GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts (1260 Views)

Reno Posts Pictures Of Schools Initiated And Completed By Tinubu / Projects Initiated And Completed By The Buhari Led Government. / 10 Things Buhari Initiated And Completed (2) (3) (4)

(1) (2) (Reply) (Go Down)

GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:33pm On Aug 01, 2018
Jonathan initiated and built 3 times more power plants than all previous administrations combined ...Jonathan did not know how to sell his story to Nigerians hence he allowed the lies of the opposition triumph

1 Like

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:34pm On Aug 01, 2018
The Minister of Transportation, Rotimi Amaechi, on Tuesday commended the immediate past administration of ex-President, Goodluck Jonathan for embarking on massive projects that have been beneficial to Nigerians.
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:34pm On Aug 01, 2018
Speaking at a Town Hall meeting in Abuja, the former Rivers State governor said his Ministry did not meet any comatose project on assumption of office.
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:35pm On Aug 01, 2018
Amaechi noted that the Kaduna-Abuja railway was nearly 80% completed by the Jonathan’s administration.
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:36pm On Aug 01, 2018
He said, “In the ministry of transportation, we did not meet anything comatose. We met an attempt to bring back our rail services.
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:36pm On Aug 01, 2018
The Kaduna-Abuja railway was nearly 80% completed which we commissioned and commercial services have commenced.’’


Source
http://dailypost.ng/2017/05/16/amaechi-hails-goodluck-jonathan-says-met-80-project-completed-ex-president/amp/
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 5:38pm On Aug 01, 2018
Is amaechi planning to defect?
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 5:50pm On Aug 01, 2018
Name capacity Date
Aba power station 140 MW 2012

Afam 6 Power plant 624 MW 2012

Alaoji Power station 1074 MWs 2012

Calabar Power Station 561 Mws 2014


Egbema Power Station 338 Mws 2012

Geregu Phase 2 434 MWs 2012

Ibom PS 190 Mws 2009

Ihovbor PS 450 Mws 2012

Olorunsogo phase 2 675 Mws 2012


Omoku Phase 2 225 MWs 2012


omotosho phse 2 450 Mws 2012

Sapele 2 Power S 450 Mws 2012

Ibom Power plant 2 191 Mws 2010

Azura Thermal 1500 obj/Gej

Zamfara Power Station 100 mw 2012

3 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 6:48pm On Aug 01, 2018
FarahAideed:
Name capacity Date
Aba power station 140 MW 2012

Afam 6 Power plant 624 MW 2012

Alaoji Power station 1074 MWs 2012

Calabar Power Station 561 Mws 2014


Egbema Power Station 338 Mws 2012

Geregu Phase 2 434 MWs 2012

Ibom PS 190 Mws 2009

Ihovbor PS 450 Mws 2012

Olorunsogo phase 2 675 Mws 2012


Omoku Phase 2 225 MWs 2012


omotosho phse 2 450 Mws 2012

Sapele 2 Power S 450 Mws 2012

Ibom Power plant 2 191 Mws 2010

Azura Thermal 1500 obj/Gej

Zamfara Power Station 100 mw 2012
Thanks

4 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 6:56pm On Aug 01, 2018
[s]
FarahAideed:
Name capacity Date
Aba power station 140 MW 2012

Afam 6 Power plant 624 MW 2012

Alaoji Power station 1074 MWs 2012

Calabar Power Station 561 Mws 2014


Egbema Power Station 338 Mws 2012

Geregu Phase 2 434 MWs 2012

Ibom PS 190 Mws 2009

Ihovbor PS 450 Mws 2012

Olorunsogo phase 2 675 Mws 2012


Omoku Phase 2 225 MWs 2012


omotosho phse 2 450 Mws 2012

Sapele 2 Power S 450 Mws 2012

Ibom Power plant 2 191 Mws 2010

Azura Thermal 1500 obj/Gej

Zamfara Power Station 100 mw 2012
[/s]



Nearly all OBJ's projects.


