Re: 75mw Solar Power Project To Be Ready 2017 by repogirl(f): 9:22am On Jul 09, 2016 |
lordkhalifa:No mind them..... they will bastardise everything eventually. Just dey look. |
Re: 75mw Solar Power Project To Be Ready 2017 by lafex: 9:27am On Jul 09, 2016 |
sekundosekundo:u knw that we r in Nigeria so anything can happen that's d meaning of 'if' |
Re: 75mw Solar Power Project To Be Ready 2017 by temptnow: 9:32am On Jul 09, 2016 |
fulanimafia:lake Chad or no lake Chad. We don't want you people to touch our oil again period. We pray it's true so that the caliphates will let our people go. |
Re: 75mw Solar Power Project To Be Ready 2017 by Clean2016: 9:35am On Jul 09, 2016 |
Godjone: GEJ handed 1,730MW, maybe he pocketed the remaining money for over 3,000 MW. u can easily check that online |
Re: 75mw Solar Power Project To Be Ready 2017 by deb(m): 9:37am On Jul 09, 2016 |
FakeNEWSevryday: If only we can recover all our stolen funds |
Re: 75mw Solar Power Project To Be Ready 2017 by Nobody: 9:37am On Jul 09, 2016 |
fulanimafia:that dangote gas plant will stabilize egbin power station. Lagos will be light years ahead. 1 Like 1 Share |
Re: 75mw Solar Power Project To Be Ready 2017 by mykelon: 9:45am On Jul 09, 2016 |
KingsCity:I don't know... I seriously don't understand. How is this that difficult? Is it that too hard to do this.... |
Re: 75mw Solar Power Project To Be Ready 2017 by truthspeaks: 9:46am On Jul 09, 2016 |
No prob wit buhari's presidency. No be 2019? But weda we r blowing our land into irrelevance is non of ur biz. U can go chew ur groundnut n start diversifyin frm thr. Infact pay ur salaries n build ur North East Development Commission frm thr. So far it's nt d same irrelevant ND oil is to be used. fulanimafia: |
Re: 75mw Solar Power Project To Be Ready 2017 by fulanimafia: 9:50am On Jul 09, 2016 |
Like you have a choice; you lazy lots should encourage your capable businessmen if any exists, to invest in the oil sector instead of crying like butthurt cry babies about being excluded and rendered irrelevant. Right now, the oil industry is dominated by northerners and s/westerners operationally (forget oil blocs) and that's not gonna change in the next ten years. Let that digest. temptnow: truthspeaks: 1 Like |
Re: 75mw Solar Power Project To Be Ready 2017 by dmoney4luv(m): 9:50am On Jul 09, 2016 |
[color=#990000][/color] [font=Lucida Sans Unicode][/font] Zubby56:[email] Zubby56:[/email] Zubby56:very Soon naija wil b beta again, mark my words |
Re: 75mw Solar Power Project To Be Ready 2017 by adewasco2k(m): 9:52am On Jul 09, 2016 |
My personal solar power at home is serving me well. I hope they get this one up as stipulated |
Re: 75mw Solar Power Project To Be Ready 2017 by xdos(m): 9:55am On Jul 09, 2016 |
And what happens during rainy reason when there is no sunlight? KingsCity: |
Re: 75mw Solar Power Project To Be Ready 2017 by sunnyside16(m): 9:56am On Jul 09, 2016 |
75mw......thinking how many homes that can power.
$145million, that's a lot of money.
