Properties › Re: Estimate For Decking by adebaxton(m): 1:52pm On Dec 24, 2015 |
The dimension of the floor plan will go a long way to get a detailed estimate for comparism. tobi197: Guys, My builder gave me this estimate just for decking of a four (4) flat/three bedroom(3bdroom). Two (2up)/two (2down) and I believe it is too much for just the decking. I have done the lintel already. Advice is appreciated. Thanks y'all S/N DESCRIPTION QUANTITY RATE AMOUNT 1 Blocks 500 150 75, 000 2 Masonry work for the blocks 500 50 25, 000 3 Pieces of 2x3x12 wood 350 400 140, 000 4 Pieces of 1x12x12 board 530 1, 400 742, 000 5 Pieces of Bamboo 1, 250 200 250, 000 6 Carpentry workmanship on slab & beam - - 250, 000 7 Lengths of 16mm iron bars 78 2, 400 182, 200 8 Lengths of 12mm iron bars 355 1, 200 426, 000 9 Length of 10mm iron bars 486 1, 000 486, 000 10 Rolls of Binding wires 6 7, 000 42, 000 11 Bags of Nails 7 5, 000 35, 000 12 Iron Benders Workmanship - - 200, 000 13 Load of 30 tones of granite 3 130, 000 390, 000 14 Load of 20 tones of sand 6 60, 000 360, 000 15 Bags of cement 247 1, 650 407, 550 16 Casting of slabs & beams - - 250, 000 17 Bundles of 20mm PVC electrical pipes 15 2, 500 37, 500 18 Packets of 20mm couplers for electrical pipes 5 900 4, 500 19 Packets of 20mm 4 way boxes for electrical pipe 2 1, 000 2, 000 20 Electrician workmanship - - 50, 000 21 Cash on site with handling of materials to site - - 100, 000 22 TOTAL 4, 454, 750 |
Properties › Re: 16 Rooms Self Contain Hostel by adebaxton(m): 1:40pm On Dec 24, 2015*. Modified: 12:35pm On Jan 31, 2017 |
Foundation to Lintel Level Items Unit Item Unit Price Total Price 12mm Iron Rod 2 Tons 140,000 280,000 10mm Iron Rod ½ Ton 65,000 65,000 6” Vib. Block 2500 130 325,000 9” Vib. Block 3500 150 525,000 Cement 375 Bags 1400 525,000 Binding Wire 10 Kg 1,000 10,000 Sharpsand 10 Truck 38,000 380,000 Granite 90 Tonnes 130,000 X3 390,000 Gravel 2 Trip 45,000 90,000 2500 litres tank 1 30,000 30,000 Mechanical Material 16 rooms 272,000 Electrical Material 16 rooms 240,000 Filling Laterite 8 Trip 10,000 80,000 NGN3,212,000 NB: The proximity of Abeokuta to papalanto area(availability of sharpsand in surplus) will make the sourcing of the materials more cheaper. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com][i][/i] Onion16: Hi all. Please i would like to know how much a 16 rooms self contain hotel in abeokuta will cost to build from start to finish. I have a feeling the quote i was given by my younger brother is inflated because i am overseas. Sadly, this are the challenges we face when live overseas. Professional advice is needed for the price quotes in stages from foundation till finishing. Thanks and God bless.
|
Properties › Re: 16 Rooms Self Contain Hostel by adebaxton(m): 1:38pm On Dec 24, 2015 |
The Middle space can serve as a parking space and a sit out. Every room has its own terrace. |
Properties › Re: Estimate For Decking by adebaxton(m): 9:32pm On Dec 23, 2015 |
That's high from my experience and perspective. tobi197: Guys, My builder gave me this estimate just for decking of a four (4) flat/three bedroom(3bdroom). Two (2up)/two (2down) and I believe it is too much for just the decking. I have done the lintel already. Advice is appreciated. Thanks y'all S/N DESCRIPTION QUANTITY RATE AMOUNT 1 Blocks 500 150 75, 000 2 Masonry work for the blocks 500 50 25, 000 3 Pieces of 2x3x12 wood 350 400 140, 000 4 Pieces of 1x12x12 board 530 1, 400 742, 000 5 Pieces of Bamboo 1, 250 200 250, 000 6 Carpentry workmanship on slab & beam - - 250, 000 7 Lengths of 16mm iron bars 78 2, 400 182, 200 8 Lengths of 12mm iron bars 355 1, 200 426, 000 9 Length of 10mm iron bars 486 1, 000 486, 000 10 Rolls of Binding wires 6 7, 000 42, 000 11 Bags of Nails 7 5, 000 35, 000 12 Iron Benders Workmanship - - 200, 000 13 Load of 30 tones of granite 3 130, 000 390, 000 14 Load of 20 tones of sand 6 60, 000 360, 000 15 Bags of cement 247 1, 650 407, 550 16 Casting of slabs & beams - - 250, 000 17 Bundles of 20mm PVC electrical pipes 15 2, 500 37, 500 18 Packets of 20mm couplers for electrical pipes 5 900 4, 500 19 Packets of 20mm 4 way boxes for electrical pipe 2 1, 000 2, 000 20 Electrician workmanship - - 50, 000 21 Cash on site with handling of materials to site - - 100, 000 22 TOTAL 4, 454, 750 |
Business To Business › Re: Red Brick making machine for sale. by adebaxton(m): 9:51am On Dec 23, 2015 |
location plz? |
Properties › Re: Builders In The House ? by adebaxton(m): 4:33pm On Dec 22, 2015 |
expect a detailed estimate in the evening. zuraking: Good morning everyone.
