Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg (1999 Views)

Sanwo-Olu: Imota Rice Mill To Start Production First Quarter Next Year / Hadi Sirika: Nigeria To Start Production Of Airplanes Before 2023 / Nigeria Steel Factory Back To Life After 40 Years - Aljazeera (Pics + video) (2) (3) (4)

(1) (Reply) (Go Down)

Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by deji17: 5:30pm On May 24, 2018
Ajaokuta Steel Factory Gears Up to Start Production. After 40 Years


Nigeria’s Ajaokuta complex was built with Soviet aid. Now the government says it’s finally serious about opening it.
By David Malingha Doya

May 23, 2018

The dilapidated Ajaokuta Steel complex. Photographer: David Malingha Doya/Bloomberg
On a hot April morning, workers are furiously cleaning a decorative fountain in front of the executive office of Nigeria’s largest steel complex. An onsite power plant is being repaired by electricians. Others around the 39-year-old facility are clearing brush. In the middle of it all, administrator Abdul-Akaba Sumaila is meeting in turn with the 20 or so people crowding his waiting room, a mix of union officials, local politicians and job applicants.

When one young man pulls a filled-out form from a wrinkled envelope, Sumaila asks him about his background, pats his back and encourages him to stay positive. Soon, he says, Ajaokuta Steel will start hiring. After that, it may actually make some steel.

The dilapidated factory complex has never managed to produce a single bar, coil or rod. Built with Soviet assistance, the sprawling facility has sucked up $8 billion in public investment and been hamstrung by repeated stops and starts, ownership changes, poor governance and sheer incompetence. It’s a tortured history that mirrors Nigeria’s broader attempts to develop a sustainable economic base beyond fossil fuels.


President Muhammadu Buhari has put a high priority on getting the plant into production, hopefully by selling it to private investors. But the legal, technical and political problems illustrate in microcosm—albeit a three-square-mile microcosm—many of the challenges that bedevil Nigeria’s diversification drive.

Sumaila, a mechanical engineer who’s taken a three-year leave of absence from Royal Dutch Shell Plc to try to revive Ajaokuta, is undeterred. “What excites me is the enormous potential of this place,” he said in his office at the plant. “Whatever we need to do, we have to do it.”

The economic imperatives are clear. Nigeria depends on crude for 90 percent of its export earnings. With global oil prices significantly below their past highs of more than $100 a barrel, shortages of foreign exchange are a daily reality. And Nigeria, Africa’s largest oil producer, has little domestic capacity to refine gasoline and thus must pay to re-import its own oil. The consequent lack of foreign currency has driven up prices for everything from food to construction materials, further hobbling an economy that shrank by 1.6 percent in 2016.

Today much of the facility beyond the central administration block resembles the set for a post-apocalyptic action film

The need for diversification, and the employment it could provide, is made more urgent by a surging population. With about 200 million people and growing rapidly, Nigeria is by far the most populous country in Africa. Without durable sources of employment, a nation that’s spent much of the past decade fighting insurgencies in its arid north could descend further into disorder.

Yet the record of privatization in Nigeria is decidedly mixed. In the cement industry, it was largely a success: Investors succeeded in reviving production, making the country a net exporter of the material. One of the early buyers, Aliko Dangote, is now Africa’s richest man. By contrast, efforts to sell off power plants have failed to end blackouts, still a daily occurrence in much of Nigeria.

Steel has long been an obvious target. Nigeria has vast deposits of iron ore, much of it in Kogi State, the same region where Ajaokuta is located. Transformed into steel, the ore could make other domestic industries, such as construction, far more viable.

Those intentions underpinned the construction of Ajaokuta, which when it began in 1979 was envisioned at Pharaonic scale. At full capacity, it was intended to produce as much as 3 million metric tons of steel annually, enough to largely close the gap between Nigeria’s current steel consumption and domestic output. Yet the most critical piece of infrastructure, a rail line that would connect the plant to iron-ore mines and deliver the finished product, was never completed.

Today much of the facility beyond the central administration block resembles the set for a post-apocalyptic action film. The blast furnace, conveyor belts and giant cranes to move materials—many inscribed with the words “Made in USSR”—stand idle in scrubby fields. Pipes as wide as manhole covers are coated in creeping grass, and cattle graze in clearings meant to store coal for the furnace.


‘Made in USSR’ adorns a rusty crane at the Ajaokuta Steel complex.Photographer: David Malingha Doya/Bloomberg
Of the 10,000 houses envisioned for workers, the 4,000 that were completed are occupied mostly by retirees. The current workforce of about 1,500 civil servants is tasked primarily with keeping parts of the plant in serviceable condition. The combined 120 kilometers (75 miles) of internal roads and railroads, as well as the school, the library, and the hospital for workers and their families, are largely unused. The runway of an airstrip built to serve the area needs to be resurfaced.

