Boarding of Starter Columns
|
2% block work to go--- completed
|
We started boarding some ready areas.
|
Day 7: Excavation ended on Septic Tank & Soak Away: will take pix tomorrow. Substructure block work completed @ 98 %: Reason; It rained heavily on Sunday noon for 3 Hours
|
In God We Trust.
|
God Bless You Sir, Noted !!! topsy23: |
We got disturbed by rain though.
|
Block work
|
Day 6:Foundation Block Work Ongoing Excavation of Septic Tank and Soak Away
|
Day 5:Blinding In Progress
|
Day 4: Excavation of Building area fully completed Iron Benders @ Work, starting up with the reinforcement bars and stirrups Starter Reinforcement and Mats.
|
Day2: Delivery of special blocks( Stone Dust+Cement) Excavation of Septic Tank and Soak away began Delivery of Profile Board for setting out. Excavation of Building area. Day 3: Exacavation continues
|
Ground Floor 2 Bedrooms (En Suite) 1 kitchen 1 kitchen store 1 ante room 1 Expansive Main Lounge 1 visitors W/c Dinning Area+ Bar Space 1 Terrace 1 Carport First Floor 4 Bedrooms- all ensuite( 1 Master Bedroom Inclusive) 1 Private Lounge Terrace Land Size | 704.010 sqm Project Status | Ongoing Development Budget | Confidential( Will give breakdown per stages completed) Start Date | October 1, 2015 Client | A Nairalander in the Diaspora Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com Location: Lagos & Ogun State
|
God Bless You for the eye opening challenge. |
I so much appreciate that, Few phone calls should guarantee permissions which in turn will enable me bring pictorial representation to your view. |
I took note of that i.e swampy, which will requires a Raft Foundation, The determinant of the actual cost will be the design of the proposed structure. Quoting from experience at Ipakodo/Igbogbo area of Ikorodu. snakebeat: |
My projects are done in respect of client privacy which i don't just showcase without client's permission. My current project of 4 bedroom duplex at Opebi, Ikeja started with just a phone call in December from a Nairalander who saw my comment, same here on Nairaland i have seen people who can't defend themselves as Builder or even take credit for another person project here on Nairaland. here is nothing but a social forum. Should you need a reference to jobs done till date, They are readily available upon request without delay. EgunMogaji: |
Which part of Ikorodu is the proposed project located? It shouldn't exceed 4.5m to 5.8m upon inspection. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Location is a major factor that determines the cost of a project, It shouldn't exceed 18m-22m as you specified. Where is the proposed project located? Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Still available @ 150k |
Check my Honda Accord out, can sell at 150k... Reason for sale, Got another car, can't let it remain idle. https://www.nairaland.com/2381152/honda-accord-sale-190k |
nnatom:Email me on access2m@hotmail.com Will readily give you the estimate and a sketchy floor plan. |
Architectural fees are based on the the proposed structure to be designed which are not limited to Structural Drawing,Mechanical and Electrical Drawing. Can you provide a description of your proposed single level structure? Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
To build a well tiled and painted mini flat which consist of A Room,Parlor,Kitchenette,Toilet& Bath. The sum of 1.5m to 1.8m will complete the project to the stage hand over. Aluminum Long-span sheet,POP Ceiling Board, Painting,Sanitary+Kitchen Appliances,Doors,Electrical and Plumbing Fittings,Spanish Tiled Sitting room inclusive. Email me for the building plan and detailed estimate. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Location is a major factor that determines the cost of a project, It shouldn't exceed 1.5-2m as you specified. Where is the proposed project located? Reach Us: 08058307787 |
simmja:With a similar project at hand, It will cost 12m for the building carcass,parapet,roofing and plastering+rendering. Finishes: Painting,Screeding,POP,Sanitary+Kitchen wares and Doors at 3.2 Million. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Block, Iron Rod,Cement,Granite and Sharpsand are roughly estimated for completion at NGN 157,650. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
yak:2M can't complete a 2 bedroom flat, Factors like location and soil condition determines the estimation. |
flexdav:With a budget of NGN 3.8 to 4.2 Million, Double of the attached floor plan will be fully executed. Which part of Kaduna? Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Kieldgreat:Check previous post, What's the description of your proposed project? A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
thermalroll:What type of foundation was done? Below is a rough estimate as indicated in stages, quoted amounts are for materials needed for the execution of the project in stages. A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. STAGE 1- Marking Out of Building Area Water Connection Setting Out Excavation/Blinding Column Base and Starter Column. Boarding of the Starter Column Casting of the Starter Column Excavation of Septic Tank Sand filling Wetting/Ramming/Compacting Damproofing Casting of Foundation Slab Block Setting Casting of Column, Beams and lintel Electrical Rough-in work Mechanical Rough-in work NGN 2,193,000 STAGE 2 First Floor Formwork First Floor Reinforcement Slab Casting Electrical and Mechanical Works Block Setting Casting of Columns and Beams Lintels and Tank slab. Parapet Fascia Woodwork NGN 562,500+2,617,500 STAGE 3 Roofing( Stone Coated Roof Tiles) 2,396,000 STAGE 4 Plastering and Rendering 786,000 Overall Total: NGN8,555,000 STAGE 5: FINISHES: POP, Screeding,Painting,Tiles,Doors and Windows(In accordance to our clients taste). Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
What type of foundation was done? Below is a rough estimate as indicated in stages, quoted amounts are for materials needed for the execution of the project in stages. A similar project(rented/commercial flat) was done at Omorege Str, Off AIT Road, Alagbado in 2012. STAGE 1- Marking Out of Building Area Water Connection Setting Out Excavation/Blinding Column Base and Starter Column. Boarding of the Starter Column Casting of the Starter Column Excavation of Septic Tank Sand filling Wetting/Ramming/Compacting Damproofing Casting of Foundation Slab Block Setting Casting of Column, Beams and lintel Electrical Rough-in work Mechanical Rough-in work NGN 2,193,000 STAGE 2 First Floor Formwork First Floor Reinforcement Slab Casting Electrical and Mechanical Works Block Setting Casting of Columns and Beams Lintels and Tank slab. Parapet Fascia Woodwork NGN 562,500+2,617,500 STAGE 3 Roofing( Stone Coated Roof Tiles) 2,396,000 STAGE 4 Plastering and Rendering 786,000 Overall Total: NGN8,555,000 STAGE 5: FINISHES: POP, Screeding,Painting,Tiles,Doors and Windows(In accordance to our clients taste). Email me for a full plan and estimate with materials listed in reference to the quoted amount and Floor Plan+ 3D Designs. Attached is an elevation plan. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |