Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,452 members, 7,819,665 topics. Date: Monday, 06 May 2024 at 08:12 PM

Construction Diary Of A Semi Detached Bungalow At Ikorodu - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Diary Of A Semi Detached Bungalow At Ikorodu (32722 Views)

Construction Diary: Building a Duplex on the Rocks. / Construction Diary: 100-seater Lecture Theatre / Construction Diary Of A Block Of 6 Flats (2 Bedrooms) In Enugu (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 10:20pm On Jul 26, 2013
FELLOW NAIRALANDERS IT IS MY PLEASURE TO BLOG THIS OUR LITTLE PROJECT ON GOING IN THE HEART OF IKORODU, LAGOS.

PROJECT DESCRIPTION: THE BUILDING IS SEMI DETACHED BUNGALOW ON A FULL PLOT OF LAND, THE BUILDING CONSIST OF EXECUTIVE 3-BEDROOM FLAT ALL ENSUITE, WITH ENTRY PORCH, ANTE ROOM, STUDY,DINNING, VISITOR'S TOILET, LARGE SITTING ROOM (6m X 6m) ALSO ALL THE ROOMS ARE PRETTY OK. THE OTHER FLAT IS 2-BEDROOM ALL ENSUITE WITH VISITOR TOILET, DINNING, AND STANDARD ROOMS.
tHE BUILDING DIMENSION IS 25.4m X 12.825m. THIS BUILDING IS DESIGN IN SUCH THAT IF THE CLIENT WISHES THE 2-BEDROOM FLAT CAN BE CARVED OUT WITHOUT HAVING INTERFERENCE WITH 3-BEDROOM FLAT.

PROJECT BUDGET : PAY AS YOU GO i:e THE ESTIMATE IS BASED ON PHASE. THE PHASE WE ARE WORKING ON NOW IS THE FOUNDATION THE COST BREAK DOWN WILL BE RELEASED AT THE END OF THE PHASE.

DURATION: FOUNDATION-2 WEEKS.

NOTE: OUR FOUNDATION IS NOT GOING TO HAVE A GERMAN FLOOR, AND THIS IS THE MORE REASON I WANT TO BLOG THIS PROJECT SO AS TO SHOW US HOW TO REALLY DO A BUILDING WITHOUT GERMAN FLOOR AND STILL BE FREE FROM DAMPNESS. EVEN IF YOU HAVE YOUR HOUSE BUILT ON A VERY FIRM LAND AS WE HAVE IN IKORODU HERE DOES NOT STOP DAMPNESS, THIS DAMPNESS IS THE REASON WHY YOUR CLOTH GOT SPOILT AND GROW MUCUR IN MOST HOUSES WITH IN-BUILT WARDROBE AND WITHOUT GERMAN FLOOR.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 9:34am On Jul 27, 2013
Day 1 on site

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Nobody: 10:49am On Jul 27, 2013
Subscribing
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 11:40am On Jul 27, 2013
You are welcome sir, more updates later
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Chekitaut: 3:30pm On Jul 27, 2013
Sir, activate
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by esoorita: 11:45pm On Jul 27, 2013
I'm on board sir!
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 6:35am On Jul 28, 2013
Day 2

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by didisky(m): 9:11am On Jul 28, 2013
Thanks for ur effort,we r following u.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by kopell: 9:30am On Jul 28, 2013
@Aventures hunn so you know want show us this your projet before abi, until when I ask you say you go vacation before you open up. it all good sha. I will call all my other class mate now to come see your wonders oh.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 12:52pm On Jul 28, 2013
@Kopell you are highly welcome on this tread. Like i said on Oga spyder tread that i have been learning silently. initially i do not want to blog this project because we are just taking it to DPC level only and i do not know how soon the client will continue the work, but i discovered that there are some question that was raised on Mr Syder's tread about dampness which i feel i have a little idea which i want to apply here that might be help someone out there. Tx
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 1:03pm On Jul 28, 2013
The drill used in drilling this borehole was a locally made and pretty fast in drilling and it can go farther than the normal hand drilling. There was a time we had a challenge on borehole drilling in one of our site the first borehole contractor ran away after we have spent close to about 250k because they ve drilled over and over without success. we decided to do a geophysical test and the test recommended we are t drill 330ft to get to aquifer. and the cost was over a million naira. Later this man showed up and boasted he will do it for 250k no body believed him and he sign an agreement for a total refund in case he fails, but to day the rest is a good story 2 years running the borehole is still functioning perfectly well. To God be the Glory.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by mufutau55(m): 5:49pm On Jul 28, 2013
Well, Aventures.. another student reporting to class for learning. Let's go there!

I am glad that Borehole driller get "water juju" and he was successful.smiley

But really people scared me with that Borehole drilling on my project telling me
about 1-1.5million that was about six years ago, some guys just drilled one for me
last month for only N150,000 and it's being running fine.

I respect Nigerian in some aspects of professionalism, but others; not so good.

Hajji Mufutau
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 7:20pm On Jul 28, 2013
@ Hajj you are wel come. I also share your opinion of some of our professionals some are good some are bad. How i wish the good ones can get some encouragement.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 7:51pm On Jul 28, 2013
Day 3and 4 work:

we broke the ground: excavation was done. it took us two days to complete this excavation as we have to cut all the block lines because we are not planning to do a German floor. One of the advantage of the German floor is that where you have a light load say 6 inches partition wall that is not really long, such can be set out after the German floor. pics will come up later.