Nigeria’s government says it’s serious about transforming Ajaokuta from an embarrassment into a viable asset. The plant’s biggest booster is Kayode Fayemi, the mines and steel development minister. While Fayemi concedes, with significant understatement, that the first 30-plus years of Ajaokuta “didn’t quite work out as planned, which is the Nigerian story sometimes,” he said fixing it is now a national priority.

“Ajaokuta is central to our diversification strategy,” he said in his office in Abuja. Building up domestic steelmaking, he said, is “the least we could do for ourselves as a country and for our manufacturing sector.”

“This is an alternative to oil”

Work has begun on the long-awaited rail spur line, which may accept test trains as soon as August. The government also will need to decide who should own and operate the plant. Ajaokuta is currently controlled by the state after a previous private-sector operator, Global Steel Holdings Ltd., had its concession terminated.


While the government has said it plans to solicit bids for Ajaokuta from new investors, a group of lawmakers, with some union support, is pushing to keep the plant under public ownership. They argue that only paltry offers are likely for a facility that still requires huge investment. Senate Majority Leader Ahmad Lawan proposed legislation to that effect in the upper house on May 8, against the government’s wishes.

Fayemi says he’s convinced that Nigeria can no longer afford not to process its own resources. “The idea that we must be taking our iron ore out, our gold out, every raw material, for others to add value, and then send back to us to pay probably 10 times what it’s worth when we send them out is unthinkable,” he said.

He won’t be around to see if that pans out. He said May 14 that he will leave at the end of the month to run for governor in his home state of Ekiti. And Sumaila, the Ajaokuta administrator, said he doesn’t know whether he will return to Shell or not when his term at Ajaokuta ends in October 2020.




Wearing moccasins, a black short-sleeved and collarless suit, with a pen in hand, Sumaila says he remains optimistic as he walks around his spacious office.

“This is an alternative to oil,” he said. “The complex can be up and running two years after the government makes the strategic decision on the direction it wants to take.”

— With assistance by Samuel Dodge

https://www.bloomberg.com/news/articles/2018-05-24/a-steel-factory-gears-up-to-start-production-after-40-years

3 Likes 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by OfficialRasheed: 5:38pm On May 24, 2018
Ajaokuta is decades away from production.

Only a Yoruba muslim will belive this rubbish headline. Nothing in the article even suggests anything serious

7 Likes 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by deji17: 5:47pm On May 24, 2018
OfficialRasheed:
Ajaokuta is decades away from production.

Only a Yoruba muslim will belive this rubbish headline. Nothing in the article even suggests anything serious

Yoruba Muslim? How is this news related to that? When production starts as being envisaged, guys like you will be the first to apply for jobs there.

6 Likes 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by donk552(m): 6:02pm On May 24, 2018
Another lie to deceive Nigeria, i visit that factory today morning and i can nothing comingup

4 Likes

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by OfficialRasheed: 6:02pm On May 24, 2018
deji17:


Yoruba Muslim? How is this news related to that? When production starts as being envisaged, guys like you will be the first to apply for jobs there.
When? Can you give me a date
Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Fesomu(m): 6:10pm On May 24, 2018
Nobody can take away Buhari except God

2 Likes

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by deji17: 6:15pm On May 24, 2018
OfficialRasheed:

When? Can you give me a date

The answer is in the article..

Work has begun on the long-awaited rail spur line, which may accept test trains as soon as August. The government also will need to decide who should own and operate the plant. Ajaokuta is currently controlled by the state after a previous private-sector operator, Global Steel Holdings Ltd., had its concession terminated.


“This is an alternative to oil,” Sumaila said. “The complex can be up and running two years after the government makes the strategic decision on the direction it wants to take.”

1 Like 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by OfficialRasheed: 6:20pm On May 24, 2018
deji17:


The answer is in the article..

Work has begun on the long-awaited rail spur line, which may accept test trains as soon as August. The government also will need to decide who should own and operate the plant. Ajaokuta is currently controlled by the state after a previous private-sector operator, Global Steel Holdings Ltd., had its concession terminated.


“This is an alternative to oil,” Sumaila said. “The complex can be up and running two years after the government makes the strategic decision on the direction it wants to take.”
All this long story for a simple question. I ask again, when WILL production start?

3 Likes

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by docadams: 6:26pm On May 24, 2018
OfficialRasheed:
All this long story for a simple question. I ask again, when WILL production start?

What relationship does light has with darkness. What does an unpatriotic bigot has to do with progressive development. Move along now. I will pm you when bad news surfaces

6 Likes 2 Shares

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Paperwhite(m): 6:31pm On May 24, 2018
Another propaganda stunt just like the failed Ogoni Cleanup.Ajaokuta just reflect the rot that is in NNPC, NLNG,CBN & the Nigerian state as a whole.