Ignorant Igbos..

2 Likes 1 Share

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 6:58pm On Aug 01, 2018
GEJ a Colossus.

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 6:59pm On Aug 01, 2018
deomelo:
[s][/s]



Nearly all OBJ's projects.


Ignorant Igbos..

Which Obj? Show us the one Buhari has completed

3 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 7:02pm On Aug 01, 2018
GEJ the compassionate

3 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by meccuno: 7:06pm On Aug 01, 2018
FarahAideed:


Which Obj? Show us the one Buhari has completed
That dude is sick.please avoid him.

4 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 7:07pm On Aug 01, 2018
GEJ the man of peace

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 7:16pm On Aug 01, 2018
[s]
FarahAideed:


Which Obj? Show us the one Buhari has completed
[/s]



For now, we are talking about the OP and the typical ipob lies and ignorance.

Stealing is not corruption jona completed obj's projects and if you think otherwise, show us where and when he admitted the contracts or keep quiet.

2 Likes 1 Share

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 7:20pm On Aug 01, 2018
FarahAideed:
Name capacity Date
Aba power station 140 MW 2012

Afam 6 Power plant 624 MW 2012

Alaoji Power station 1074 MWs 2012

Calabar Power Station 561 Mws 2014


Egbema Power Station 338 Mws 2012

Geregu Phase 2 434 MWs 2012

Ibom PS 190 Mws 2009

Ihovbor PS 450 Mws 2012

Olorunsogo phase 2 675 Mws 2012


Omoku Phase 2 225 MWs 2012


omotosho phse 2 450 Mws 2012

Sapele 2 Power S 450 Mws 2012

Ibom Power plant 2 191 Mws 2010

Azura Thermal 1500 obj/Gej

Zamfara Power Station 100 mw 2012

You mean to tell us that in the year 2012 alone Jonathan completed 12 power stations and added over 5000Mws of electricity, and over 7000Mws if we add all the power you stated up there as attributed to Jonathan. Since our total installed capacity as of 2015 when Jonathan was leaving was just under 7500MWs, it meant that we were all living in darkness before Jonathan took over in 2010.
You lies make lai Muhammed look like kindergarten.

4 Likes 1 Share

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 7:21pm On Aug 01, 2018
deomelo:
[s][/s]



For now, we are talking about the OP and the typical ipob lies and ignorance.

Stealing is not corruption jona completed obj's projects and if you think otherwise, show us where and when he admitted the contracts or keep quiet.

Was OBJ even President in any of the dates there ? If you want power plants OBJ initiated and finished why don't you ask ? Every power plant in this list was finished by GEJ

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 7:22pm On Aug 01, 2018
wirinet:


You mean to tell us that in the year 2012 alone Jonathan completed 12 power stations and added over 5000Mws of electricity, and over 7000Mws if we add all the power you stated up there as attributed to Jonathan. Since our total installed capacity as of 2015 when Jonathan was leaving was just under 7500MWs, it meant that we were all living in darkness before Jonathan took over in 2010.
You lies make lai Muhammed look like kindergarten.

Was it your father that completed them ?

3 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 7:27pm On Aug 01, 2018
FarahAideed:


Was it your father that completed them ?

Your father was using candles for light and gramophone for radio before 2010 when Jonathan took power.

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 7:29pm On Aug 01, 2018
wirinet:


Your father was using candles for light and gramophone for radio before 2010 when Jonathan took power.

My father and uncle were once governors in Nigeria...yes they were ..what did ya papa do?

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by ivandragon: 7:30pm On Aug 01, 2018
as much as gej falls short of what it means to provide good administrative governance, he is heads & shoulders above the what we have today.

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 7:33pm On Aug 01, 2018
ivandragon:
as much as gej falls short of what it means to provide good administrative governance, he is heads & shoulders above the what we have today.
GEJ represented light...
Buhari is complete darkness

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by mpianya39(m): 7:34pm On Aug 01, 2018
deomelo:
[s][/s]



Nearly all OBJ's projects.


