PropertiesRe: I Need Advice On The Estimated Cost Of This Duplex Please! by adebaxton(m):
Will advice you get an Architect to design a Building Plan based on your specifications.A Quantity Surveyor can give a detailed estimate while a builder can add/remove any needed quantity off it.
PropertiesRe: Construction Of A Twin 2 Bedroom Bungalow In Ibadan by adebaxton(m): 1:27pm On Jul 05, 2017
tevanso:
completion of foundation blocks and commencement of back filling
my one cent.
from the 1st pix, I suggest you add up 1 more course despite the land being sloppy, consider when the finishing will be done,flooring and water flow.
it looks lower.
SportsRe: Analysis On UEFA Champions League Semifinal Draw by adebaxton(m): 12:40pm On Apr 21, 2017
Laughing in Swahili, Real Madrid all the way.
PropertiesRe: How Much Will It Cost To Build The Foundation For This 3 Bedroom Bungalow by adebaxton(m): 7:54am On Apr 17, 2017
Following
TravelRe: Creepy Abandoned Places In Nigeria & Around The World: Stories Behind Them by adebaxton(m): 4:38pm On Apr 10, 2017
Amazing
PropertiesRe: Cost Of Building Foundation for a 4 Bedroom Bungalow In The East by adebaxton(m): 8:28am On Apr 09, 2017
Following
PropertiesRe: Help: Please How Much Will It Cost Me? Sketch Picture Attached by adebaxton(m): 11:25am On Apr 02, 2017
Walleh:
hello builder! How can you ascertain quantity and price of constructing this piece when you don't even have an architectural drawing yet? This is a totally wrong approach I must say
That's a rough estimation not a Quotation or BOQ.

A Rough Estimation can be done based on sketch and personal assumed dimension with reference to a similar experience.
PropertiesRe: Help: Please How Much Will It Cost Me? Sketch Picture Attached by adebaxton(m):
nuelsylves:
Please how much will it cost me to develop an architectural plan of this house?

Sketch Picture attached.
Construction of your sketch carcass from Foundation to Roofing.
Materials:
3,200 Blocks
5 Trip of Sharpsand( block setting)
Cement: 26 Bags( block setting)
Concrete Works( Column,Lintels,Flooring)
5 Trip of Sharpsand
5 Trip of Gravel
95 Bags of Cement
20 Length of 12mm Rod
8 Length of 8mm Rod
20 Softwood Board
15 Nos of Hardwood Purling
Nail: 1 bag of 3 inch

Material Cost: roughly 2 million ( Foundation to Final BlockWork Level)

Roofing: Depends on the height obtainable from the Architectural Drawing.

NB: Above is a rough estimation not a quotation not a standards BOQ.

A Rough Estimation can be done based on sketch and personal assumed dimension with reference to a similar experience
.


Bldr. Adebayo
08027277744

NB: Did a Country Home for a Nairalander @ Ugbene Village, Awka North,Anambra.
PropertiesRe: Quarter Plot Of Land For Sale In Igbogbo Ikorodu by adebaxton(m): 1:31pm On Mar 29, 2017
What's the dimension?
PropertiesRe: Should Kitchen And Bathroom Waste Go To The Septic Tank Or To The Soak Away by adebaxton(m): 7:10am On Mar 21, 2017
mufutau55:
Direct water of bathroom and kitchen to the Soak-away, the bottom will not be plastered so the water can soak under ground.
Direct the actual poo from the toilet to the Septic Tank, bottom will be well plastered.
Make their respective size according to the empty space you have.

Hajji Mufutau
You have said it all Sir.
PropertiesRe: Terrazzo Flooring by adebaxton(m): 9:43am On Mar 16, 2017
redcliff:
Hello House, Please I am looking for folks who are professionals in terrazzo flooring. I have searched the whole of the forum and I have not found any one of such. The ones I saw are really old posts and its difficult to contact them..
I have seen really nice terrazzos that have been made to look like granite and the lay was so neat and smooth on the floor. It was just a sight to behold and I am sure if these guys really up their game up, we should see Terrazzo coming back to grace our floors again. There are too many not so nice tiles out there these days.

If you are an expert in Terrazzo flooring or you know guys who do so, please drop you contact and I would call you. I have a 3 floor building and I want to floor it.
Do you have the floor plan or areas to be floored with terrazzo, kindly call or email me in order to provide a detailed estimate of materials and labor efficiently.


