Re: These Are Stages Involved In Building A House by aboki2000(m): 8:50am On May 02, 2017
odicity:
Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.


http://deljconsult.com/stages-involved-in-building-a-house/
Re: These Are Stages Involved In Building A House by 36STATES: 9:34am On May 02, 2017
money121:
Another Successful Roofing Project @ Owo in Ondo State..
Please what are you waiting for.. Call/WhatsApp 080-85-310-359 For your Next Roofing Project

Steptiles Aluminum 0.55mm guage

Roof meters 388m
Cladding 99m
flat Sheet 76m

Total Amount Spent for the materials: 1,204,500


Terrible handwork. Go first to develop your skill. It looks really bad done. My honest assessment.

2 Likes

Re: These Are Stages Involved In Building A House by money121(m): 9:47am On May 02, 2017
36STATES:


Terrible handwork. Go first to develop your skill. It looks really bad done. My honest assessment.
What's this one saying

1 Like

Re: These Are Stages Involved In Building A House by postension: 10:13am On May 02, 2017
Please note, setting out of a building is an essential/critical stage of building construction and should not be done by a bricklayer. You want to set out the FOUNDATION of your building and you entrust it in the hands of a bricklayer? then you are not serious. The Site/Resident Engineer is ment to do that. Stop building collapse, get a professional to handle your building.
Re: These Are Stages Involved In Building A House by zik4ever: 10:40am On May 02, 2017
Please is there a standard payment for an architect's service e.g. is it 5% or 10% of total cost of the building or it is discretionary/negotiated?

1 Like

Re: These Are Stages Involved In Building A House by AkhereOkaka(m): 11:46am On May 02, 2017
[quote author=odicity post=40211999]Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.

Sir, I have the plan of building 3 bedroom flat, how many Six inches block do I need to buy in terms of quantity. Kindly treat with dispatch.

Thanks
Re: These Are Stages Involved In Building A House by restored2016(m): 12:42pm On May 02, 2017
Teewhy2:
Knowing a process of building a house is different from knowing the technicalities behind the process. A lot of people make things mistake just because they want to safe money but at the long run they spent more.
I know of a building where by the owner claim to know the process but at the end of the day he didn't consider the road level, so after the area has a significant level of development most of the rain water from the street flows into the man's compound. The road is yet to be tarred but already the compound is already lower than the road.
Most people that rent the ground flats don't spend more than a year before leaving because water enters their apartment. He is planning to do major renovation now and it is like penny wise pound foolish.


Are you building on a swampy area, want to do pile foundation /Need Roof parapet.
Reduce the building load by making use of polystyrene material for your roof parapet and slab.
Click below to get more information

https://www.nairaland.com/3726763/alternative-llbuilding-material-expanded-polystyrene
this information is not for laymen like us to build for ourselves but for us to know what is involved and the necessary steps involved so that we will not be defrauded. I appreciate this a lot. God bless the OP.

3 Likes

Re: These Are Stages Involved In Building A House by Alasi20(m): 12:45pm On May 02, 2017
Owkay
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 4:32pm On May 02, 2017
nice one @op, but you forgot an aspect of work which is crucial before your dpc/German floor. you definitely need your plumbing/mechanical team to install your plumbing fixtures which comes mostly from beneath the floor except you plan on doing surface piping which is odd n outdated. I.e your wash hand basin water supply pipe/ w.c outlets so on.

these are just in addition as you the O.P has done a very good job and nice compilation.
Arc. Stephen
07081911211

1 Like

Re: These Are Stages Involved In Building A House by Brimmie(m): 6:28pm On May 05, 2017
Flashmove:


Please add ( ï ) to your domain name to become Toilet

make i check so so that you will not attack me like DSS....

Almost Funny!! undecided

See your head like Bag of Beans!!

3 Likes

Re: These Are Stages Involved In Building A House by blackboy(m): 4:13pm On May 06, 2017
Interesting
Re: These Are Stages Involved In Building A House by Oju4190: 8:53am On May 14, 2017
Gudday.....My house is on roofing stage but because of financial contrain can i do the German floor without roofing. While dis decision is because I intend to take loan to roof d house so b4 den i want to b using my salary to do some work on the house so dat immediately i roof i will ensure dat i enter d house so dat paying back will not b too stressful for me..... Tanks
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 7:03am On May 15, 2017
Oju4190:
Gudday.....My house is on roofing stage but because of financial contrain can i do the German floor without roofing. While dis decision is because I intend to take loan to roof d house so b4 den i want to b using my salary to do some work on the house so dat immediately i roof i will ensure dat i enter d house so dat paying back will not b too stressful for me..... Tanks

