Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,205,003 members, 7,990,764 topics. Date: Friday, 01 November 2024 at 12:06 AM |
Nairaland Forum / Nairaland / General / Politics / 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After (30780 Views)
The 40MW Dadin Kowa Hydropower Project In Gombe (Photos) / Governor Inuwa Yahaya Inspecting 40MW Dadin Kowa Hydropower Project / See 40MW Kashimbila Hydro Power Dam In Taraba Delivered As Promised By Buhari (2) (3) (4)
(1) (2) (3) (4) (5) (Reply) (Go Down)
40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 1:20pm On Dec 28, 2019 |
The Dadin-Kowa Hydro-Power Plant in Gombe State, initiated in 1959 to generate 40 megawatts of electricity is now ready for inauguration after 60 years of execution setbacks. Those familiar with the project described it as “a success story” despite the long delay it suffered. People of Dadin-Kowa and adjoining communities said the power project will add impetus to the socio-economic development of the northern region and the country at large. Though the project was initiated a year before Nigeria’s independence, the contract for the dam project was not awarded until 1980, and the inauguration eight years later, in 1988, by then military president, General Ibrahim Badamasi Babangida. The reservoir has a capacity of 800 million cubic meters of water and a surface area of 300 square km. The dam has potential as a source of fish, but nothing serious was done on the electricity potential until recently. Governor Muhammadu Inuwa Yahaya of Gombe State with other officials of the plant at the control section of Dadin-Kowa Hydro- Power Plant While the dam was inaugurated nearly 40 years ago in 1988, work on the electricity component, designed to be producing 40 megawatts of electricity, has been going back and forth for 31 years after the dam components had been completed. The Dadin-Kowa Dam is located 5km north of Dadin- Kowa village and 37km from Gombe town, along Biu road. https://www.dailytrust.com.ng/60yrs-after-40mw-dadin-kowa-hydro-power-ready-for-inauguration.html 6 Likes 2 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 1:21pm On Dec 28, 2019 |
Imagine! Previous governments including OBJ and ATIKU who ate our $16b MEANT FOR POWER PROJECTS could not complete this project but it took Buhari such a short time to complete. Job well done Bubu 148 Likes 15 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by olumide3367(m): 1:36pm On Dec 28, 2019 |
Blindersoff:zombie sighted 90 Likes 18 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 1:39pm On Dec 28, 2019 |
olumide3367: Zombie wailer sighted 135 Likes 12 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by theenchanter: 1:42pm On Dec 28, 2019 |
More like a water project than power project, 40mw is just d added advantage. 8 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 1:50pm On Dec 28, 2019 |
theenchanter: You are very wrong. 40 Megawatts equates 40000000 (40 million watts) 40 million watts converts to about 2.3million volts which is enough to power over 2 million homes. It is not a water project with 40mw as added advantage but a source of power to over 2million homes. 147 Likes 11 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by seankafor(m): 1:54pm On Dec 28, 2019 |
Blindersoff:will it be channeled to the national grid or its solely for gombe people? 6 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 2:03pm On Dec 28, 2019 |
seankafor: That is for them to decide 27 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by theenchanter: 2:04pm On Dec 28, 2019 |
Blindersoff:40mw can't even power 100,000 homes. Electricity to household is calculated by kw/hr. If 40mw can power 2m homes, then our miserable 4000mw should be able to power the whole country, which u already know the answer to. As i said earlier, its more of a water or irrigation project rather than power, but the power is just an added advantage, but since most of nigerians are power-starved they think of power whenever the see any mw, even if the mw stands for "micro-wave" 152 Likes 13 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 2:06pm On Dec 28, 2019 |
theenchanter: smh it is clear you are confused and ignorant 38 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Blindersoff: 2:07pm On Dec 28, 2019 |
Bazamfare: I am igbo myself but i give credence to whomever it is due. Tribalism is something i abhor 47 Likes 5 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by theenchanter: 2:09pm On Dec 28, 2019 |
Blindersoff:how? U're more confused. Let me point ur error to u. How many kw/h do u think a household would consume per annum? Lets start from there. 26 Likes 2 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by theenchanter: 2:11pm On Dec 28, 2019 |
Blindersoff:lol, when he called me names, u didn't call anybody... i didn't name-call him and u're calling d mods. Such hypocrisy. 18 Likes 5 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by hisgrace090: 2:19pm On Dec 28, 2019 |
7 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Amstupid(m): 5:00pm On Dec 28, 2019 |
Still sad , not happy "I repeat " not ready ..... Its new year , its all vanity.,... Am moving ,, keep enjoying "work starting " ( Jan is here ) ..... No be madness dey worry me so |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Humphrizy(m): 5:00pm On Dec 28, 2019 |
Finally |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Sunofgod(m): 5:01pm On Dec 28, 2019 |
my gen is more powerful... 2 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Pidginwhisper: 5:01pm On Dec 28, 2019 |
40mw,60yrs. 800mw go take 48,000years 42 Likes 5 Shares
|
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by eedimo(m): 5:02pm On Dec 28, 2019 |
RUBBISH 1 Like |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Badmod: 5:03pm On Dec 28, 2019 |
Good job... Now the national grid is 3040. Buhari has really tried... He added 40 MW to the national grid. If we keep adding 40MW every 4 years. It will takes 300 million years to have sufficient Electricity... 31 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Nobody: 5:04pm On Dec 28, 2019 |
2 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Guestuser: 5:05pm On Dec 28, 2019 |
olumide3367:Asshole sighted 4 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by drezzyx(m): 5:06pm On Dec 28, 2019 |
All I know is by the year 2520 all of here would have become ancestors. 3 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Tunde901: 5:06pm On Dec 28, 2019 |
For real? 2 Likes 1 Share |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by 989900: 5:06pm On Dec 28, 2019 |
Good one . . . half bread is better than none. 40MW=40,000KW. Which should power between 13,000-40,000 homes depending on consumption (assuming each home uses between 1KW-3KW, which of course would be determined by if it's urban or rural, commercial or residential, what time of the day or night). Think of the power capacity like your "I pass my neighbor" = 1KW averagely, and your 2.5-3.5KW Elepaq or Sumec Firman generator, then do simple division. 34 Likes 3 Shares |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Adufeamos: 5:06pm On Dec 28, 2019 |
@ Blindersoff and the Theenchanter pls continue m enjoying u....Nd learning lol 2 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by arsenal33: 5:07pm On Dec 28, 2019 |
eedimo:bad spelling. |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by Born2Breed(f): 5:07pm On Dec 28, 2019 |
olumide3367: Nor mind the zombified mumu. For more than 40yrs the North were in power and could not complete this project that was awarded in 1980. One idiot is blaming OBJ. Was Shagari sleeping then or was Buhari only concerned about WAI or was IBB blind abi ? Were Abacha and Abdulsalam brain dead? These people stupidity is raised to power 10. 25 Likes |
Re: 40MW Dadin-Kowa Hydro-Power Ready For Inauguration, 60 Years After by MedicH: 5:07pm On Dec 28, 2019 |
Blindersoff: You have the patience necessary to teach stubborn children especially marlians mathematics. 16 Likes 1 Share |
2019 Elections: Atiku, Tinubu Have Abandoned Buhari - Sule Lamido / Police Parade 3 'IPOB' Suspects For Bombing Wike's Father's Church (Photos) / Senior Lawyers Condemn Buhari’s Open Display Of Ballot Paper
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29 |