₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,325,037 members, 8,420,013 topics. Date: Thursday, 04 June 2026 at 09:29 AM

Toggle theme

Adebaxton's Posts

Nairaland ForumAdebaxton's ProfileAdebaxton's Posts

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (of 28 pages)

SportsRe: LEAKED: Leicester City Involved In Buddhist Belief [PHOTOS] by adebaxton(m): 3:03pm On Dec 24, 2015
Ok
PropertiesRe: Estimate For Decking by adebaxton(m): 1:52pm On Dec 24, 2015
The dimension of the floor plan will go a long way to get a detailed estimate for comparism.
tobi197:
Guys,
My builder gave me this estimate just for decking of a four (4) flat/three bedroom(3bdroom). Two (2up)/two (2down) and I believe it is too much for just the decking. I have done the lintel already. Advice is appreciated.
Thanks y'all
S/N DESCRIPTION QUANTITY RATE AMOUNT
1 Blocks 500 150 75, 000
2 Masonry work for the blocks 500 50 25, 000
3 Pieces of 2x3x12 wood 350 400 140, 000
4 Pieces of 1x12x12 board 530 1, 400 742, 000
5 Pieces of Bamboo 1, 250 200 250, 000
6 Carpentry workmanship on slab & beam - - 250, 000
7 Lengths of 16mm iron bars 78 2, 400 182, 200
8 Lengths of 12mm iron bars 355 1, 200 426, 000
9 Length of 10mm iron bars 486 1, 000 486, 000
10 Rolls of Binding wires 6 7, 000 42, 000
11 Bags of Nails 7 5, 000 35, 000
12 Iron Benders Workmanship - - 200, 000
13 Load of 30 tones of granite 3 130, 000 390, 000
14 Load of 20 tones of sand 6 60, 000 360, 000
15 Bags of cement 247 1, 650 407, 550
16 Casting of slabs & beams - - 250, 000
17 Bundles of 20mm PVC electrical pipes 15 2, 500 37, 500
18 Packets of 20mm couplers for electrical pipes 5 900 4, 500
19 Packets of 20mm 4 way boxes for electrical pipe 2 1, 000 2, 000
20 Electrician workmanship - - 50, 000
21 Cash on site with handling of materials to site - - 100, 000
22 TOTAL 4, 454, 750
PropertiesRe: 16 Rooms Self Contain Hostel by adebaxton(m):
Foundation to Lintel Level
Items Unit Item Unit Price Total Price
12mm Iron Rod 2 Tons 140,000 280,000
10mm Iron Rod ½ Ton 65,000 65,000
6” Vib. Block 2500 130 325,000
9” Vib. Block 3500 150 525,000
Cement 375 Bags 1400 525,000
Binding Wire 10 Kg 1,000 10,000
Sharpsand 10 Truck 38,000 380,000
Granite 90 Tonnes 130,000 X3 390,000
Gravel 2 Trip 45,000 90,000
2500 litres tank 1 30,000 30,000
Mechanical Material 16 rooms 272,000
Electrical Material 16 rooms 240,000
Filling Laterite 8 Trip 10,000 80,000
NGN3,212,000
NB: The proximity of Abeokuta to papalanto area(availability of sharpsand in surplus) will make the sourcing of the materials more cheaper.


Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com][i][/i]

Onion16:
Hi all. Please i would like to know how much a 16 rooms self contain hotel in abeokuta will cost to build from start to finish. I have a feeling the quote i was given by my younger brother is inflated because i am overseas. Sadly, this are the challenges we face when live overseas. Professional advice is needed for the price quotes in stages from foundation till finishing. Thanks and God bless.

PropertiesRe: 16 Rooms Self Contain Hostel by adebaxton(m): 1:38pm On Dec 24, 2015
The Middle space can serve as a parking space and a sit out.
Every room has its own terrace.
PropertiesRe: Estimate For Decking by adebaxton(m): 9:32pm On Dec 23, 2015
That's high from my experience and perspective.