Why charge us in American currency instead of naira? |
Re: 75mw Solar Power Project To Be Ready 2017 by Nobody: 9:58am On Jul 09, 2016 |
hotspec:have u ever imagine why all the gas powered plant are located in south south |
Re: 75mw Solar Power Project To Be Ready 2017 by sayusuf(m): 9:59am On Jul 09, 2016 |
temptnow: The same person that goes into Avengers and co stronghold |
Re: 75mw Solar Power Project To Be Ready 2017 by Standing5(m): 10:04am On Jul 09, 2016 |
KingsCity:You get head my bros. If at less than $150m we can get 75MW that's $2m/MW. $1b ($1,000m) will give us 500MW and $10b will easily give us our current capacity of 5000MW to double our total capacity. The only issue with this is that it most available during the day. But then that be could be used to drive our largely dead industries that need daytime power. That's good news for printers, small industries, coldrooms, and 90% of small businesses. The only part of the news i find out of place is the 20cent per kwh part. In india they get it around 6cent/kwh (N320/$). 1 Like |
Re: 75mw Solar Power Project To Be Ready 2017 by Nobody: 10:18am On Jul 09, 2016 |
fulanimafia:abi o...that guy Neva sabi anything, he doesn't know wassup! but Fulanimafia, is Nigeria only for Northerners and s/westerners? be sincere to yourself... do you not see anything wrong or unjust about the present arrangement? don't you think its only fair these peeps deserve to derive the most benefits from their resources? the approach of economic sabotaging is faulty tho this is the time were sound quality leadership like the one provided by the late Madella is needed. |
Re: 75mw Solar Power Project To Be Ready 2017 by Cargoed: 10:31am On Jul 09, 2016 |
WinningSun: Lagos will not be anywhere but darkness..Egbin power plant how many MW is it. Am sure not more than 750mw. Lagos needs not less than 2500mw. Also the dangote gas is pipeline from Ndelta so no change. and it is for mainly refinery and fertilizer plant. On another note Power generation is now a very private business just like running a pure water factory thks to Gej. So stop blaming gov. Anyone can now contribute to the national grid and it is a good business if they can pay up to 20c/MWh. in fact it pays now more than owning an oil rig. |
Re: 75mw Solar Power Project To Be Ready 2017 by jabojafa(m): 10:32am On Jul 09, 2016 |
adioolayi:yes... OBJ spent over $16B in his 8yrs tenure and cudnt get up to 4000MW.... |
Re: 75mw Solar Power Project To Be Ready 2017 by fulanimafia: 10:34am On Jul 09, 2016 |
FxDuke: Absolutely not, it isn't. Those guys blew their chances all through the Jonathan years, and now think they can blackmail everyone to get what they failed to ask for when they were in power. Isn't the best thing for the few billionaires amongst them to invest in the oil industry like other Nigerians like Otedola, Dangote, Rahamaniyya etc. in order to gain a foothold in the industry instead of sponsoring militancy to protest their current situation? They only have themselves to blame and blackmailing the current government and other Nigerians will NEVER work. 1 Like |
Re: 75mw Solar Power Project To Be Ready 2017 by Tomaxzyn1(m): 10:43am On Jul 09, 2016 |
Lols..Nigerians can project sha... In 2008..they were lots of agendas projected for 2012, 2014 etc..none majorly significant materialized..claimin no moni, even aunty okonjo claimed the economy was financially dis and dat.. Some yrs later..we woke up to the news of abt $2billion dollars bein misappropriated.. Nigerians got confused, wondering whr dis one came from wit all d stories dat naija is goin broke.. Nau we r projectin again...next year..we'll project for 2030 again..lolz.. Nigeria is ________ |
Re: 75mw Solar Power Project To Be Ready 2017 by Nobody: 10:47am On Jul 09, 2016 |
Cargoed:oga egbin power station installed capacity is above 1000mw. if it is not added to the national grid. Lagos will be light years ahead. |
Re: 75mw Solar Power Project To Be Ready 2017 by ferdoplay123: 10:49am On Jul 09, 2016 |
That's is welcome development just hope it will be real and not paper work |
Re: 75mw Solar Power Project To Be Ready 2017 by OneManLegion(m): 10:51am On Jul 09, 2016 |
KingsCity: Because, ceteris paribus, it would cost 29.2 BILLION DOLLARS! |
Re: 75mw Solar Power Project To Be Ready 2017 by OneManLegion(m): 10:55am On Jul 09, 2016 |
hotspec: Where were you when the president stated that he wants to diversify Nigeria's power sector in such a way that the source for generating power will be closer to the region. He also went ahead to say that it's gonna be solar for north, hydro-electric for north-central and south-west and Gas turbines for south-south and south-east. The president will not change his plans to suit your sensibility, bross. You may go continue wailing now. 2 Likes |
Re: 75mw Solar Power Project To Be Ready 2017 by bigtt76(f): 11:00am On Jul 09, 2016 |
We don't do things right in this country naaaaa. We should start with manufacturing the panels locally then the rest will follow. KingsCity: |
Re: 75mw Solar Power Project To Be Ready 2017 by Nobody: 11:06am On Jul 09, 2016 |
To be ready in 2017? In Nigeria? Future impossible tense |
Re: 75mw Solar Power Project To Be Ready 2017 by Mrjo(m): 11:08am On Jul 09, 2016 |
G12:ok! Boss, 75mw @ the of $146m to supply 1.1 million people. So, $146 mutiply by 150 is equals to $21900000000 |
Re: 75mw Solar Power Project To Be Ready 2017 by oladipo322(m): 11:11am On Jul 09, 2016 |
let watch and see
|
Re: 75mw Solar Power Project To Be Ready 2017 by jenti: 11:13am On Jul 09, 2016 |
celestialAgent:solar is sun dependent. It will do better in the north than in the south |
Re: 75mw Solar Power Project To Be Ready 2017 by Horlufemi(m): 11:14am On Jul 09, 2016 |
Godjone:bombs happened to them |
Tinubu: Atiku Lied, He Offered Me VP Position In 2007 While Aware Of My Faith / Landmark: The Ocean Would Have Eroded The Beach Without Eko Atlantic - Dr Toks / Jonathan Sponsored Boko Haram To Cover Up Corruption”, El-rufai Tells BBC
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 64 |