Call: 08058307787
access2m@hotmail.com
PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:44am On Mar 04, 2017
KingMicky3286:
Sorry for my typographical errors, i typed from a phone and the cursor cause they typo.... grin
Your observations are well noted, I appreciate.
PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 7:40am On Mar 04, 2017
KingMicky3286:
The Workers do not safety protective wears.... Look at the pictures of the worker even with the man on bare foot .... Please Engineers should teach their workers the need for safety at work so that the site will be a safe place for workers and the owner of the site too.
You are absolutely right. That's a part I do lay emphasis on too.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 7:36am On Mar 04, 2017
kopell:
This is life, everyone can see why good name is better then few Naira. Two of my oga's at the top came right away to defend these gentlemen reputation, and to assert to his name. Oga you may hire someone to do all the posting for you if you're to busy, so that many of us that may have not seen your job before, to have opportunity to do so.
Thank You Sir, Will give it a thought.
PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 10:18pm On Mar 03, 2017
mufutau55:
Welcome back Oga mi. What kind of Factory is this?

Hajji M.
A Recycling Plant.

How have you been Sir?
My humble regards to the family.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 9:49pm On Mar 03, 2017
I hardly find time to criticize, my message is not directed to any individual in particular.
Social Forums is just like an open market which another persons wrong can affect other people who are in the same field due to what might have transpired between other parties.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 9:47pm On Mar 03, 2017
kopell:
With due respect sir, why don't you show case your job here first for global scrutiny before criticizing other competence?
I do that, At a point I got so fixed up not until today that i just started a thread for the Factory Project for a Nairalander I started since mid last year.
PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:29pm On Mar 03, 2017
Update.

PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:27pm On Mar 03, 2017
Updates

PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:25pm On Mar 03, 2017
Rebars for the Substructure stage.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 8:21pm On Mar 03, 2017
Just trying to build up the threads, been very busy.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 8:21pm On Mar 03, 2017
EgunMogaji:
Seasons greetings Sir.

Hope you're well.
Been up and kicking.

A factory For a Nairalander at Ikorodu https://www.nairaland.com/3662091/ongoing-construction-factory-project-nairalander#54245174
and A Country Home for a Nairalander in Awka, Anambra State
PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:18pm On Mar 03, 2017
Updates

PropertiesRe: Ongoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op): 8:06pm On Mar 03, 2017
Excavation
Main Building
Gate House.

150mm Vibrated Blocks for the gate house as delivered.

PropertiesRe: Ongoing Fencing Project For An Amiable Nairalander @ Maya, Ikorodu. by adebaxton(op): 8:00pm On Mar 03, 2017
Opened a new thread for the main building project.
PropertiesOngoing Construction Of A Factory Project For A Nairalander @ Ikorodu, Lagos by adebaxton(op):
Land Size |Length: 36.6m, Breadth: 36.6m
Project Status | Ongoing Development:
Budget | Confidential
Start Date | May , 2016 Till Date
Client | A Nairalander.


Smattad Homes,
Reach Us: 08058307787
BBM:
Smattad@yahoo.com
Location: Lagos & Ogun State




NB: Project is @ 80% completion presently. Will update pictures starting from the scratch to its present stage.

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by adebaxton(m): 7:35pm On Mar 03, 2017
olawale100:
I am writing this review not to cast aspersion on anybody's character but to guide and inform would be (future) clients on the likely quality of service they may get when you engage Engr Osaz – real name Osazuwa Enobakhare
I wanted to do pile foundation for a property at Ikate Elegushi, Lekki area of Lagos.
I got three quotes from nairalanders and after careful analysis and comparison, I decided to go with Engr. Osaz. I must confess my decision to go with Engr. Osaz was after reading the nice review written by one of his client, a medical doctor about the good job Engr. Osaz did for him at Isheri and also because he repeatedly stated that he is a structural engineer and will ensure the project will be properly & personally supervised.