tobi197:
Guys,
My builder gave me this estimate just for decking of a four (4) flat/three bedroom(3bdroom). Two (2up)/two (2down) and I believe it is too much for just the decking. I have done the lintel already. Advice is appreciated.
Thanks y'all
S/N DESCRIPTION QUANTITY RATE AMOUNT
1 Blocks 500 150 75, 000
2 Masonry work for the blocks 500 50 25, 000
3 Pieces of 2x3x12 wood 350 400 140, 000
4 Pieces of 1x12x12 board 530 1, 400 742, 000
5 Pieces of Bamboo 1, 250 200 250, 000
6 Carpentry workmanship on slab & beam - - 250, 000
7 Lengths of 16mm iron bars 78 2, 400 182, 200
8 Lengths of 12mm iron bars 355 1, 200 426, 000
9 Length of 10mm iron bars 486 1, 000 486, 000
10 Rolls of Binding wires 6 7, 000 42, 000
11 Bags of Nails 7 5, 000 35, 000
12 Iron Benders Workmanship - - 200, 000
13 Load of 30 tones of granite 3 130, 000 390, 000
14 Load of 20 tones of sand 6 60, 000 360, 000
15 Bags of cement 247 1, 650 407, 550
16 Casting of slabs & beams - - 250, 000
17 Bundles of 20mm PVC electrical pipes 15 2, 500 37, 500
18 Packets of 20mm couplers for electrical pipes 5 900 4, 500
19 Packets of 20mm 4 way boxes for electrical pipe 2 1, 000 2, 000
20 Electrician workmanship - - 50, 000
21 Cash on site with handling of materials to site - - 100, 000
22 TOTAL 4, 454, 750
Business To BusinessRe: Red Brick making machine for sale. by adebaxton(m): 9:51am On Dec 23, 2015
location plz?
PropertiesRe: Builders In The House ? by adebaxton(m): 4:33pm On Dec 22, 2015
expect a detailed estimate in the evening.
zuraking:
Good morning everyone.

Please I am a young guy of 24 and I want to have my own little house next year by the grace of God.

Though my dad offered me a room % parlor BQ in our compound but I want to stay away from my family so that I can get my respect since I am the first.

I bought a cheap 1 and half plot of land in a local area in Ibadan two days ago and I want to build a room self contain or a small room and parlor for myself alone till God provide for me.

Please how much can finish the above plan till finishing. Just a simple house o no design since I will build a bigger one in future.

Help me with rough break down please in a cheaper way.

No aluminum roofing o cheesy

Thanks
PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:18pm On Dec 22, 2015
will re arrange pictorial representation.
PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:04pm On Dec 22, 2015
POP

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:02pm On Dec 22, 2015
POP and Tiles Installation.
Took me to Djeregbe in Port Novo in order to bring professional hands on deck
Tiles: Sourced from Zematech and Construmart, Spanish and Turkisk.
Doors: Turkish

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:58pm On Dec 22, 2015
Installation of Doors and Windows

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:55pm On Dec 22, 2015
Pre Screeding and Internal Finishes on going

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:15pm On Dec 22, 2015
Pre Screeding of the internal and external walls+ erection of fence.

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:05pm On Dec 22, 2015
Lost my media files along the line.

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:04pm On Dec 22, 2015
More

PropertiesRe: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:02pm On Dec 22, 2015
Foundation:

PropertiesThe Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op):
Initial Plan: 5 bedroom Duplex
Final Plan: 4 Bedroom Duplex to Client's Specification.
Completion August(Carcass)
Finishes: October-November 2015
Terms: Pay as we Build
Location: Opebi, Ikeja.


Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
Location: Lagos & Ogun State

PropertiesRe: Urgent Sale: Lekki Phase1 4bdrms Duplex + Ikoyi 1 acre + Mowe, Ogun state 1 acre by adebaxton(m): 3:03pm On Dec 18, 2015
Why not come on Sunday and see us worship there, Our 1st service in the new auditorium starts these Sunday.





lakeside50:
1). Location: Lekki Phase 1, close to the third entrance gate. Just behind the VFS office.
Size of land on which house is built: 500sqmtrs.
Type of building: 4 bedrooms fully furnished semi detached duplex having a 2bedrooms bq. All ensuite (5 toilets, 4baths). Dining section, spacious kitchen + store room, POP ceiling, tiled floors, parking space for as much as 6 - 8 cars etc.
2 bedrooms bq. Same finishing as above.
Title: Deed of Assignment.
Price: #150m.

***They are selling with the furnishing in the house eg the AirConditioners, Flat screen tvs, 30kv genset, fridge & freezer, chairs, beds & dining sets etc. ***

2). Location: New Oko Oba/Abbatoir road. Opposite the Vet and Maple Wood Estate, Oko oba/Abbatoir road.
Type of building: former bank building/premises on 3 plots of land.
Title: C of O.
Price: #200m.

*** Building to be sold with all the facilities including Transformer etc ***

Please call 08186161605, 07060495156 for more info/inspections.
BlackBerry pin: 2C0E5627......