3 Likes

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Yoruba4Life: 6:35pm On May 24, 2018
Made in U.S.S.R? Wtf?

Just dismantle the whole thing and rebuild from scratch, abeg!
Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Okoroawusa: 7:06pm On May 24, 2018
OfficialRasheed:
Ajaokuta is decades away from production.

Only a Yoruba muslim will belive this rubbish headline. Nothing in the article even suggests anything serious
Yoruba Muslim?


You r suffering from inferiority complex

3 Likes 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Okoroawusa: 7:09pm On May 24, 2018
OfficialRasheed:
When? Can you give me a date
If PDP has done something since 1999 then your question who ve an answer

1 Like 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Printerscanner: 8:49pm On May 24, 2018
OfficialRasheed:
Ajaokuta is decades away from production.

Only a Yoruba muslim will belive this rubbish headline. Nothing in the article even suggests anything serious

Yes, only a Yoruba Muslim will use over 3,000,000 Biafran pigs and goats for pepper soup and suya between 1967 and 1970 and also use millions of Biafran women and ladies as sex slaves withing the same period. I am a proud Yoruba Muslim.

3 Likes 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Mikeross62: 8:58pm On May 24, 2018
We hear this every year,billion budgeted for this project,but no result or any achievement.
Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by abokibuhari: 9:01pm On May 24, 2018
Paperwhite:
Another propaganda stunt just like the failed Ogoni Cleanup.Ajaokuta just reflect the rot that is in NNPC, NLNG,CBN & the Nigerian state as a whole.
Tell that deji17 nazo them flaunt ogonni clean up, till date has anything been done?
Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by buhariguy(m): 9:02pm On May 24, 2018
Wow

1 Like

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by deji17: 9:20pm On May 24, 2018
abokibuhari:

Tell that deji17 nazo them flaunt ogonni clean up, till date has anything been done?

I hope you have the data to watch this video. It shows progress been made on the clean up. This is a Govt that keeps its promise. No gimmick. What you see is what you get.


https://www.youtube.com/watch?v=3azn4fyCWTU&list=PLzGHKb8i9vTwf4VKQg3bU9iOBjuzqpdz_&index=1[s][/s]
Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by deji17: 9:22pm On May 24, 2018
Okoroawusa:

Yoruba Muslim?


You r suffering from inferiority complex

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Omobada(m): 9:50pm On May 24, 2018
donk552:
Another lie to deceive Nigeria, i visit that factory today morning and i can nothing comingup

Your inability to construct a simple sentence says it all

1 Like 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Printerscanner: 8:12am On May 25, 2018
deji17:


Yoruba Muslim? How is this news related to that? When production starts as being envisaged, guys like you will be the first to apply for jobs there.

No, guys like him cannot apply for jobs there because they are school dropouts and street miscreants, so they will only go there to collect street touts levies a.k.a owo omo onile.

1 Like 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by Printerscanner: 8:19am On May 25, 2018
deji17:


I hope you have the data to watch this video. It shows progress been made on the clean up. This is a Govt that keeps its promise. No gimmick. What you see is what you get.


https://www.youtube.com/watch?v=3azn4fyCWTU&list=PLzGHKb8i9vTwf4VKQg3bU9iOBjuzqpdz_&index=1[s][/s]

If their lord and saviour Goatluck Jonaddaft did not clean their oil polluted land for the 6 years that he was there stealing and looting their oyel money, then they would be very very silly and mad to think that their most hated enemies Buhari/Osinbajo will clean the land your street miscreants polluted.

1 Like

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by anibirelawal(m): 10:35am On May 25, 2018
God bless the only vissionary President we ever had in this country.



By the year 2020, the factory will commence its activities in full capacity. And there will be a lot of jobs for the youths.


PMB, please carry go till 2023.

1 Like 1 Share

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by johnmartus(m): 10:42am On May 25, 2018
embarassed can you sue with the name of Ogun you visited the company?
donk552:
Another lie to deceive Nigeria, i visit that factory today morning and i can nothing comingup

1 Like

Re: Ajaokuta Steel Factory Gears Up To Start Production. After 40 Years - Bloomberg by fabianjay101(m): 12:31pm On May 25, 2018
same old story with a different format later they will blame GEJ for the delay in production.

(1) (Reply)

FG Was Fully Involed In Nnamdi Kanu Whereabouts All The While / Davido & Flavour Perform At PDP Rally In Enugu As Ekweremadu & Ugwuanyi Watch(pi / All You Need To Know About Col. Onyema Nwachukwu, New Defence Spokesperson

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 52
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.