After initial discussion and a quote was sent, I requested for a contract, he mentioned it won’t be necessary because the job is not that “big and serious”.
He sent his quote and I did not negotiate at all because I believe I am getting a value added service after Engr. Osaz assured me that he being a structural engineer will ensure the project is properly supervised and handled.
After mobilizing him with about 25% of the project cost, he came to site with some equipment, I enquired from him where the drilling machine is, I was shocked when he said he will use hand drilling option. I informed him I am not comfortable with this option because the piles are 10 meters deep, and 450mm diameter for 45 pile points. At no time did he specified that hand drilling will be used. Lesson learnt is that when dealing with people, there should be no assumption at all.
He reviewed the cost upward. At that time I was not willing to go ahead with him again. He had dug a borehole (I agreed to provide the submersible pump). I informed him that he should deduct the cost of the borehole and transport for the hand drills. I stated categorically that I will only use mechanical drilling machine, he said he review the cost and get back to me. He reviewed the cost upward by 300k. I perused and informed him he should just refund me less borehole and transport cost, he later sent another email that he has reverted to the original quote.
At this point, I sensed it may be difficult and hectic to retrieve money from Engr. Osaz without it getting ugly or resulting to waste of time, I decided to go ahead with him. He requested for additional funds. I was not willing to part with more funds without seeing the drilling machine on site. He persuaded me that once I move the funds to him, he will bring the machine and move to site and ensure there is good progress on the project. After paying him, it took about two days for him to bring the machine to site. I lost my cool and reached out to him. I practically called him about 2o times within a period of 5 hours, his phone did not go through, always going to voicemail.
Eventually, the next day, they started drilling, I got to site, I could not see any casting machine, I asked Osaz, Osaz said they will use dry mix. I have a supervising engineer on site who at this time became so furious and refused to allow work to proceed until a casting machine is brought to site. Osaz refused to provide a casting machine, stating the cost will be borne by me. I made arrangement for 6 days for casting machine and operator. I paid from my pocket for this. At this point, Osaz had been paid about 78% of the project cost.
My supervising engineer is always on site and was not happy with the handling and execution of the project. Osaz apparently subcontracted the drilling job to someone else and was not there to supervise as he had promised. About the 4th day, 26 pile points had been drilled and casted.
On day 5, Osaz came late in the evening to site and was having challenges paying the caster 10,000. Nobody was supervising the casting process. He charged me over 3 times of what he was paying them. My engineer informed me about this and I was really upset.
I came to site the next morning, the caster informed me that the casting crew are not happy with the rate Osaz is paying them, they had casted 5 points the day before and each of them got 1,000 each. I arranged 6 workers, promised to pay them 2,200 per point, bought shovels and decided to take over the casting as I was really disappointed with the way Osaz was going about the project.
In the Afternoon, I got the greatest shock on this project, the drillers down tooled, Osaz had only paid them for 20 points and they were supposed to be paid for another 20 points before they can proceed. I had to breach protocol, I engaged the drillers because I cannot afford my project to be stalled. (I am also paying for the casting machine on a daily basis) I enquired how much is being owed for the remaining 25 pile points. They told me it is 375,000. I moved 300,000 to the owner of the drilling machine and he immediately directed his boys to commence work. Osaz was no where to be found, he was incommunicado. He had the effrontery to call me and tell me cock and bull stories. I told him I have left him to God but I just had to let people know the type of person this guy is.
AT the end, I paid for the concrete job for the last 12 points, I paid the drillers a sum of N375,000
Net, I lost some money but not so much, Osaz abandoned the job after he had collected a huge chunk of money from me for the project.
He stopped coming to site altogether and most painful is when you call him and his phone does not go through. His is the most irresponsible behavior I have seen in a “professional”. I told him that most of my artisans that are not educated are more reliable and protect their reputation better.
Osaz is not a man of his words, as a feedback, I will never engage Engr Osaz again and if I know anyone that is interested in engaging him, I will advise the party accordingly.
That is my personal experience with this man
Been in the construction field with diverse experience on and off nairaland... served so many Nairalanders till date, I find it so difficult how individuals come in here portraying themselves as Engr,QS,Architect without being certified or even qualified in any way.
It's time, We all make proper consultation on any so called contractor on Nairaland and beyond.
PropertiesRe: Request : Estimate For Chain Link Fence by adebaxton(m): 7:29pm On Mar 03, 2017
olawale100:
I am writing this review not to cast aspersion on anybody's character but to guide and inform would be (future) clients on the likely quality of service they may get when you engage Engr Osaz – real name Osazuwa Enobakhare
I wanted to do pile foundation for a property at Ikate Elegushi, Lekki area of Lagos.
I got three quotes from nairalanders and after careful analysis and comparison, I decided to go with Engr. Osaz. I must confess my decision to go with Engr. Osaz was after reading the nice review written by one of his client, a medical doctor about the good job Engr. Osaz did for him at Isheri and also because he repeatedly stated that he is a structural engineer and will ensure the project will be properly & personally supervised.

