Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) - Politics (3) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) (42996 Views)

Former President Jonathan To Commission Kashimbilla Dam, Airport / 40MW Kashimbilla Hydro-Power Plant Lights Up Taraba Community / FG To Commission 40MW Kashimbilla Hydropower Plant Soon (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by TrittNG: 3:09pm On Oct 25, 2022
Vixlot:
Kashimbilla Hydroelectric Dam in Taraba state is set for Commissioning as the airstrip is completed.

https://twitter.com/StFreakingKezy/status/1584870468045053953
This is the type of Nigerian news I like.
cool
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by SamOchuko: 3:10pm On Oct 25, 2022
FalseProphet1:
Power generation has dropped, it was great around August and part of September, but now, since Sunday we haven't seen light in my area.

Nigeria is truly a shit hole.

This I have seen.


Bro na ur area b the shit hole for this one, we have light for an average of 16-19 hours here in Evbuku in Benin city, dweller of shit hole, maybe you should relocate from the shit hole where you dwell at the moment but please don’t relocate to another shit hole.

3 Likes 1 Share

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Ilaje1: 3:10pm On Oct 25, 2022
seguno2:


ThiefNuibu’s blind bat followers can go and verify. Otherwise let them fact-check it.

While not being affiliated to any party, but you need to realize there's inflation everywhere. Getting flight ticket this Christmas is wahala. Naija ticket that we get for $1k to 1500 is now $2500 and more. Paris wey we dey get for like 500, cheapest is 857(basic economy without a check in back), 1004 (main economy with one check in bag). Before you get this thing for $500 with 2 bags checked in. I don't want to talk about groceries. Inflation is everywhere. Hence the reason govt is increasing interest rate to induce recession.

4 Likes 1 Share

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by mecuries(m): 3:11pm On Oct 25, 2022
God bless Buhari for a dam? would the power generated be just for Taraba state or the whole federation? because if it is,how many MW of electricity can a dam produce?
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Perfectbeing(m): 3:11pm On Oct 25, 2022
Weirdcamila:
Nice . Why not make it a tourist attraction to earn more revenue. Nigeria needs creative thinkers and all the world will troop in to explore Nigeria .
That time we can start banning some countries
Its high time you guys stop solving every problem with your head. The world does not work the way it works in your head

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by emorse(m): 3:13pm On Oct 25, 2022
Kasssandra:


Does a dispatch rider celebrate when he has made a delivery?

Government has not done well by the power sector. Like removing price controls for example, and funding the transmission sector more.
In as much as all evidence suggest that only people with prepaid meters pay the actual price of power consumed and the majority are being ripped off with estimated billing, I have an argument for price control. Check this out

https://www.google.com/url?q=https://rooseveltinstitute.org/wp-content/uploads/2021/11/RI_Industrial-Policy-Price-Controls_Brief-202111.pdf&sa=U&ved=2ahUKEwignbXjxfv6AhXHnaQKHYXlB00QFnoECAkQAg&usg=AOvVaw37XOhlJD7obUnNaol9za82

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by franudi: 3:13pm On Oct 25, 2022
APC is commissioning dam up and down yet we are in darkness. Paper projects.
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Mutigadara1: 3:13pm On Oct 25, 2022
if you will check the top 20 countries with the most debt in the world, you will see that the countries you glorify as developed topped the chart. everybody dey borrow naso the world dey works. please let us keep praying for our darling country and try to work it out instead of allowing sentiments, religious, ethinic, political party differences blind our eyes. when something good is done applaud it when something wrong is done then critiseze it.
Iamzik:


At what cost? Your grandchildren will meet the debt because 2023 budget and beyond will be funded with debt

4 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by seunmsg(m): 3:13pm On Oct 25, 2022
salesbloo:


I think the remoteness of the location

So, it can only be accessed by the airstrip?
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Perfectbeing(m): 3:14pm On Oct 25, 2022
DMerciful:
All these meaningless propaganda projects that has zero impact on the standard of living of Nigerians won't save APC!

They keep talking about dams they built yet the country is covered with flood.

All of a sudden we start seeing completion of dams that nobody knows when they were started. Lies!
Slowpoke. Why don't you use less than 5MB to do research on the dam..
Most of you Obidients think Nigeria started in May 25th

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by anonimi: 3:15pm On Oct 25, 2022
Vixlot:
The Dam also has an airstrip

God Bless President Buhari
God Bless Incoming President Bola Tinubu
God Bless Taraba State
God Bless Federal Republic of Nigeria

Cheap and cheerful to excite low expectations people?
Do you have stable electricity and 20,000MWs that Buhari promised in 2015 to be delivered in four years

2 Likes 3 Shares

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by salesbloo: 3:15pm On Oct 25, 2022
seunmsg:


So, it can only be accessed by the airstrip?
not really ... advantages of having added and quick access

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Perfectbeing(m): 3:16pm On Oct 25, 2022
Iamzik:


At what cost? Your grandchildren will meet the debt because 2023 budget and beyond will be funded with debt
So we shouldn't construct any infrastructure because we are afraid of debt?
That means someone like Dangote won't dare to build a refinery because of debt.

2 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Didi2d(m): 3:17pm On Oct 25, 2022
FalseProphet1:
Power generation has dropped, it was great around August and part of September, but now, since Sunday we haven't seen light in my area.

Nigeria is truly a shit hole.

This I have seen.

