yak:2M can't complete a 2 bedroom flat, Factors like location and soil condition determines the estimation. |
flexdav:With a budget of NGN 3.8 to 4.2 Million, Double of the attached floor plan will be fully executed. Which part of Kaduna? Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Kieldgreat:Check previous post, What's the description of your proposed project? A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
thermalroll:What type of foundation was done? Below is a rough estimate as indicated in stages, quoted amounts are for materials needed for the execution of the project in stages. A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. STAGE 1- Marking Out of Building Area Water Connection Setting Out Excavation/Blinding Column Base and Starter Column. Boarding of the Starter Column Casting of the Starter Column Excavation of Septic Tank Sand filling Wetting/Ramming/Compacting Damproofing Casting of Foundation Slab Block Setting Casting of Column, Beams and lintel Electrical Rough-in work Mechanical Rough-in work NGN 2,193,000 STAGE 2 First Floor Formwork First Floor Reinforcement Slab Casting Electrical and Mechanical Works Block Setting Casting of Columns and Beams Lintels and Tank slab. Parapet Fascia Woodwork NGN 562,500+2,617,500 STAGE 3 Roofing( Stone Coated Roof Tiles) 2,396,000 STAGE 4 Plastering and Rendering 786,000 Overall Total: NGN8,555,000 STAGE 5: FINISHES: POP, Screeding,Painting,Tiles,Doors and Windows(In accordance to our clients taste). Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
What type of foundation was done? Below is a rough estimate as indicated in stages, quoted amounts are for materials needed for the execution of the project in stages. A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. STAGE 1- Marking Out of Building Area Water Connection Setting Out Excavation/Blinding Column Base and Starter Column. Boarding of the Starter Column Casting of the Starter Column Excavation of Septic Tank Sand filling Wetting/Ramming/Compacting Damproofing Casting of Foundation Slab Block Setting Casting of Column, Beams and lintel Electrical Rough-in work Mechanical Rough-in work NGN 2,193,000 STAGE 2 First Floor Formwork First Floor Reinforcement Slab Casting Electrical and Mechanical Works Block Setting Casting of Columns and Beams Lintels and Tank slab. Parapet Fascia Woodwork NGN 562,500+2,617,500 STAGE 3 Roofing( Stone Coated Roof Tiles) 2,396,000 STAGE 4 Plastering and Rendering 786,000 Overall Total: NGN8,555,000 STAGE 5: FINISHES: POP, Screeding,Painting,Tiles,Doors and Windows(In accordance to our clients taste). Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
My apology for responding lately. 300k will only be sufficient for the start up due to the site being a waterlogged area. 40 Tonnes of Sharpsand: 120,000 30 Tonnes of Granite : 140,000 70 Bags of Cement @ 1950= 136,500 1/2 Tonnes of 12mm Iron Rod = NGN 70,000 Labour: Negotiable NB: You can email me the picture of the site if available but inspection is advisable in order to know the exact condition of the site and it's topography. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Factors that determines the amount to be spent are: 1. The size of the land. 2. The location of the land. Provide the aforementioned information in order to get a detailed estimate. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
You can maintain a 5.5m by 6.0m for the sitting room, Master bedroom sizes varies depending on your preference 4.6m by 4.6m should be spaciously okay, maintain corridor at width 1.5m. W/C and Bath space is okay at 1.8m by 2.4m. Calculation of blocks can be very easy with this logic : 6 inch hollow block is 18 inches at length and 2 (18inch X 2= 32inch i.e 3ft) hollow blocks makes 3feet when bonded. If the length of the proposed building is 80 ft , 80ft divided by 3ft = 26.667 X 2 blocks = 53.3334 approx 54 Blocks ( for a side) Mathematically you can accurately calculate the number of blocks needed for load bearing and non loading bearing walls. Calculation/Estimation of materials are accurately done with the availability of a building plan for the proposed project. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Good absorbers |
Do you care for my personal used Honda Baby Boy with leather interior? Working perfect. Lagos is the location. |
5 Speed Tranny |
Fuel efficient |
First Body |
Ok |
Still Available |
Wash the car and engine, if you choose to |
Neat Interior. Neat Trunk
|
Sound Manual Transmission 4 Plugs Radio/Cassette Player Jack Wheel Spanner. Still in use till date by me. Bought toks from Belgium car description and custom paper still available). Buyer may Behind it his/her own taste .
|
Sound Manual Transmission 4 Plugs Radio/Cassette Player Jack Wheel Spanner. Still in use till date by me. Bought toks from Belgium car description and custom paper still available
|
AniNtuen:480k... it's a buy and drive..no issues.. still in use |
AniNtuen:It's all a matter of choice, this car happens to be my 1st automatic drive, Neva had issues with it. V6 accelerates faster than 4 plug. |
Got an Honda Babyboy with leather seat interior, v6, auto , neat and clean, car is my personal used car.u ve got to up your offer for it slightly . AniNtuen: |
Gbosa1:It will cost you NGN 16 Million for the completion of the building. Building Carcass( foundation-plastering-roofing-electrical and mechanical, Septic Tank and Borehole inclusive) Bldr. Ade 08058307787 |
Do you like the attached plan fits to your description or you have a preference ? What's the proposed location of the project. I will provided a detailed quotation for the start-up till finishing accurately as soon as you provide the response to the questions. NB: location determines the amount to be expended on a project. Bldr. Ade 08058307787
|
Can you provide the location? Does the plastering include the interior and exterior of the building. What's the present state of the floor? By providing the aforementioned information, I can easily provide you an accurate needed materials and labour rate. Bldr. Ade 08058307787 |
Kindly provide detailed dimension of the land and inspection can be done at your request. Attached herewith is a 5bedroom Duplex Plan which can be constructed at the rate of NGN12.5 Million . Bldr. Ade 08058307787
|
Do you care for Honda BabyBoy leather seat , automatic. ? |
State their respective prices. |
FADEO:Please make use of pillars, don't look at the cost, short pillars will be okay. I reside around the environment. Bldr Adebayo A. |
With a rough estimate it shouldn't exceed 1.1 Million or less( workmanship inclusive). You can provide a detailed description of the project or even the drawing for an accurate estimation. Bldr. Ade 08058307787 |
Factors that can save you cost on this projects are: 1.What's the soil condition and topography of the land. 2. Location. 3. Any long term plan that may lead to partial demolition of the fence in future. Bldr. Ade 08058307787 |