Please I am a young guy of 24 and I want to have my own little house next year by the grace of God.
Though my dad offered me a room % parlor BQ in our compound but I want to stay away from my family so that I can get my respect since I am the first.
I bought a cheap 1 and half plot of land in a local area in Ibadan two days ago and I want to build a room self contain or a small room and parlor for myself alone till God provide for me.
Please how much can finish the above plan till finishing. Just a simple house o no design since I will build a bigger one in future.
Help me with rough break down please in a cheaper way.
No aluminum roofing o 
Thanks |
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:18pm On Dec 22, 2015 |
will re arrange pictorial representation. |
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:04pm On Dec 22, 2015 |
POP
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 4:02pm On Dec 22, 2015 |
POP and Tiles Installation. Took me to Djeregbe in Port Novo in order to bring professional hands on deck Tiles: Sourced from Zematech and Construmart, Spanish and Turkisk. Doors: Turkish
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:58pm On Dec 22, 2015 |
Installation of Doors and Windows
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:55pm On Dec 22, 2015 |
Pre Screeding and Internal Finishes on going
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:15pm On Dec 22, 2015 |
Pre Screeding of the internal and external walls+ erection of fence.
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:05pm On Dec 22, 2015 |
Lost my media files along the line.
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:04pm On Dec 22, 2015 |
More
|
Properties › Re: The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:02pm On Dec 22, 2015 |
Foundation:
|
Properties › The Start To Finish Of The 4bedroom Duplex @opebi,ikeja On A 320sqm Land. by adebaxton(op): 3:01pm On Dec 22, 2015*. Modified: 12:04pm On Jan 31, 2017 |
Initial Plan: 5 bedroom Duplex Final Plan: 4 Bedroom Duplex to Client's Specification. Completion August(Carcass) Finishes: October-November 2015 Terms: Pay as we Build Location: Opebi, Ikeja.
Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com Location: Lagos & Ogun State
|
Properties › Re: Urgent Sale: Lekki Phase1 4bdrms Duplex + Ikoyi 1 acre + Mowe, Ogun state 1 acre by adebaxton(m): 3:03pm On Dec 18, 2015 |
Why not come on Sunday and see us worship there, Our 1st service in the new auditorium starts these Sunday. lakeside50: 1). Location: Lekki Phase 1, close to the third entrance gate. Just behind the VFS office. Size of land on which house is built: 500sqmtrs. Type of building: 4 bedrooms fully furnished semi detached duplex having a 2bedrooms bq. All ensuite (5 toilets, 4baths). Dining section, spacious kitchen + store room, POP ceiling, tiled floors, parking space for as much as 6 - 8 cars etc. 2 bedrooms bq. Same finishing as above. Title: Deed of Assignment. Price: #150m. ***They are selling with the furnishing in the house eg the AirConditioners, Flat screen tvs, 30kv genset, fridge & freezer, chairs, beds & dining sets etc. ***
2). Location: New Oko Oba/Abbatoir road. Opposite the Vet and Maple Wood Estate, Oko oba/Abbatoir road. Type of building: former bank building/premises on 3 plots of land. Title: C of O. Price: #200m.
