Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by mrayosexy: 12:21am On Apr 21, 2016 |
HELLO SIR, PLEASE IN A ROUGH PRICE, HOW MUCH IS IT TO COMPLETE A 3 BEDROOM BUNGALOW IN IBADAN OYO STATE. 1 BEDROOM EN-SUITE 2 AVERAGE BEDROOMS WITH A TOILET AND BATHROOM IN THE MIDDLE KITCHEN AND OTHERS. SOMETHING VERY MODERATE. SOMETHING SIMILAR TO THE ONE YOU ARE BUILDING IN SULEJA AM JUST AN AVERAGE SALARY EARNER BUT I WANT TO START BUILDING MY OWN HOUSE. CAN YOU ALSO WORK/BUILD IN IBADAN AS WELL. KIND REGARDS AY. |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 10:16pm On Apr 21, 2016 |
mrayosexy: Yes sir, I can work and build in ibadan too. The estimate will depend on your building plans 1 Like |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by mrayosexy: 12:03am On Apr 22, 2016 |
Can i have your number pls... so we can discuss further...thanks |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 8:35pm On Apr 22, 2016 |
mrayosexy: Yes sir... Here is my number :08169492682 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by udy4real(m): 7:53pm On Apr 29, 2016 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 11:19pm On Apr 29, 2016 |
udy4real: Yes sir |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 12:35pm On May 01, 2016 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 12:43pm On May 01, 2016 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:16pm On May 01, 2016 |
Here is the third stage of the work : this stage involve the following activities 1. formwork to first floor beam and slab (decking) 2. first floor slab reinforcement details 3. electrical conduit pipes 4. waste pipe conduit work 5. casting of first floor slab work DECKING WORK DURATION: 14 days 4/22/16 TO 5/5/16 1 Like |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:27pm On May 01, 2016 |
a mistake 1 Like |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:28pm On May 01, 2016 |
ok |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Memejem: 1:43pm On May 01, 2016 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 1:54pm On May 01, 2016 |
Memejem: it was a mistake.. the decking is for another work. i will remove them now |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by smiley001(m): 2:09pm On May 01, 2016 |
abdulwastecx:I suspected as much, I knew it was for another thread. |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by einsteino(m): 8:52am On May 08, 2016 |
podosci: Please is the link ready? I have a hard copy of the book but i desperately need the soft copy too. |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by podosci(m): 9:55am On May 08, 2016 |
einsteino:Send me a mail, i would find a way to send it via dropbox or onedrive |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by vkon2(m): 5:13pm On May 09, 2016 |
NICE WORK Sir, pls I will watsap you |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by chubbyG(m): 10:59pm On Jun 08, 2016 |
abdulwastecx: Rabiu?? |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Larwin(m): 10:12am On Jun 18, 2016 |
Seriously have learnt a lot. I am a geoscientist, in case you need a borehole drilling for your sites try and get in touch. 08060288869 |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 10:23am On Jun 18, 2016 |
Larwin: Ok I will add you up |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Larwin(m): 11:19am On Jun 18, 2016 |
abdulwastecx:Ailt, will be expecting. |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Coolgent(m): 11:50am On Jun 18, 2016 |
abdulwastecx:Sir is dpc most on rocky site like this? 1 Like
|
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 8:06pm On Jun 18, 2016 |
Coolgent: It is nice you do it 1 Like |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Coolgent(m): 11:27pm On Jun 18, 2016 |
abdulwastecx:Ok thank u sir |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Juokorow(m): 3:45pm On Jun 29, 2016 |
abdulwastecx: As you may tell, I am going through this entire thread once more (now that I'm better introduced to Naija building basics), picking gem nuggets from your exceptional knowledge and experience. Why is it that: 1. DPM sheets are not joined with a special masking tape on most projects, and 2. DPM is not used for footings ....... as per recommended best practice in USA? Thanks! |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 5:16pm On Jun 29, 2016 |
Juokorow: Qtn 1: we normally join our DPM with the nail because masking tape can't really join wet polythene. But it will be a good ideas to use masking tape for subsequent job. Qtn 2 : footings are funded on blinding of 75mm and cover of 50mm, these elements help to protect the footings reinforcement and rendered the need for DPM useless, except for areas with relative high water table |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 2:35pm On Jul 29, 2016 |
abdulwastecx:Nice thread, great job. Please, what's the meaning of that thing written on the wall with red paint? 1 Like |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 2:56pm On Jul 29, 2016 |
laideh: Stop work |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 3:00pm On Jul 29, 2016 |
abdulwastecx:Why? |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 3:07pm On Jul 29, 2016 |
abdulwastecx:Please, why? |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by abdulwastecx(m): 3:29pm On Jul 29, 2016 |
laideh: It is the work of developmental control... The building wasn't approved before we start the work |
Re: Construction Of A Low Cost Three Bedroom bungalow In Suleja by Nobody: 4:40pm On Jul 29, 2016 |
abdulwastecx: So, what to do next? |
(1) (2) (3) (4) (5) (6) (Reply)
We Design All Sort Of Quality P.o.p Ceiling, Check In Here For Sample Pictures / Dubai's 1,100ft Marina Torch Tower Full Of Expats Bursts Into Flame(Photos) / Quit Notice To A Tenant
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |