Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,156,409 members, 7,830,054 topics. Date: Thursday, 16 May 2024 at 03:38 PM |
Nairaland Forum / Nairaland / General / Politics / Facts About The Second Niger Bridge (306 Views)
My Visit To Second Niger Bridge Site Onitsha Anambra State-photos / Lauretta Onochie Shares Aerial View Pictures Of Second Niger Bridge. (pictures) / Fashola Arrives Onitsha, Inspects Work On Second Niger Bridge- Photos (2) (3) (4)
(1) (Reply)
Facts About The Second Niger Bridge by Mrlola: 11:22am On May 03, 2021 |
Doyin Okupe, a former aide to ex-President Goodluck Jonathan, has made what he called 15 revelations about the Second Niger Bridge. In a message he entitled “GEJ, Buhari & The People,” Okupe wrote: [1] The Bridge is NOT Being Constructed by the FGN. [2] It’s a PPP Project which the FGN contributes a tiny fraction. [3] The 2nd Niger Bridge Will Cost about N117 billion. [4] Started in 2013 and should have been completed in 2017, but worked stopped for 31 months. Completion date Not certain now. [5] FGN share of the Cost is N30billion. Jonathan through the Sure-P paid N21.2billion (71%) including N7billion for the completion of preparatory work (Phase 1). [6] 38% of the work has been done as at Jan 2015. [7] The N140b Oshiomhole said was wasted on Admin cost on the bridge was a lie, as admin cost can not be higher than the cost of the whole project. [8] Buhari’s Govt Paid *N2billion* NOT $2billion as Osinbajo said during the Anambra State election. They will be paying another N3.05b when the budget is approved. [9] Work has restarted in earnest at the site and about 5%-7% has been completed bringing the total completed work to about 43% to 45% according to an engineer I spoke to. [10] All the pictures flying all over the internet are pictures of work-in-progress made during the 1st quarter of 2015. [11] In summary, Jonathan govt paid 71% of FGN share of the cost, while Buhari’s govt has paid 6.1%. [12] Julius Berger, the Major Contractor and Construction company will put Toll Gate on Completion of the Bridge to recover their cost. [13] The Construction Company is Funding the Project and the People using the Bridge will bear the cost via Toll Charges. [14] The real People building the Bridge are Nigerians that will use the Bridge, as they will REPAY the cost to Julius Berger. [15] For those celebrating politicians and sharing old or fake pictures of 2nd Niger Bridge, the #Facts are Not on your side. http://dailypost.ng/2018/04/14/doyin-okupe-makes-15-shocking-revelations-second-niger-bridge/amp/ |
Re: Facts About The Second Niger Bridge by kettykin: 11:46am On May 03, 2021 |
Is the bridge still neccessary seeing the direction Nigeria is moving |
(1) (Reply)
Kaduna: An Open Letter To El-rufai Over The Ongoing Protest In The State / The Silent Existential Question. / Why Do Nigerians Insult And Disrespect And Cast Blame On All Their Presidents?
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 9 |