off course, there is no harm in doing your floor without roof. go ahead Sir, what I presume might only happen is pple/goats defecating there depending on the environment your site is.
Re: These Are Stages Involved In Building A House by Oju4190: 7:20am On May 16, 2017
Horlardorjah:


off course, there is no harm in doing your floor without roof. go ahead Sir, what I presume might only happen is pple/goats defecating there depending on the environment your site is.
tanks so much. my fear is dat wen it rain d whole place will look like swimming pool since dere is no percolation of water
Re: These Are Stages Involved In Building A House by Alexbrendan: 2:21pm On May 18, 2017
Very beautiful post! but how about if it's a duplex?
Re: These Are Stages Involved In Building A House by ATnTMartz: 10:15pm On May 26, 2017
I am just curious of stages of building too after Foundation (German floor type) is done. I mean the stages after the foundation to the roofing level. I received a quote from my builder and i need to veriy this with any experience builder in the house.

It is a 6 bedroom duplex on a 2plots of land in Ibadan.

can anyone help (before i post the numbers and detail my builder sent to me)
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 11:17pm On May 26, 2017
[quote author=AkhereOkaka post=56130442][/quote]
the plan is needed before quantity of block can be calculated. so upload your drawing and get response asap
Re: These Are Stages Involved In Building A House by Horlardorjah(m): 11:21pm On May 26, 2017
ATnTMartz:
I am just curious of stages of building too after Foundation (German floor type) is done. I mean the stages after the foundation to the roofing level. I received a quote from my builder and i need to veriy this with any experience builder in the house.

It is a 6 bedroom duplex on a 2plots of land in Ibadan.

can anyone help (before i post the numbers and detail my builder sent to me)

drawings needed to quantify your project. you can mail me osunlanastephenp@yahoo.com
Re: These Are Stages Involved In Building A House by ATnTMartz: 5:56pm On May 27, 2017
Horlardorjah:


drawings needed to quantify your project. you can mail me osunlanastephenp@yahoo.com


Thanks. Check your email
Re: These Are Stages Involved In Building A House by ATnTMartz: 5:58pm On May 27, 2017
Horlardorjah:

the plan is needed before quantity of block can be calculated. so upload your drawing and get response asap

These are the drawings

Re: These Are Stages Involved In Building A House by ATnTMartz: 2:03pm On May 31, 2017
Is there anybody here to respond to my comment or inquiry
Re: These Are Stages Involved In Building A House by OMEGA009(m): 2:52pm On Apr 01, 2018
Hi. I’m a novice in building and I need a cost estimate for a 5 bedroom duplex with penthouse. Firstly from excavation to DPC. Building plan says estimated size of building is 167 sqm and d DPC level must be +450 (dunno what that means). It has 23 box pillars and 3 round pillars. Pls cost estimate must include quality material as I want to eliminate all forms of rising damp and penetrating damp. Thx a million.
Re: These Are Stages Involved In Building A House by odicity: 4:15pm On Apr 01, 2018
OMEGA009:
Hi. I’m a novice in building and I need a cost estimate for a 5 bedroom duplex with penthouse. Firstly from excavation to DPC. Building plan says estimated size of building is 167 sqm and d DPC level must be +450 (dunno what that means). It has 23 box pillars and 3 round pillars. Pls cost estimate must include quality material as I want to eliminate all forms of rising damp and penetrating damp. Thx a million.
OK chat me up on WhatsApp 08115801276
Re: These Are Stages Involved In Building A House by buzzetin(m): 5:30am On Apr 02, 2018
True words
Re: These Are Stages Involved In Building A House by DEXTROVERT: 7:12pm On Jun 23, 2018
money121:
Another Successful Roofing Project @ Owo in Ondo State..
Please what are you waiting for.. Call/WhatsApp 080-85-310-359 For your Next Roofing Project

