Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,194,203 members, 7,953,752 topics. Date: Friday, 20 September 2024 at 03:30 AM |
Nairaland Forum / Nairaland / General / Properties / The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra (30348 Views)
The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra / The Making Of The "Owerri Royal Manor" / The Making Of The Enugu 6 Bedroom Duplex (2) (3) (4)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (19) (Reply) (Go Down)
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:01pm On Jul 31, 2021 |
Soil compaction, using the mechanical vibration system............ 3 Likes 1 Share
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:03pm On Jul 31, 2021 |
We have completed the concrete cast of unit 1 of the 2 duplexes............. 2 Likes 1 Share
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:07pm On Jul 31, 2021 |
More pictures of the completed DPC........... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by tranxo(m): 11:50pm On Jul 31, 2021 |
spyder880:Chief I wan learn. Soakaway vs Septic tank. What's the difference? |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:55am On Aug 03, 2021 |
tranxo: The septic tank is where the waste water and effluent first arrives from the building, the compartment is plastered and is supposed to be water tight. The waste in this tank goes through bacterial degradation which will reduce its size and toxicity. As the waste gets more liquefied, it is expected to start flowing into the soak away section of the system through a pipe placed in the middle wall. The flow into the soakaway is mostly water, and this water is supposed to soak away into the surrounding soil from weep holes created to leak water away from this tank. This water will either evaporate, or travel downwards as ground water which has been filtered just like all the other dirty water going below the ground. 12 Likes 2 Shares
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 3:55pm On Aug 03, 2021 |
Waiting for more sand to be supplied so we can complete the DPC of the second unit. 2 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:02pm On Aug 05, 2021 |
Ready to start the formation of the walls in this building........... Warming up for the second unit. 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by folmus: 5:24pm On Aug 05, 2021 |
spyder880: Thanks for teaching us lessons 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by folmus: 5:25pm On Aug 05, 2021 |
spyder880: When I see the shoes, I know the boss is around 2 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by Martini101(m): 5:48pm On Aug 05, 2021 |
spyder880: Rain wey spoil another person roof, did wonders on spydders foundation. ��� Thank God for the rain. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:25pm On Aug 05, 2021 |
Martini101: The rain has been a serious blessing, it has been so helpful as it naturally sinks in this foundation soil. We will still pump water into the foundation when some fix our borehole in this site by tomorrow. Welcome bro. 4 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:29pm On Aug 05, 2021 |
Buying and offloading more blocks in this site today........... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by michlins(m): 6:34pm On Aug 05, 2021 |
Moulding of block and waiting for rain to solidify the blocks na for person wey no keep money to build. The pace you work with is something I will need to learn. Moving from state to another to supervise and monitor projects is very stressful like this. Yet you seamlessly do it like clockwork spyder880: 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:41pm On Aug 05, 2021 |
More blocks arriving, then we started to form the walls .......... 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 6:43pm On Aug 05, 2021 |
michlins: My brother, when I look back and see how many of my children striving to enter the university, I can only keep running, because the school fees wont be funny at all 6 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by michlins(m): 7:08pm On Aug 05, 2021 |
spyder880:the pot of oil will never run dry. My race never even start sef 2 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:40pm On Aug 05, 2021 |
Looking at the wall partitions from above.............. 2 Likes 1 Share
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 9:18am On Aug 06, 2021 |
More work ongoing on the soakaway system for these 2 duplexes........... 3 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by BIGGIE121(m): 11:38am On Aug 09, 2021 |
Kuduos to you sir, you're doing a very wonderful job here 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 1:26pm On Aug 09, 2021 |
BIGGIE121: Thank you Sir, more updates from this site tomorrow. 3 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:32am On Aug 10, 2021 |
The wall partitioning on unit 1 of this project is almost completed to the lintel levels. More pictures when I get to site this morning. 2 Likes |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 7:32pm On Aug 12, 2021 |
Pictures from our wall partitioning in this first unit........ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:16pm On Aug 12, 2021 |
More pictures from this site........ 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 8:33pm On Aug 12, 2021 |
Above........ 2 Likes
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by KelvinCoaster(m): 9:57pm On Aug 12, 2021 |
Spyder880, nwannem ya gazieri gi. Chukwunna ga n'edu gi. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 5:18am On Aug 13, 2021 |
KelvinCoaster: Thank you Sir, Chukwu gozikwaa gi na ezi n' ulo gi. 1 Like |
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:24pm On Aug 13, 2021 |
We have continued to work in this building, this is the first unit.......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:29pm On Aug 13, 2021 |
From the front......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:38pm On Aug 13, 2021 |
The walls ........ 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 10:57pm On Aug 13, 2021 |
The soakaway system is getting ready to be cast........... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:42am On Aug 15, 2021 |
Getting supplies of more sand in this site today......... 1 Like
|
Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(m): 11:44am On Aug 15, 2021 |
Soak away system cast with concrete.......... 2 Likes
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (19) (Reply)
How Do I Deal With This Type Of Neighbor / Cost Of Building An Upstairs / Reconstruction Diary Of A 5 Bedroom Bungalow In Ajah (the Face Lift)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 24 |