Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 3:35pm On Mar 21, 2022 |
michlins: please how low income earners like us build again please It's not as difficult as people think. The keyword is "start". When you start, other things will respect themselves. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 2:42pm On Mar 21, 2022 |
Hayzed25: Boss Spyder I will like to ask pls, on average, how much does it cost to build a four bedroom bungalow from foundation to finishing N16M |
Properties › Re: The Awka Block Of 6 Flats Of 2 Bedrooms Project by spyder880(op): 10:06am On Mar 21, 2022 |
yungz: hello oga spyder880 great work you’re doing here, if you don’t mind, i will like to ask you some questions based on my observation.
1. i noticed that after sand filling , you don’t mat the foundation instead you go ahead to cast the Dpc, why is that so?
2. i expected something like for the column base (pics1) but in most of your project this is what you use (pics 2) Specifications Sir. Every building has a building plan prepared by professionals who must have visited the site and studied the soil structure and the possible changes that might occur with the foundation as the years go by, they also study the changes in relationshipwith the size and weight of the building. With the knowledge of the soil structure, they prepare a detailed building plan specifying the types of procedures to be carried out for that particular building project. So if the building plan says single matting of the foundation columns, you apply it, and if it specifies double matting, top and bottom, you apply same on the particular project. If the building plan says there should be foundation matting to reinforce the DPC, you apply same. No building process or method is made to suit every building in every terrain. Thank you. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:54am On Mar 20, 2022 |
Lintel beams reinforcement works completed and carpentry almost completed too. We are casting the concrete of this section of the building today.
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:51am On Mar 20, 2022 |
folyshow: Highly expedited progress. Well-done Engineer Spyder
Would you mind to show cost expended so far, perhaps material costs? That will be helpful, if possible
Thanks. I will try to check this later, things are not very easy now. |
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 6:19am On Mar 20, 2022 |
Foundation excavation for the first building started immediately............
|
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 6:14am On Mar 20, 2022 |
Pegging out the spaces for the first building at this estate...........
|
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 6:09am On Mar 20, 2022 |
Framing the sides of the culvert yesterday........
|
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 9:17pm On Mar 19, 2022*. Modified: 6:08am On Mar 20, 2022 |
whirlwind7: Cool. That is near. I should be gearing up to start mine there. That will be very good. Next time I go to site, I will show pictures of the nearest houses to the estate. |
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 4:15pm On Mar 19, 2022 |
whirlwind7: What is the distance of nearby residencies or other occupied buildings around there? Around 200 metres. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 11:23am On Mar 19, 2022 |
Ongoing.......
|
Properties › Re: The Making Of The "Beautiful 6 Bedroom Duplex In Enugu" by spyder880(op): 10:18am On Mar 19, 2022 |
Dressing the windows in.........
|
Properties › Re: The Making Of The "Beautiful 6 Bedroom Duplex In Enugu" by spyder880(op): 10:15am On Mar 19, 2022 |
Bringing in windows.........
|
Properties › Re: The Making Of The "Beautiful 6 Bedroom Duplex In Enugu" by spyder880(op): 8:26am On Mar 19, 2022*. Modified: 10:13am On Mar 19, 2022 |
Some completed ceiling works.......
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:53am On Mar 19, 2022 |
More pictures of work progress...........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:47am On Mar 19, 2022 |
More
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:41am On Mar 19, 2022 |
Let's start the decking slab wooden platform........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:36am On Mar 19, 2022 |
Ready to start.........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 5:33am On Mar 19, 2022 |
Buying and supplying more building materials for this decking slab..........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:27am On Mar 19, 2022 |
More
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 5:22am On Mar 19, 2022 |
Compound levelling in progress......
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:51am On Mar 19, 2022 |
Some more ceilings under construction...........
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:47am On Mar 19, 2022 |
Working on the ceilings of this building..........
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:43am On Mar 19, 2022 |
Wall treatment inside the flats.........
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 4:39am On Mar 19, 2022 |
Wall treatment continues here.......
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:19am On Mar 19, 2022 |
I also have men here, who are working on the kitchen cabinets counter tops, concrete type........
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:15am On Mar 19, 2022 |
The window frames has arrived and we are dressing them in immediately.........
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 4:12am On Mar 19, 2022 |
There has been an escalation of works at this site as all teams are working to bring this beautiful building to completion. Here the doors of this house are being made........
|
Properties › Re: The Awka Block Of 6 Flats Of 2 Bedrooms Project by spyder880(op): 4:09am On Mar 19, 2022 |
We are already casting the decking of this attached shops at this building site.
|
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 4:06am On Mar 19, 2022 |
There is hope that I will start the construction of some rooms at this site. The rooms are just for renting because I see that people will be willing to live in this estate, there is also the chance of turning the rooms into an agricultural outpost, pending when we will start building new duplexes here. More pictures when we start later today. |
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 8:50pm On Mar 18, 2022 |
We have done some carpentry works on the culvert of this estate.........
|
Properties › Re: Buy Lands At A New Layout In Akpuoga Nike, Enugu. by spyder880(op): 7:26pm On Mar 18, 2022 |
whirlwind7: Good day!
What is the update on the work at this site, please? A lot, work is ongoing only that I have been a little tired up with other work. |