Steptiles Aluminum 0.55mm guage

Roof meters 388m
Cladding 99m
flat Sheet 76m

Total Amount Spent for the materials: 1,204,500



Nice one, how much in total will do for 4 bedroom using same zinc

1 Like

Re: These Are Stages Involved In Building A House by Logistics(m): 12:31am On Dec 16, 2018
For someone that has filed for c of o. How do I go about building approval?
Re: These Are Stages Involved In Building A House by odicity: 11:42pm On Dec 28, 2018
Logistics:
For someone that has filed for c of o. How do I go about building approval?
which state?
Re: These Are Stages Involved In Building A House by joycluv: 9:31am On Dec 29, 2018
What is the maximum courses of blocks to lay after lintel to have a high ceiling? Thanks
Re: These Are Stages Involved In Building A House by odicity: 7:30am On Dec 30, 2018
joycluv:
What is the maximum courses of blocks to lay after lintel to have a high ceiling? Thanks
five ( standard). contact Deljic ventures for your designs and construction. www.fb.com/deljconsult
Re: These Are Stages Involved In Building A House by Asquare84(m): 7:57am On Dec 30, 2018
Nice post
Re: These Are Stages Involved In Building A House by odicity: 8:04pm On Dec 30, 2018
Asquare84:
Nice post
uwc

contact Deljic ventures for your designs and construction. www.fb.com/deljconsult
Re: These Are Stages Involved In Building A House by motta(m): 10:40pm On May 19, 2021
odicity:
Stages involved in Building a house

Most people that are nursing the dream of erecting a building structure are often curious about the stages involved in building their dream home. We want to give an overview of those stages

1.Seek advice from your Architect/Engineering on what type and size of land the can suit your dream house

2.look for a land speculator or agent, that will help you in getting the land that can soothes your purpose. make sure you see the land and get all necessary original document related to land before payment. you can arrange with a lawyer to help you in preparing and checking the documents to make sure you are not buying a land from the wrong person,and to avoid land with dispute.

3. You need meet with your local town planning authority in your area to make sure that land is meant for the purpose you have in mind and they can give first hand information about development pattern in that area.Land under Government acquisition will be found through this process.

4.you need to arrange with a Land surveyor to establish and draw out the site boundary, the surveyor will also put the position beacons on the boundaries.

5.The drawings of the land surveyor will be used to produce at befitting building plan for you, a set of plans building plan usually three will have to be used to seek for building plan approval.

6.Clear the site manually or mechanically(bulldozer)

7. You can now move to site, for about 2-3 bedroom bungalow at starting, get two trips of sand and a trip of gravel,

8. locate a secured place where you can keep your bags of cement

9. Acquire a tank or drum where water can always be stored for use.

10. Buy about 1000 blocks for a starter. you can choose from five,six and nine inches block as required or suggested by your builder.

11. Setting out time, in some case bricklayers uses blocks to set out a foundation most especially when it is a small building and the ground is level, The Builder can collaborate with bricklayer to do this in a some complex plan. They will have to buy woods, ropes, nails and you have to pay for the services or based on contract or as agreed.

12. After the setting out have be done foundation excavation commences, after excavation concrete is poured on the foundation and leveled. the leveling is done by a mason to ensure uniformity of foundation

13. Block laying begins. Blocks are laid by the bricklayers on the concrete to about three or more courses (Coaches) as required, this serving as the d.p.c level. It is then filled with red sand and rammed (compacted or made hard). an over-site concrete or (German floor) is poured round to cover the d.p.c (in waterlogged, sloppy or sandy area you may need to apply reinforcements or Iron at the edges of building and nylon-like membrane is used to cover some site especially when there is a threat of water problems).

14. At this stage blocks are laid to window base, four courses(coaches) or layers after marking out the doors, then after the four coaches(courses) you mark out the windows and go another five coaches(courses), the entire opening in the house is now ready for concrete lintel.

15. At this stage Iron benders or welders are involved, they will have to make their estimate the carpenter and the bricklayers are all going to work here the welder is responsible for cutting and bringing in the Iron, the carpenter makes the frame or form work to contain the concrete.The bricklayer with laborers pours(casts) into the boxes(form work) which are properly filled with concrete.

16. At least two or more layers of blocks are laid on the lintel after this the building is ready for roofing.

17. At this stage carpenters are contacted, the timber or steel in the case of larger projects are estimated and cost. Roofing material could be chosen from aluminum, asbestos, plastics, galvanized zinc.

18. The electrification and plumbering works can begin. You can now contact your electrician and plumber. you can ceiling simultaneously or after electrification. Your soak-away pig can now be Dug and connection of pipe services will be handled by the plumber,

19. At this stage door frames, wardrobes by furniture maker, windows and other accessories can commence

20. Tillers or terrazzo contractors can be contacted if need be.The tilling and plastering works can go on simultaneously. two to three trips of plaster sand will be needed for plastering a moderate size.


http://deljconsult.com/stages-involved-in-building-a-house/

(1) (2) (3) (Reply)

How To Calculate Materials Needed For German Floor / Which Of These Gasoline Generators Is Better For Domestic Purposes / Dubai Is Building A Rotating Skyscraper. Here's Everything You Should Know. PICS

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 63
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.