What type of foundation was done? Below is a rough estimate as indicated in stages, quoted amounts are for materials needed for the execution of the project in stages. A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. STAGE 1- Marking Out of Building Area Water Connection Setting Out Excavation/Blinding Column Base and Starter Column. Boarding of the Starter Column Casting of the Starter Column Excavation of Septic Tank Sand filling Wetting/Ramming/Compacting Damproofing Casting of Foundation Slab Block Setting Casting of Column, Beams and lintel Electrical Rough-in work Mechanical Rough-in work NGN 2,193,000 STAGE 2 First Floor Formwork First Floor Reinforcement Slab Casting Electrical and Mechanical Works Block Setting Casting of Columns and Beams Lintels and Tank slab. Parapet Fascia Woodwork NGN 562,500+2,617,500 STAGE 3 Roofing( Stone Coated Roof Tiles) 2,396,000 STAGE 4 Plastering and Rendering 786,000 Overall Total: NGN8,555,000 STAGE 5: FINISHES: POP, Screeding,Painting,Tiles,Doors and Windows(In accordance to our clients taste). Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
My apology for responding lately. 300k will only be sufficient for the start up due to the site being a waterlogged area. 40 Tonnes of Sharpsand: 120,000 30 Tonnes of Granite : 140,000 70 Bags of Cement @ 1950= 136,500 1/2 Tonnes of 12mm Iron Rod = NGN 70,000 Labour: Negotiable NB: You can email me the picture of the site if available but inspection is advisable in order to know the exact condition of the site and it's topography. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Factors that determines the amount to be spent are: 1. The size of the land. 2. The location of the land. Provide the aforementioned information in order to get a detailed estimate. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
You can maintain a 5.5m by 6.0m for the sitting room, Master bedroom sizes varies depending on your preference 4.6m by 4.6m should be spaciously okay, maintain corridor at width 1.5m. W/C and Bath space is okay at 1.8m by 2.4m. Calculation of blocks can be very easy with this logic : 6 inch hollow block is 18 inches at length and 2 (18inch X 2= 32inch i.e 3ft) hollow blocks makes 3feet when bonded. If the length of the proposed building is 80 ft , 80ft divided by 3ft = 26.667 X 2 blocks = 53.3334 approx 54 Blocks ( for a side) Mathematically you can accurately calculate the number of blocks needed for load bearing and non loading bearing walls. Calculation/Estimation of materials are accurately done with the availability of a building plan for the proposed project. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Good absorbers |
Do you care for my personal used Honda Baby Boy with leather interior? Working perfect. Lagos is the location. |
5 Speed Tranny |
Fuel efficient |
First Body |
Ok |
Still Available |
Wash the car and engine, if you choose to |
Neat Interior. Neat Trunk
|
Sound Manual Transmission 4 Plugs Radio/Cassette Player Jack Wheel Spanner. Still in use till date by me. Bought toks from Belgium car description and custom paper still available). Buyer may Behind it his/her own taste .
|
Sound Manual Transmission 4 Plugs Radio/Cassette Player Jack Wheel Spanner. Still in use till date by me. Bought toks from Belgium car description and custom paper still available
|
AniNtuen:480k... it's a buy and drive..no issues.. still in use |
AniNtuen:It's all a matter of choice, this car happens to be my 1st automatic drive, Neva had issues with it. V6 accelerates faster than 4 plug. |
Got an Honda Babyboy with leather seat interior, v6, auto , neat and clean, car is my personal used car.u ve got to up your offer for it slightly . AniNtuen: |
Gbosa1:It will cost you NGN 16 Million for the completion of the building. Building Carcass( foundation-plastering-roofing-electrical and mechanical, Septic Tank and Borehole inclusive) Bldr. Ade 08058307787 |
Do you like the attached plan fits to your description or you have a preference ? What's the proposed location of the project. I will provided a detailed quotation for the start-up till finishing accurately as soon as you provide the response to the questions. NB: location determines the amount to be expended on a project. Bldr. Ade 08058307787
|
Can you provide the location? Does the plastering include the interior and exterior of the building. What's the present state of the floor? By providing the aforementioned information, I can easily provide you an accurate needed materials and labour rate. Bldr. Ade 08058307787 |
Kindly provide detailed dimension of the land and inspection can be done at your request. Attached herewith is a 5bedroom Duplex Plan which can be constructed at the rate of NGN12.5 Million . Bldr. Ade 08058307787
|
Do you care for Honda BabyBoy leather seat , automatic. ? |
State their respective prices. |
FADEO:Please make use of pillars, don't look at the cost, short pillars will be okay. I reside around the environment. Bldr Adebayo A. |
With a rough estimate it shouldn't exceed 1.1 Million or less( workmanship inclusive). You can provide a detailed description of the project or even the drawing for an accurate estimation. Bldr. Ade 08058307787 |
Factors that can save you cost on this projects are: 1.What's the soil condition and topography of the land. 2. Location. 3. Any long term plan that may lead to partial demolition of the fence in future. Bldr. Ade 08058307787 |
sule4:It's cheaper to mould block. Buying saves stress of waiting for a moulded block to cure( harden). It's all a matter of choice. Kindly email me in order to get you a detailed quotation with the iron rod calculation inclusive. access2m@hotmail.com |
Advocatesam:60 Tonnes will be sufficient. 20 tonnes @ 30,000 X 3= 90,000 |
sule4:in order to specify if iron bars and pillars will be needed you need to specify the location of the proposed project and soil condition of the site. South west axis and anywhere in the geographical area in Nigeria. , operating from Ogun State precisely. Bldr. Ade 08058307787 |
CityNG:100 ft by 120 ft 2 blocks= 3 feet 100 ft X 2= 200 ft 120 ft X 2= 240 ft 440ft/3feet=146.667 X 2blocks =293.33 aprox. 294 blocks per coarse(coach) 294 block X 4 coarses= 1,176 Blocks 1,176 Blocks will be needed for additional 4 coarses ( space for gate is included to serve as breakage allowance) Soft Sand ; 10 Tonne Cement: 13 Bag Workmanship: Negotiable Bldr. Ade 08058307787 |