₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,583 members, 8,422,661 topics. Date: Monday, 08 June 2026 at 03:44 PM

Toggle theme

Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ - Properties (7) - Nairaland

Nairaland ForumNairaland GeneralPropertiesIsheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ (34390 Views)

1 2 3 4 5 6 7 8 9 10 ... 23 Reply (Go Down)

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:41pm On May 10, 2022
A View of the roof work from the interior.

Milano Black - Manufactured in New Zealand

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:53am On May 12, 2022
Good morning Viewers.
We are commencing the Window works of this project this weekend. Stay tuned for more updates
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 5:14pm On May 12, 2022
Welldone.. Following keenly! From a professional point of view.. If building at a slow pace.. Which do u think should come first after roofing.. Conduit piping or windows?

Dennis3D:
Good morning Viewers.
We are commencing the Window works of this project this weekend. Stay tuned for more updates
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:36pm On May 12, 2022
BiigTee:
Welldone.. Following keenly! From a professional point of view.. If building at a slow pace.. Which do u think should come first after roofing.. Conduit piping or windows?
Normally before or immediately after roofing.
The Conduit piping of the ground and upper floor (Duplex) ought to have been done before windows.

However, either of the two stages of work doesn't interfere with each other so they can be done at separate times.

Like this particular project now. We are just about to commence the upper floor piping while the window work is ongoing too.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 6:48pm On May 12, 2022
Stay tuned here and click on follow thread for updates from this project. Window works starts in two days
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:50pm On May 12, 2022
Thank you sir.
Dennis3D:
Normally before or immediately after roofing.
The Conduit piping of the ground and upper floor (Duplex) ought to have been done before windows.

However, either of the two stages of work doesn't interfere with each other so they can be done at separate times.

Like this particular project now. We are just about to commence the upper floor piping while the window work is ongoing too.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by DelCrux: 7:21am On May 13, 2022
Dennis3D:
A View of the roof work from the interior.

Milano Black - Manufactured in New Zealand
This is not the original New Zealand this is china...but good job
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by mufutau55(m): 12:23pm On May 13, 2022
DelCrux:
This is not the original New Zealand this is china...but good job
Please how can we identify this is China made?
Thank you.

Hajji M.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:40am On May 14, 2022
mufutau55:
Please how can we identify this is China made?
Thank you.

Hajji M.
Interesting question. So we too can learn from him.
We are open for more ideas and information.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:42am On May 14, 2022
DelCrux:
This is not the original New Zealand this is china...but good job
Thanks for you input on this.
If there are ways to know the Original new Zealand. You can share with me as well as other readers so we can add that knowledge in.

Thanks once again as I anticipate.

We are all learning every day. So when I get to the factories next time I can be able to say this is what I learnt new
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by kopell: 12:48pm On May 14, 2022
Dennis3D:
Thanks for you input on this.
If there are ways to know the Original new Zealand. You can share with me as well as other readers so we can add that knowledge in.

Thanks once again as I anticipate.

We are all learning every day. So when I get to the factories next time I can be able to say this is what I learnt new
We are all waiting for his proof to learn more, we will keep learning everyday.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:05pm On May 15, 2022
Good afternoon Followers.
The window works on this site commences tomorrow. Monday 16th May 2022
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:10pm On May 17, 2022
As Promised - Attached are the Window frames to commence fabrication ASAP.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 6:37pm On May 17, 2022
Is fabrication on site better than paying for them to make it and deliver them install for u? What's the advantages?
Dennis3D:
As Promised - Attached are the Window frames to commence fabrication ASAP.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op):
BiigTee:
Is fabrication on site better than paying for them to make it and deliver them install for u? What's the advantages?
Good evening sir. Fabrication on site is always better as it gives them the opportunity to always cross check their measurements and ensure no mistake is made and equally reduces the risks of broken glass during transportation in some cases.

It equally gives them opportunity to make and adopt new measurements when changes are made on site during fabrication. I have seen that happen. In fact in this project, we even changed the position and size of a window and removed one too.

So in my opinion, it's preferred to start up window fabrication on site.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:14am On May 18, 2022
Good morning Viewers.

Will be updating the thread on the window framing soon. Stay tuned
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 7:51pm On May 18, 2022
I appreciate your intuitive responses

Trully u know ur onions..

Is on site fabrication more expensive? Or cheaper?


Dennis3D:
Good evening sir. Fabrication on site is always better as it gives them the opportunity to always cross check their measurements and ensure no mistake is made and equally reduces the risks of broken glass during transportation in some cases.

It equally gives them opportunity to make and adopt new measurements when changes are made on site during fabrication. I have seen that happen. In fact in this project, we even changed the position and size of a window and removed one too.