AutosRe: Honda Accord For Sale 150K by adebaxton(op): 8:12pm On Dec 17, 2015
Kept it too, felt someone else might need it.
It remains my 1st and beloved car.
AutosRe: Honda Accord For Sale 150K by adebaxton(op): 7:38pm On Dec 17, 2015
Good 2 go
PropertiesRe: Cost Of laying a bungalow Foundation by adebaxton(m): 5:12pm On Dec 17, 2015
Location and the specification which includes sizes of the rooms in the building goes a long way to determine an estimate for a project.

squarelead:
Pls I need the estimate for building a 3 bedroom bungalow, from the foundation level to the finishing.
PropertiesRe: 2.45million To Deck A Four Bedroom Duplex!is It Not Much?help! by adebaxton(m):
RALPHOW:
Please can somebody give me each breakdown of the required items for decking 5 Bedroom DUPLEX?
Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
PropertiesRe: 2.45million To Deck A Four Bedroom Duplex!is It Not Much?help! by adebaxton(m):
Do you have the floor plan and elevation indicating the dimension of the building?
That will be helpful coupled with the location of the project.

Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
PropertiesRe: Cost Of Fencing A Plot Of Land by adebaxton(m):
1890 blocks approximately.
60+60+120=240/3= 80 x2 = 160 blocks per course(coach)
160 x 10= 1600blocks
Cross bonding blocks @ 240/10= 24 pillars x 10 block Do= 240 blocks
240+ 1600= 1,840 blocks + 40( breakage allowance)
Total blocks: 1880 blocks
60 bags of cement
10 tons of gravel/granite
25 tons of Sharpsand.

Done this over and over for Nairalanders, check my moniker.


Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
PropertiesRe: Quotations For Roofing 2 Bedroom Flat With Long Span Zinc by adebaxton(m):
Do you know the actual dimension of the proposed building to be roofed?
It goes a long way to determine the actual needed materials.


Reach Us: 08058307787
Email: access2m@yahoo.com
access2m@hotmail.com
PropertiesRe: Urgent Sale: Lekki Phase1 4bdrms Duplex + Ikoyi 1 acre + Mowe, Ogun state 1 acre by adebaxton(m): 7:08am On Dec 12, 2015
Point of correction, That bank building was sold and bought by my church, I will advice you flag it down.
Kindly make your confirmation.
AutosRe: Sold - Sold : American Spec 1999 Toyota Camry - Neatly Used. by adebaxton(m): 6:08pm On Dec 07, 2015
price?
PropertiesRe: What Will It Cost To Build? Material Detail Please by adebaxton(m): 6:04pm On Dec 07, 2015
We appreciate you Sir, It was a nice experience being of service to you.
The motivation, inspiration and your humility are unrivaled. Your 1st time on site, you were in the sun with us. That's rare.
God Bless You Sir.
omoola007:
Update on the project

Finally we completed the fencing portion of the project. Here is a final analysis of cost.

Perimeter in Feet 480
Perimeter in Inches 5760
Base Blocks 320
Block Needed 3200
Extra Block allowance 320
Less Pilar blocks 290
Estimated block 3,230

Actual Blocks 6inch at 130 Each = 3520 N457,600
Cement @1550 and 1600 = 114 N139,200

Number of Pilars 53
Cement Pilar @1,600 = 27 N43,200
Iron rod 12mm =53 Pieces N60,000
Iron rod 10mm =13 Pieces N15,600
Gate Iron Rod 16mm =8 Pieces N17,600
Wire = N3,000
Plank of wood frame @1,000 =40Pieces N40,000
Truck Granite =30 Ton N130,000 (About 10 ton left over)
Truck Sharp Sand@26,000 =3 Trip N78,000
Truck Dagbolu Sand @18,000 = 3 Trip N54,000
Gate Swing @80k , Sliding @100k N180,000
Iron transport N10,000
Generator rental and fuel N3,000

Labor was negotiated in bulk but this is a rough estimate of the cost.
Carpenter N20,000
Welder/Iron Bender N15,000
Brick layer @50 Per Blk N165,000
Labor @20 Per Blk N66,000
Foundation Excavation N20,000

Fence Total N1,517,200

Borehole
Borehole N150,000
Water Tank base block N2,160
Water tank N26,000
Borehole security Iron N5,000

Borehole Total N183,160

Adebaxton - really impressed me on how he went about his work. He really made a commitment to get it completed without a hitch. I highly recommend him. He was able to solve issues onsite without dragging me into it. That was commendable
PropertiesRe: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:45pm On Dec 02, 2015
Taking Shape.

PropertiesRe: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:44pm On Dec 02, 2015
Awaiting Suspended Slab.

PropertiesRe: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:41pm On Dec 02, 2015
Done and Dusted

PropertiesRe: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:40pm On Dec 02, 2015
Septic Tank/Soakway

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (of 28 pages)