*** Building to be sold with all the facilities including Transformer etc ***
Please call 08186161605, 07060495156 for more info/inspections. BlackBerry pin: 2C0E5627......
|
Autos › Re: Honda Accord For Sale 150K by adebaxton(op): 8:12pm On Dec 17, 2015 |
Kept it too, felt someone else might need it. It remains my 1st and beloved car. |
Autos › Re: Honda Accord For Sale 150K by adebaxton(op): 7:38pm On Dec 17, 2015 |
Good 2 go |
Properties › Re: Cost Of laying a bungalow Foundation by adebaxton(m): 5:12pm On Dec 17, 2015 |
Location and the specification which includes sizes of the rooms in the building goes a long way to determine an estimate for a project. squarelead: Pls I need the estimate for building a 3 bedroom bungalow, from the foundation level to the finishing. |
Properties › Re: 2.45million To Deck A Four Bedroom Duplex!is It Not Much?help! by adebaxton(m): 8:31am On Dec 16, 2015*. Modified: 12:36pm On Jan 31, 2017 |
RALPHOW: Please can somebody give me each breakdown of the required items for decking 5 Bedroom DUPLEX? Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: 2.45million To Deck A Four Bedroom Duplex!is It Not Much?help! by adebaxton(m): 8:30am On Dec 16, 2015*. Modified: 12:37pm On Jan 31, 2017 |
Do you have the floor plan and elevation indicating the dimension of the building? That will be helpful coupled with the location of the project.
Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Cost Of Fencing A Plot Of Land by adebaxton(m): 9:50pm On Dec 14, 2015*. Modified: 12:37pm On Jan 31, 2017 |
1890 blocks approximately. 60+60+120=240/3= 80 x2 = 160 blocks per course(coach) 160 x 10= 1600blocks Cross bonding blocks @ 240/10= 24 pillars x 10 block Do= 240 blocks 240+ 1600= 1,840 blocks + 40( breakage allowance) Total blocks: 1880 blocks 60 bags of cement 10 tons of gravel/granite 25 tons of Sharpsand.
Done this over and over for Nairalanders, check my moniker.
Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Quotations For Roofing 2 Bedroom Flat With Long Span Zinc by adebaxton(m): 7:14am On Dec 12, 2015*. Modified: 12:38pm On Jan 31, 2017 |
Do you know the actual dimension of the proposed building to be roofed? It goes a long way to determine the actual needed materials.
Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Urgent Sale: Lekki Phase1 4bdrms Duplex + Ikoyi 1 acre + Mowe, Ogun state 1 acre by adebaxton(m): 7:08am On Dec 12, 2015 |
Point of correction, That bank building was sold and bought by my church, I will advice you flag it down. Kindly make your confirmation. |
Autos › Re: Sold - Sold : American Spec 1999 Toyota Camry - Neatly Used. by adebaxton(m): 6:08pm On Dec 07, 2015 |
price? |
Properties › Re: What Will It Cost To Build? Material Detail Please by adebaxton(m): 6:04pm On Dec 07, 2015 |
We appreciate you Sir, It was a nice experience being of service to you. The motivation, inspiration and your humility are unrivaled. Your 1st time on site, you were in the sun with us. That's rare. God Bless You Sir. omoola007: Update on the project
Finally we completed the fencing portion of the project. Here is a final analysis of cost.
Perimeter in Feet 480 Perimeter in Inches 5760 Base Blocks 320 Block Needed 3200 Extra Block allowance 320 Less Pilar blocks 290 Estimated block 3,230 Actual Blocks 6inch at 130 Each = 3520 N457,600 Cement @1550 and 1600 = 114 N139,200 Number of Pilars 53 Cement Pilar @1,600 = 27 N43,200 Iron rod 12mm =53 Pieces N60,000 Iron rod 10mm =13 Pieces N15,600 Gate Iron Rod 16mm =8 Pieces N17,600 Wire = N3,000 Plank of wood frame @1,000 =40Pieces N40,000 Truck Granite =30 Ton N130,000 (About 10 ton left over) Truck Sharp Sand@26,000 =3 Trip N78,000 Truck Dagbolu Sand @18,000 = 3 Trip N54,000 Gate Swing @80k , Sliding @100k N180,000 Iron transport N10,000 Generator rental and fuel N3,000
Labor was negotiated in bulk but this is a rough estimate of the cost. Carpenter N20,000 Welder/Iron Bender N15,000 Brick layer @50 Per Blk N165,000 Labor @20 Per Blk N66,000 Foundation Excavation N20,000
Fence Total N1,517,200 Borehole Borehole N150,000 Water Tank base block N2,160 Water tank N26,000 Borehole security Iron N5,000
Borehole Total N183,160
Adebaxton - really impressed me on how he went about his work. He really made a commitment to get it completed without a hitch. I highly recommend him. He was able to solve issues onsite without dragging me into it. That was commendable |
Properties › Re: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:45pm On Dec 02, 2015 |
Taking Shape.
|
Properties › Re: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:44pm On Dec 02, 2015 |
Awaiting Suspended Slab.
|
Properties › Re: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:41pm On Dec 02, 2015 |
Done and Dusted
|
Properties › Re: The Ongoing Construction Of A 6 Bedroom Duplex @ Ebute/ipakodo, Ikorodu, Lagos. by adebaxton(op): 1:40pm On Dec 02, 2015 |
Septic Tank/Soakway
|