Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Godisgreatest1: 6:06pm On May 26, 2023 |
spyder880: Good evening Sir, please pardon my unrelated question, I lost the information you already shared before on this platform; After roofing a building, what are the steps to take serially and accordingly to final finishing?. Thank you. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:11pm On May 26, 2023 |
Godisgreatest1: I will send you the information later. Thanks. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by amosblac: 5:54am On May 27, 2023 |
spyder880:well done sir. The N34 million is for a single unit of the 6 flats or 2 units of the 6 flats? |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:13am On May 27, 2023 |
amosblac: For a single unit Sir. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:16am On May 27, 2023 |
Godisgreatest1: Order of house finish for new buildings 1. Scaffolding 2. Thunder arrestor and first floor electrical piping/distribution boards 3. Pre plumbing piping for hot/cold water, plus other provisions 4. Interior and exterior wall plastering/designs 5. POP ceilings 6. Windows and burglary proof 7. Doors and keys installation 8. Electrical wires 9. Handrails, step rails 10. Wall and floor tiles 11. Sanitary wares/toilet and bath fittings 12. Soakaway system construction, connection / inspection chambers 13. Wardrobe and kitchen cabinets 14. Borehole/ tank stand /tanks and water pipes 15. Fence works/gate 15. House painting 16. Electrical fittings installation, sockets, switches and lights 17. Compound filling, landscaping 18. Industrial cleaning / fumigation. 5 Likes 3 Shares |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 8:18am On May 27, 2023 |
spyder880: Please spyder, I need your help. My carpenter and engineer said the Aluminum Long Span roof used for my building is 0.47 guage. I doubt if there is a 0.47 guage and beside after installing the roof, I don't like it because it looks too shinny under the sun and also doesn't look balanced and straight. Please, what should be the cause, and do I have anyway to remedy this? Because I don't like the roof and I spent millions to install it. Now I am more like disliking the house. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:23am On May 27, 2023 |
Chidimercy: I haven't heard of 0.47 before, only 0.45 and 0.50. Roofs can look shiny after first installation, and will gradually lose the shine as the years roll by. If it doesn't look straight, it might be the fault of the roofers who did the wood work. Installation follows the placement and balance of the wood. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 8:35am On May 27, 2023 |
spyder880: Thanks for your contribution. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Godisgreatest1: 10:14am On May 27, 2023 |
spyder880: Great!. This is exactly the information I was looking for, Sir. I had searched through your comments to page 20 but couldn't trace them again. thank you very much sir, I really appreciate. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by CircleOfWilis: 3:19pm On May 27, 2023 |
I noticed the heights of the foundation (walls) are not at the same level. How can I correct it pls Sorry to border u sir Thank u sir
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:44pm On May 27, 2023 |
CircleOfWilis: Do you plan to put a foundation beam at this stage? |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by CircleOfWilis: 4:12am On May 28, 2023 |
spyder880:forgive my language...I meant the plinth beam. Thank you 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:18am On Jun 01, 2023 |
We have completed every work in the first floor walls of this building.
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:20am On Jun 01, 2023 |
We have cast every column and every beam with concrete, we have also topped the blocks in readiness for the decking.............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:23am On Jun 01, 2023 |
More pictures
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 3:58pm On Jun 05, 2023 |
Second decking works at this site is being prepared.......... |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 3:55pm On Jun 09, 2023 |
Looking at this house from another angle...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 3:57pm On Jun 09, 2023 |
From the front...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:00pm On Jun 09, 2023 |
From inside the compound.............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 1:56pm On Jun 16, 2023 |
Back to this building...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 6:22pm On Jun 16, 2023 |
From around the stairs.........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 6:26pm On Jun 16, 2023 |
2nd Decking wooden platform
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 6:28pm On Jun 16, 2023 |
From the ground............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:59am On Jun 22, 2023 |
Iron reinforcement works going on here now.............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:09am On Jun 22, 2023 |
Around the double stairs...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Akerewe(m): 3:54pm On Jun 26, 2023 |
spyder880: Pls what is the c/c spacing on this slab?? What type of iron is the best recently for slab either TMT/ LOCAL |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:01pm On Jun 26, 2023 |
Akerewe: We have our CC for this slab set at 60mm. The slab is a total of 150mm thickness. As for reinforcement rods, TMT is very cool, but there are standard gauges from most local companies these days after the FG improved the standard of rods late last year.
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Akerewe(m): 4:05pm On Jun 26, 2023 |
spyder880: C/c 60mm (less then 3 inches) as how, what am seeing on this slab is more than 60mm. May b am not getting u right! 150mm thickness is the standard! Pls can u recommend a nice local iron Rod nd it's price for me nd the brand also |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:45pm On Jun 26, 2023 |
Akerewe: You were asking about slab reinforcement and the CC, in a typical slab with projected thickness of 150mm, when you remove the 12mm rods, and the possibility of some lapping in some crossed areas, you will have about 120mm of concrete left, I usually plan to have about 60mm top and 60mm bottom. The bottom part is usually easier, I can use concrete biscuits to prop up the decking mat, but the top CC is trickier as we must navigate to ensure that adequate spread is made so that the CC plan will be achieved. B/w, 3 inches you mentioned is 75mm, not 60mm.
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Akerewe(m): 8:54pm On Jun 26, 2023 |
spyder880: Noted engineer 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 5:27am On Jun 27, 2023 |
Akerewe: Thank you. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 3:22pm On Jun 27, 2023 |
We have started the full concrete cast of this decking slab................ |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (19) (Reply)
BEST QUALITY IMPORTED BULLETPROOF SECURITY DOORS AT REDUCED PRICES FOR HOMES / Architectural Designs And Problems That May Occur / Hot Offer! Beachfield Estate Epe Now Selling N850k Per Plot
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 47 |