Also we took delivery of 10 tons sharp sand and 15 tons granite for the strip foundation casting tomorrow

meanwhile below is the floor plan of the project where are working on,designed by one of the young bravest architect of our time.

1 Like

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by mufutau55(m): 8:42pm On Jul 28, 2013
Aventures: Day 3and 4 work:

meanwhile below is the floor plan of the project where are working on,designed by one of the young bravest architect of our time.

This is a very good plan design.. I take it that the two bedroom in the back is like a Boy's/Maid Quarter?.
Is the plan designed by one of the Nairaland Arcs? If possible, who? If not, that will be understood.
Surely awaiting the development pictures. Good luck.


Hajji Mufutau

1 Like 1 Share

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by austinsmat(m): 9:27pm On Jul 28, 2013
Nice but do something about ur camera

1 Like

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 11:12pm On Jul 28, 2013
mufutau55:

This is a very good plan design.. I take it that the two bedroom in the back is like a Boy's/Maid Quarter?.
Is the plan designed by one of the Nairaland Arcs? If possible, who? If not, that will be understood.
Surely awaiting the development pictures. Good luck.

Yes you are right, the client is not based in Lagos yet, and he wanted someone that can be taken care of the hous that is why we had that attachemd 2-bedroom flat which will later serve as maid's quarters. i will show the way we intend to carve out privacy for the client later on.
[quote author=austinsmat]Nice but do something about ur camera
sir i will surely improve on the quality of my pics. thanks so much.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by mufutau55(m): 11:17pm On Jul 28, 2013
Aventures:
Yes you are right, the client is not based in Lagos yet, and he wanted someone that can be taken care of the house that is why we had that attached 2-bedroom flat which will later serve as maid's quarters. i will show the way we intend to carve out privacy for the client later on.
[

Thanks. I will surely like to see how the privacy thing was implemented.. I am in the same situation with your client, so I just built a 2 units of 1 bedroom flat as my Boy's Quarter at the back of main building and the two flats can also be linked as one flat, if occupied by a large family. I am surely following this thread. Thank you.

Hajji Mufutau
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by jam04(m): 7:17am On Jul 29, 2013
Subscribing... Please change the camera or adjust the setting for better picture clarity. Thanks
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by blank(f): 10:44am On Jul 29, 2013
Very interested in the foundation.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by twinskenny(m): 1:21pm On Jul 29, 2013
reporting to class my oga.. following
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by olubuffett: 1:59pm On Jul 29, 2013
nice, love to see how this project progress.
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by olubuffett: 2:23pm On Jul 29, 2013
If the foundation as no German floor, why take two weeks to complete?
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by didisky(m): 5:13pm On Jul 29, 2013
In the floor plan,I noticed that there are no visitor's toilet in either of the flats. will one's visitors access the bedroom to use d toilet ?
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by mufutau55(m): 6:28pm On Jul 29, 2013
didisky: In the floor plan,I noticed that there are no visitor's toilet in either of the flats. will one's visitors access the bedroom to use d toilet ?

Look carefully.. it's not labelled. The Visitors Toilets in both building is beside the Porch entrance.
Look by by the Ante Room in the Main building. And by the Livingroom in the back Flat.

Hajji Mufutau
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by NewInvestor(m): 6:50pm On Jul 29, 2013
Subscribing.

Great floor plan. Pray you never have a fire in the kitchen that spreads to the dining ( technically anyone in the bedroom area would be S.C.R.E.W.E.D).

Of course am an illiterate where architecture is concerned, dont mind me.

God's blessings as you progress.

2 Likes

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by segcymoor(m): 8:20pm On Jul 29, 2013
olubuffett: If the foundation as no German floor, why take two weeks to complete?

May be because it has not to do with how fast but how well.....over to u chief host

1 Like

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by didisky(m): 8:48pm On Jul 29, 2013
mufutau55:

Look carefully.. it's not labelled. The Visitors Toilets in both building is beside the Porch entrance.
Look by by the Ante Room in the Main building. And by the Livingroom in the back Flat.

Hajji Mufutau

Sorry,I just noticed them
Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 6:01am On Jul 30, 2013
NewInvestor: Subscribing.

Great floor plan. Pray you never have a fire in the kitchen that spreads to the dining ( technically anyone in the bedroom area would be S.C.R.E.W.E.D).

Of course am an illiterate where architecture is concerned, dont mind me. God's blessings as you progress.

Well you may be right, may God forbid evil in our houses, though we have a plan to use smoke and fire detector, video phones and the likes twinskenny is booked down for all that. Also we should note that every openings in a house is a sortt of security weakness. To everything there are always advantages and disadvantages. May God help us all.


segcy.moor:


May be because it has not to do with how fast but how well.....over to u chief host
how well really matters, and als we considered the raining season we are and also other unforseen circumstances. It is better to give enough time and finish b4 that time than to ask for more time. Ofcourse we are going to round up this stage b4 that 2 weeks by God s grace

1 Like

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 6:24am On Jul 30, 2013
Pictures update for day 5 work

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 6:26am On Jul 30, 2013
after breaking of the Groung we commenced sowing of the seed.

Re: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(m): 9:11pm On Jul 30, 2013
the proposed internal fencing to create privacy for the main bldg

(1) (2) (3) (4) (5) (6) (Reply)

Mark Zuckerberg Buys Neighbouring Houses For Privacy / Chinonso Uba's Ezeacho Hotel, House, Shops Burnt In Imo, 2 Feared Killed / What Age Should Owning A House Become A Priority?

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 38
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.