Re: Construction Of A 10 Story Office Building by kez007: 7:52pm On Dec 08, 2011 |
Slab for 2 story portion has been poured and covered with a curing blanket.
|
Re: Construction Of A 10 Story Office Building by kez007: 4:19pm On Dec 09, 2011 |
Excavation for the largest pile cap is in progress. So as you can see, the piles are drilled from grade, and then they are uncovered up to the depth of the pile cap. The most labor intensive part of this installation is chipping the piles down to the bottom of the cap. See pictures.
|
Re: Construction Of A 10 Story Office Building by kez007: 10:13pm On Dec 11, 2011 |
Formwork for shear walls have arrived on site. |
Re: Construction Of A 10 Story Office Building by kez007: 4:56pm On Dec 12, 2011 |
Excavation to uncover piles in progress.
|
Re: Construction Of A 10 Story Office Building by kez007: 3:27pm On Dec 13, 2011 |
We have uncovered all the piles that support one set of elevators. The next step is to chip the piles down to the bottom, then reinforcing steel will be installed for this huge cap.
|
Re: Construction Of A 10 Story Office Building by kez007: 5:37pm On Dec 15, 2011 |
Installation of structural steel at the 2-story portion of the project has started. This process should last for two weeks pending weather conditions. The picture shows the steel members on the ground and the small crane used for installation. Some of the steel members are already standing on the slab.
|
Re: Construction Of A 10 Story Office Building by kez007: 5:38pm On Dec 15, 2011 |
Another view
|
Re: Construction Of A 10 Story Office Building by kez007: 4:31pm On Dec 16, 2011 |
Piles have been chipped down completely. It is now ready for reinforcing steel and formwork. Pictures to come ,
|
Re: Construction Of A 10 Story Office Building by Pennywise(m): 4:35pm On Dec 16, 2011 |
Whaooo. These guys make construction appear so easy |
Re: Construction Of A 10 Story Office Building by kez007: 5:10pm On Dec 19, 2011 |
Reinfocing steel has been installed , nice work
|
Re: Construction Of A 10 Story Office Building by kez007: 8:37pm On Dec 21, 2011 |
Installation of structural steel at 2 story area.
|
Re: Construction Of A 10 Story Office Building by hbrednic: 11:41pm On Dec 21, 2011 |
welldone, very nice job |
Re: Construction Of A 10 Story Office Building by kez007: 5:03pm On Dec 22, 2011 |
hbrednic:Thank you by brother, i appreciate all the words of encouragement. |
Re: Construction Of A 10 Story Office Building by kez007: 11:21pm On Jan 03, 2012 |
large concrete cap has finally been poured,
|
Re: Construction Of A 10 Story Office Building by kez007: 5:30pm On Jan 05, 2012 |
The concrete walls for the elevators and the stairs will be constructed first before the installation of steel for the 10 story building begins. steel installation at the 2 story section is still in progress. Pictures coming soon! |
Re: Construction Of A 10 Story Office Building by kez007: 5:19pm On Jan 06, 2012 |
Steel installation at the 2 story section is making progress as you can see in the pictures,
|
Re: Construction Of A 10 Story Office Building by kez007: 10:57pm On Jan 09, 2012 |
Now the real fun begins, Formwork for one of the elevator towers is going up, There are 2 elevator towers and one stairwell tower.
|
Re: Construction Of A 10 Story Office Building by kez007: 10:24pm On Jan 10, 2012 |
Aerial view. Of the work in place so far.
|
Re: Construction Of A 10 Story Office Building by kez007: 5:35pm On Jan 11, 2012 |
The elevator towers are constructed first and then the structural steel follows. The towers shoould be completed within 14 weeks. |
Re: Construction Of A 10 Story Office Building by kez007: 9:43pm On Jan 16, 2012 |
Lost a day of work due to weather. Not encouraging!! |
Re: Construction Of A 10 Story Office Building by kez007: 11:39pm On Jan 25, 2012 |
Structural steel and decking is complete for the 2 story portion
|
Re: Construction Of A 10 Story Office Building by kez007: 5:24pm On Jan 26, 2012 |
2nd floor deck reinforcing,
|
Re: Construction Of A 10 Story Office Building by kez007: 4:18pm On Jan 27, 2012 |
As you can see the first lift of the elevator tower has been poured and stripped. Moving on to the 2nd lift. Notice the three towers in the picture. They will all have to be completed before the structural steel begins.
|
Re: Construction Of A 10 Story Office Building by kez007: 8:35pm On Feb 01, 2012 |
The first lift of all shear wall shave been poured. Now forming the second lifts. |
Re: Construction Of A 10 Story Office Building by widesheds: 7:20pm On Feb 13, 2012 |
Wow!! That's a huge project you have at your hand and I must you have been progressing at a good pace. I would like to thank you for your regular posts and pics providing a very much detailed information about the construction. I'll be making a point to be closely following this from now on. There are a plenty of things that one cold come to terms with over here. Keep the good work going. |
Re: Construction Of A 10 Story Office Building by kez007: 6:44pm On Feb 15, 2012 |
Thanks for the compliments. The comments are encouraging. We have poured the second lift. pictures coming soon. |
Re: Construction Of A 10 Story Office Building by atasteve: 11:12am On Feb 16, 2012 |
Lord Kez007, first of all WELL DONE and GOOD JOB. This construction is organised and the way you use pix to explain the progress makes the building very easy but the fact is that so much of labour and brain work have gone into it! Please keep teaching us o. |
Re: Construction Of A 10 Story Office Building by kez007: 10:25pm On Feb 16, 2012 |
@atasteve, You are very correct. Good planning is key to successful execution. We should always measure ten times and cut once, instead of measuring once and cutting 10 times. thanks for the encouraging words. 1 Like |
Re: Construction Of A 10 Story Office Building by kez007: 6:44pm On Feb 17, 2012 |
@ story addition is making progress. All slabs have been poured and we are noew starting the exterior framing.
|
Re: Construction Of A 10 Story Office Building by spyder880(m): 6:54pm On Feb 17, 2012 |
Very nice works, keep up the good work. |
Re: Construction Of A 10 Story Office Building by Oluwa4Sure: 7:25pm On Feb 17, 2012 |
Bros You're Not Smilling. . . |
Re: Construction Of A 10 Story Office Building by stepo707: 3:31pm On Feb 21, 2012 |
This guys are really expert.Keep up the good work. |
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Fire Outbreak At Apongbon CMS, Lagos Island (Video, Pics) / 10 Risky Areas In Lekki/Ajah To Verify Before You Buy A Property / Lagos Begins Demolition Of Buildings In Ojodu-Berger (Photos)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 19 |