So in my opinion, it's preferred to start up window fabrication on site.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:35pm On May 18, 2022
BiigTee:
I appreciate your intuitive responses

Trully u know ur onions..

Is on site fabrication more expensive? Or cheaper?
It has no role to play in the cost of the aluminum works when you have scaled through the negotiation process with your aluminum vendor.

Its even much preferable for them to fabricate on site because it reduces mistakes in measurements which can lead to increase in cost from the vendor if mistakes are made as a result of off site fabrication.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 9:41pm On May 18, 2022
Thanks chief.. Mr Taoreed was unavailable for the roofing job but I was able to get someone else.. For roofing and nogging we negotiated 200k Workmanship.. As a first time home owner what do u think I should be on the look out for as we make preparations to commence roofing?
Dennis3D:
It has no role to play in the cost of the aluminum works when you have scaled through the negotiation process with your aluminum vendor.

Its even much preferable for them to fabricate on site because it reduces mistakes in measurements which can lead to increase in cost from the vendor if mistakes are made as a result of off site fabrication.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 11:22am On May 19, 2022
BiigTee:
Thanks chief.. Mr Taoreed was unavailable for the roofing job but I was able to get someone else.. For roofing and nogging we negotiated 200k Workmanship.. As a first time home owner what do u think I should be on the look out for as we make preparations to commence roofing?
After the purchase of the roofing woods. Make sure they are treated with Soligum and Kerosene or oil to avoid termite in the future.

Also, ensure appropriate height is chosen for your roof before they start.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 6:13pm On May 19, 2022
God bless you
Dennis3D:
After the purchase of the roofing woods. Make sure they are treated with Soligum and Kerosene or oil to avoid termite in the future.

Also, ensure appropriate height is chosen for your roof before they start.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:41pm On May 19, 2022
BiigTee:
God bless you
You are welcome sir.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:43pm On May 19, 2022
Window fabrication update from site

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 9:07am On May 20, 2022
Good morning
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:02pm On May 20, 2022
Good evening and welldone sir
Dennis3D:
Good morning
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Whitehorse: 9:09pm On May 20, 2022
Just started following this project. Good project and inspiring. Well done.

@Dennis3D, I am wondering if the requirement for a foundation to cater for the soil type made a great difference in N18.5m spent to the decking level? In parts of the country (like Enugu) without water in soil issues, I am suspecting this cost might be lower right?

Dennis3D:
So far on up to this level of Decking was 18.5m on the main building
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Whitehorse: 9:11pm On May 20, 2022
Please what's the amount spent now up to this roofing level?

Dennis3D:
On a personal site visit.
Here comes what we have come up with so far
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 1:14am On May 22, 2022
Whitehorse:
Just started following this project. Good project and inspiring. Well done.

@Dennis3D, I am wondering if the requirement for a foundation to cater for the soil type made a great difference in N18.5m spent to the decking level? In parts of the country (like Enugu) without water in soil issues, I am suspecting this cost might be lower right?
The foundation cost on this project has a significant role to play in the cost. This is Raft foundation.

Enugu is mostly strip and pad because of the string soil.

Definitely Enugu foundation work is lower.
We have worked in Enugu before.
Ozara by four corners.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 1:15am On May 22, 2022
Whitehorse:
Please what's the amount spent now up to this roofing level?
I will check my system and update you on this ASAP. network here as well is very challenging pls bear with me if I respond a bit late.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:35am On May 22, 2022
Whitehorse:
Just started following this project. Good project and inspiring. Well done.

@Dennis3D, I am wondering if the requirement for a foundation to cater for the soil type made a great difference in N18.5m spent to the decking level? In parts of the country (like Enugu) without water in soil issues, I am suspecting this cost might be lower right?
The project Carcass is 27.9m (Foundation to Roofing)
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 11:45am On May 22, 2022
Window work update from here.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Whitehorse: 3:19pm On May 22, 2022
Thanks a lot for the cost information.

The project is now five bedroom as some modifications were done right?

Dennis3D:
The project Carcass is 27.9m (Foundation to Roofing)
1 2 3 4 5 6 7 8 9 10 ... 23 Reply

New: Luxury 3 Bedroom Terrace + 1 Bed BQ @ Abraham Adesanya AjahConstruction 4 Massive Bedroom With Garage All Ensuit7-bedroom Duplex + 2-bed Bq On 800+sqm @ Tijani Bello St Ojodu By Omole 1234

How Can My Husband Solve This House Problem?Owner Of Mansion Swept Away By Flood In Anambra Threatens To Kill Himself (PhotoHow Much Electricity Does Water Pumping Machine Use In a Month?