering the effect it has on people. People that live in Festac can testify to this. |
ifyalways: Am I surprised? NO .Can you please get pictures and let's make it public? |
Dbestmax: Wat has APC got 2 do wit ds....Accept dat ur post aint real my man....stop actingsee more pictures here http://www.watchinglagos.com/2014/09/abandoned-bridge-project-in-badagry.html |
Dbestmax: Wat has APC got 2 do wit ds....Accept dat ur post aint real my man....stop actingBelieve me the post is real, I took those pictures when I went for a friend's wedding in April and up till now it is still the same. Get someone who lives around there to confirm for you |
Dbestmax: Nice work of Art...Hu ar u deceiving...you brought pics of gathered construction equipments and then pics of an old village lil stylish bridge..How come d catapillar and d pillars arnt in dsame pix wit d bridge... guy go bak 2 ur drawing boardWhat is this one saying? Did you check the project signpost and the pictures properly? Or are you a paid APC defender? |
9. Where the man that collect N20 stays 10. Towards the end of the wooden bridge 11. End of the wooden bridge Source http://watchinglagos..com/2014/09/abandoned-bridge-project-in-badagry.html
|
5. Sighting the wooden bridge from afar, note the bent (and dangerous electric pole) 6. Beginning of the wooden bridge 7. Climbing the bridge 8. Still on the bridge
|
Pictures from below are from Oke-Ogbe Road, Olorunda LCDA, Badagry in Lagos, around Elijah bus stop off Badagry expressway. There's a body of water that makes the use of a bridge compulsory. The project being handled by the Lagos State Ministry of Rural Development has been abandoned. This is calling on the LASG to get the project done as residents have to go through a dangerous wooden bridge (pictures below) to get to their houses and still have to pay 20 naira per day to use the bridge. Pictures are below... 1. The project signpost 2. Machines supposedly to be used for the project 3. Pillars to be used for the project 4. More pillars
|
people like that are used to investigate and get to the root of the matter, the same mistake they made by killing Yusuf Mohammed Emma8043: You been won give am award |
still available? oswardic: This is a system that is personally used by me, it has not issues of any kind apart from the below stated issue. The spec are as follows.. |
It is not ECOWAS but LASG, I've lived in Festac all my life by the way... akymme: Lagos Ibadan Expressway has been completed abi? We keep deceiving ourselves, I grew up in satellite town, that road has been like that since 1977, we all ignored it, the construction is being down by ECOWAS, Lasg is just supervising, FG has a long way to go. When the contract was signed, where FG de that time. |
Worst than Shagari, fortunately there's no one like Buhari/Idiagbon left in the army, corruption has infiltrated them all egift: This is the most corrupt administration in the History of Nigeria |
The FG should allow the LASG finish what they started and face the other numerous federal roads that are in state of disrepair |
femmy2010: Nigerian Government has started again ooO. |
Funds delayed the project but the pace has increased and they should leave LASG alone. When the FG neglected the road, LASG thought about the initiative and now the FG wants to take the glory Never!!! The best they can do is to pump money into the project as the big brother that they are... |
Christ Apostolic Church Festac town Lagos
|
There's darkness already, power here in festac is just 2hours daily and it is at midnight |
PDP's inadequacy since 1999 is the reason Lagos is overpopulated hereby causing more poblems for the state governmeny harrysterol: If APC can't manage just a state how can the manage the whole country? Later the will say PDP is not performing |
Inspirational and touching, to God be the Glory... |
I'm a product of LASU external system and it anything but pleasant, so many irregularities that's why the governor discontinued the program two years ago. Peaceful protest like this is commendable and I'm sure things will speed up. Only three exams have been conducted since 2012 and the fourth one is in progress, this is commendable compared to what we had in our days. Maybe they are protesting school fees in disguise thinking it will work the way it worked for full time students ![]() |
berem: I watched it on AIT some few minutes ago. Is he defecting to PDP soon? We are in the season of political party transfer so anything can happen.Dan Ayanwu and not Nwanyawu |
call jumia and ask them to come and retrieve it, you can return within two weeks of delivery dawoyo: Gurus in d house, I greet u all. I ordered my own Innjoo i1s & received it today. However I discovered that while scrolling up or down, d apps icons kind of overlap. I also discovered that after a while, the screen resolution wasn't clear anymore, it was like the top of d screen was transparent, faint or something. The characters (App names for example) wasn't all that clear & smooth. I called Jumia for a replacement & they promised to come pick it up & check it out if my claims were genuine. |
Talkcentral: h iceberylin: hmm Talkcentral: h Liamm: . Goddex: .See them.... *yimu* |
shebi they said GEJ only has fixed all Federal roads Yeye is oozing.... |
God bless arresa: The person you quoted functions under hate and ignorance hence all his clueless, hateful and ignorant ramblings. |
I'm not justifying corruption, the cost of building is way high especially in a place like Lagos and there is little the state can do about factors only the federal government can control. There's also need for return on investment, it is people like you that jumped on the news of the debt profile of lagos. As for FERMA on Ikorodu road, you're wicked liar because I ply that route (Yaba to Maryland) and it is LPWC (Lagos Publics Works Corporation) I see there carrying out maintenance and not FERMA. Lagos is doing well in most areas and they only need to be encouraged to do better. Check the truth you've been standing by properly and make amends. Cheers. aljharem: I also use to look forward to your post. |
aljharem: Fashola and the APC lead Tinubu government are full of lies and propaganda. Lets itemize the things he claimed to have do with a loan of 160 billion Naira. Also note that Lagos generate 29 billion Naira monthly apart from 12 billion Naira monthly allocation from the Federal GovernmentI used to look forward to your posts until you went underground for a long time and returned as an anti-APC agent. As for the bolded; 1. Fashola has said he didn't get cement cheap so the houses can't be cheap, go to the houses Jakande built and see how they have dilapidated, and that was in the days of "sane" Nigeria. Attempt cheap houses in this era of collapsed buildings and see them collapse in a few weeks. 2. When last did you see FERMA on Ikorodu road? It has been taken over by the LASG since the FG has proved to be unserious, same thing they did for Lagos-Badagry expressway |
not only that, they ordered telecoms company to increase price of calls to at least 12naira per minute brownlord: Those Nigeria Criminals Commision NCC should shut the fvck up, they are the once conniving with the telecoms coy to exploit Nigeria's, why won't they make trillions with their deferent method of defrauding Nigerians. |
it is either you are liar or a kid during OBJ's tenure for you to say he didn't build a single power station, use google and come back here to apologise. Collynzo16: The fact that Obasanjo's son is fighting in the north east doesn't make Obasanjo the best President or even a good one, people get real! |
1 2 3 4 5 6 7 8 ... 16 17 18 19 20 21 22 23 24 (of 86 pages)

Never!!! The best they can do is to pump money into the project as the big brother that they are...