Ignorant Igbos..

Kemi Oluwole younger brother grin grin

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 7:39pm On Aug 01, 2018
FarahAideed:


Was OBJ even President in any of the dates there ? If you want power plants OBJ initiated and finished why don't you ask ? Every power plant in this list was finished by GEJ



Ok, please list the power plants OBJ initiated and also the ones initiated by GEJ as asserted by the OP.


Thanks in advance.
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 7:41pm On Aug 01, 2018
FarahAideed:


Was it your father that completed them ?

Now, let me give you one challenge, name one power station that your messiah completed and fully operational before he left office.

1 Like

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by FarahAideed: 7:42pm On Aug 01, 2018
wirinet:


Now, let me give you one challenge, name one power station that your messiah completed and fully operational before he left office.

Every single one there sir !!!

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by wirinet(m): 7:43pm On Aug 01, 2018
Kewtt:

GEJ represented light...
Buhari is complete darkness

Yes GEJ represented the light of stealing, not corruption.

2 Likes

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 7:46pm On Aug 01, 2018
wirinet:


You mean to tell us that in the year 2012 alone Jonathan completed 12 power stations and added over 5000Mws of electricity, and over 7000Mws if we add all the power you stated up there as attributed to Jonathan. Since our total installed capacity as of 2015 when Jonathan was leaving was just under 7500MWs, it meant that we were all living in darkness before Jonathan took over in 2010.
You lies make lai Muhammed look like kindergarten.




These ignorant and unintelligent Igbos are not smart liars and their village square education didn't do them any good
Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by Kewtt: 7:46pm On Aug 01, 2018
wirinet:


Yes GEJ represented the light of stealing, not corruption.
Hahaha ekuke mastiff no time for you.

1 Like

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 7:51pm On Aug 01, 2018



[img]https://powersectornigeria.files./2012/09/obasanjo-at-75-300x221.jpg[/img]


The National Integrated Power Project (NIPP) was conceived by the former President Olusegun Obasanjo administration in the year 2004
as a fast-track approach to solving the country’s power challenges. Although the project has gulped about $8 billion thus far, EMMA OKEREH, Abuja, BEN NDUBUWA, Lagos, ANAYO ONUKWUGHA, Port-Harcourt and KOLA-NIYI EKE, Asaba report that Nigerians would have to wait much longer than anticipated to get the dividends accruable from the NIPP.

When first mooted, the National Integrated Power Project (NIPP) was designed around seven medium-size gas fired power stations in the gas producing states. But today, the project has four other power plants, making a total of 11. These are Calabar – 5 X 161 megawatts (MW); Egbema – 3 X 138MW; Ihovbor – 4 X 150MW; Gbarain – 2X 125MW; Sapele – 4 X 150MW; Omoku – 2 X 150MW; Alaoji – 10 X 1074MW; Olorunsogo I and II -7 x 150MW; Omotosho I and II – 5 x 100MW; Geregu II – 4 x 134MW; and the Ibom Power – 1 x 90MW.


https://powersectornigeria./2012/09/24/nigeria-national-integrated-power-project-a-dream-deferred-2/



This is what the lying and ignorant OP copied and pasted.

According to the ignorant and fraudulent OP, stealing is not corruption Jona traveled back in time to 2004 to initiate the same projects OBJ initiated and spent $16 billion to actualize..


Igbos are just silly and dumb liars.

1 Like

Re: GEJ Initiated And Built 3 Times More Power Plants Than All Previous Govts by deomelo: 7:53pm On Aug 01, 2018
PMB's $5 billion 3050MW Mambila will generate more MWs than the rubbish the PDP looters gave us in return for $20 billion.



God Bless PMB.

1 Like

(1) (2) (Reply)

Caption This Photo Starring: PMB, OSINBAJO And Many More / Will You Support PDP To Come Back In 2019? / Buhari, Okorocha Meet In Aso Rock

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.