Same here in agbara Odofa. No light
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by voltron14: 3:17pm On Oct 25, 2022
omobolarinwa1:
All for Northern state..what about South South and South East? There were large ocean in the region too which the government can build hydro-electric power dam...even the two in the west is not functioning enough..I count more than 10th hydro-electric power dam in North...oga Oo

You no want deve (gratification) again?
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Parachoko: 3:17pm On Oct 25, 2022
omobolarinwa1:
All for Northern state..
what about South South and South East? There were large ocean in the region too which the government can build hydro-electric power dam... even the two in the west is not functioning enough..I count more than 10th hydro-electric power dam in North...oga Oo
See the way this IPOB member they display his ignorance grin

2 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by nedekid: 3:17pm On Oct 25, 2022
Moh247:
On infrastructure APC is still unbeatable

More projects to be commissioned

More needs to be done on Security
Oga, it is a good laudable project, initiated by Obasanjo, resuscitated and fully funded by Jonathan and completed during buhari's time.
A dam is a major project that takes time not like a car you buy from a shop.
To ascribe this as an apc feat is far fetched.

https://www.google.com/amp/s/thenationonlineng.net/inside-the-1billion-money-spinner-called-kashimbila-dam/amp/

1 Like 1 Share

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by naijapikin2(m): 3:17pm On Oct 25, 2022
The great potential that this nation has that is wasting.
We have what it takes to make europeans seek for nigerian visa, but poor leadership has reduced us to a sleeping, ineffective, impotent giant.
We still have our destiny in our hands.
I will vote for peter obi, however if you vote for tinubu or atiku and it turns out bad, we'll all feel the heat.
My choice is obi.
God help our country.
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by ken045501: 3:18pm On Oct 25, 2022
No be only unbeatable… you go just Dey type rubbish
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Weirdcamila: 3:18pm On Oct 25, 2022
[quote author=Idiko1 post=117866043]

Who in his/her sane mind would want to visit a structure maned by Nigerians? I shall never visit Taraba State as long as Nigerians supervise the dam. [/quote

]
Nigerians build structures outside the country , we have the talent .

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by seunmsg(m): 3:18pm On Oct 25, 2022
salesbloo:
not really ... advantages of having added and quick access

Alright. Thanks.

2 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Parachoko: 3:19pm On Oct 25, 2022
Kasssandra:


But it is working now...

Yes, APC has failed...but when they do well, at least clap for them grudingly.

Even then, it won;t improve our power...we need something like 50000mw , then we can say bye bye to generator, except in some remote areas.
Nah small small

You can't expect us to get 50000MW at a go

2 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Winning123: 3:19pm On Oct 25, 2022
You are not properly educated including those who clicked likes for your post. Nigeria can only be rich, reduce poverty and hardship not because she has money but because of she has such infrastructures like this

Nosayer:


On increment of poverty and hardship, they're unbeatable too.

At least, the APC increased the level of hardship in Nigeria to an astronomical level.

2 Likes

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by nedekid: 3:20pm On Oct 25, 2022
HausaIgboYoruba:
Atiku failed to do this project while he served as Vice President
Obj stated it, GEJ funded it fully, it was completed during buhari's time.

2 Likes 2 Shares

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Parachoko: 3:21pm On Oct 25, 2022
Idiko1:


Who in his/her sane mind would want to visit a structure maned by Nigerians? I shall never visit Taraba State as long as Nigerians supervise the dam.
Taraba is a very beautiful state, you will surely love it
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Okoroawusa: 3:21pm On Oct 25, 2022
I Love PMB
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by seguno2: 3:21pm On Oct 25, 2022
Ilaje1:
Why not affiliated to any party, but you need to realize there's inflation everywhere. Getting flight ticket this Christmas is wahala. Naija ticket that we get for 1k to 1500 is now 2500 and more. Paris wey we dey get for like 500, cheapest is 857(basic economy without a check in back), 1004 (main economy with one check in bag). Before you get this thing for $500 with 2 bags checked in. I don't want to talk about groceries. Inflation is everywhere. Hence the reason govt is increasing interest rate to induce recession.

Were Tinubu, Buhari and APC people ignorant of that when they promised change

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by Keji1012(m): 3:21pm On Oct 25, 2022
Treasure17:
How will this reduce the price of rice in the market?

When u get sense that APC na scam

1 Like

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by YeyeGbami: 3:22pm On Oct 25, 2022
FalseProphet1:
Power generation has dropped, it was great around August and part of September, but now, since Sunday we haven't seen light in my area.

Nigeria is truly a shit hole.

This I have seen.

If rain don stop, light go reduce. They wan make heat kill their generation. Now na fuel hike
Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by seguno2: 3:23pm On Oct 25, 2022
nedekid:

Obj stated it, GEJ funded it fully, it was completed during buhari's time.

Thanks for the reminder.
The unbelievers can go and verify. Otherwise they should fact-check the information.

2 Likes 2 Shares

Re: Kashimbilla Hydroelectric Dam In Taraba Awaits Commissioning (Pictures) by olamike02: 3:23pm On Oct 25, 2022
IN 16YRS OF PDP THE ONLY GAVE US IPP WHICH IS A GLORIFIED GENERATOR SETS. PMB HAS DONE WHAT PDP FAILED TO DO. RAILWAY,LAGOS-IBD EXP,2NB THE LIST CONTINES.

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

Dami Osinbajo Graduates From Dartmouth College In The U.S / Babajide Sanwo-Olu: 5 Things You Don’t Know About Lagos APC Governorship Candida / Saudi Arabian Police Arrest 30 Nigerians For Displaying Tinubu's Campaign Poster

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.