After initial discussion and a quote was sent, I requested for a contract, he mentioned it won’t be necessary because the job is not that “big and serious”.
He sent his quote and I did not negotiate at all because I believe I am getting a value added service after Engr. Osaz assured me that he being a structural engineer will ensure the project is properly supervised and handled.
After mobilizing him with about 25% of the project cost, he came to site with some equipment, I enquired from him where the drilling machine is, I was shocked when he said he will use hand drilling option. I informed him I am not comfortable with this option because the piles are 10 meters deep, and 450mm diameter for 45 pile points. At no time did he specified that hand drilling will be used. Lesson learnt is that when dealing with people, there should be no assumption at all.
He reviewed the cost upward. At that time I was not willing to go ahead with him again. He had dug a borehole (I agreed to provide the submersible pump). I informed him that he should deduct the cost of the borehole and transport for the hand drills. I stated categorically that I will only use mechanical drilling machine, he said he review the cost and get back to me. He reviewed the cost upward by 300k. I perused and informed him he should just refund me less borehole and transport cost, he later sent another email that he has reverted to the original quote.
At this point, I sensed it may be difficult and hectic to retrieve money from Engr. Osaz without it getting ugly or resulting to waste of time, I decided to go ahead with him. He requested for additional funds. I was not willing to part with more funds without seeing the drilling machine on site. He persuaded me that once I move the funds to him, he will bring the machine and move to site and ensure there is good progress on the project. After paying him, it took about two days for him to bring the machine to site. I lost my cool and reached out to him. I practically called him about 2o times within a period of 5 hours, his phone did not go through, always going to voicemail.
Eventually, the next day, they started drilling, I got to site, I could not see any casting machine, I asked Osaz, Osaz said they will use dry mix. I have a supervising engineer on site who at this time became so furious and refused to allow work to proceed until a casting machine is brought to site. Osaz refused to provide a casting machine, stating the cost will be borne by me. I made arrangement for 6 days for casting machine and operator. I paid from my pocket for this. At this point, Osaz had been paid about 78% of the project cost.
My supervising engineer is always on site and was not happy with the handling and execution of the project. Osaz apparently subcontracted the drilling job to someone else and was not there to supervise as he had promised. About the 4th day, 26 pile points had been drilled and casted.
On day 5, Osaz came late in the evening to site and was having challenges paying the caster 10,000. Nobody was supervising the casting process. He charged me over 3 times of what he was paying them. My engineer informed me about this and I was really upset.
I came to site the next morning, the caster informed me that the casting crew are not happy with the rate Osaz is paying them, they had casted 5 points the day before and each of them got 1,000 each. I arranged 6 workers, promised to pay them 2,200 per point, bought shovels and decided to take over the casting as I was really disappointed with the way Osaz was going about the project.
In the Afternoon, I got the greatest shock on this project, the drillers down tooled, Osaz had only paid them for 20 points and they were supposed to be paid for another 20 points before they can proceed. I had to breach protocol, I engaged the drillers because I cannot afford my project to be stalled. (I am also paying for the casting machine on a daily basis) I enquired how much is being owed for the remaining 25 pile points. They told me it is 375,000. I moved 300,000 to the owner of the drilling machine and he immediately directed his boys to commence work. Osaz was no where to be found, he was incommunicado. He had the effrontery to call me and tell me cock and bull stories. I told him I have left him to God but I just had to let people know the type of person this guy is.
AT the end, I paid for the concrete job for the last 12 points, I paid the drillers a sum of N375,000
Net, I lost some money but not so much, Osaz abandoned the job after he had collected a huge chunk of money from me for the project.
He stopped coming to site altogether and most painful is when you call him and his phone does not go through. His is the most irresponsible behavior I have seen in a “professional”. I told him that most of my artisans that are not educated are more reliable and protect their reputation better.
Osaz is not a man of his words, as a feedback, I will never engage Engr Osaz again and if I know anyone that is interested in engaging him, I will advise the party accordingly.
That is my personal experience with this man
Been in the construction field with diverse experience on and off nairaland... served so many Nairalanders till date, I find it so difficult how individuals come in here portraying themselves as Engr,QS,Architect without being certified or even qualified in any way.
It's time, We all make proper consultation on any so called contractor on Nairaland and beyond.
PropertiesRe: Kindly Help With A Brief Cost Breakdown On Casting Slab by adebaxton(m): 8:23am On Feb 07, 2017
Will be right back
PropertiesRe: What Can I Build On This Land? by adebaxton(m): 8:50am On Jan 26, 2017
Alajiki:
Experts in the house,

Please I need your candid advice on this. I just acquired the parcel of land shown on the attached survey plan. I am contemplating building a bungalow consisting of 2 units of 2 bedroom flats and 4 units of room and palour self contain while still leaving enough parking space. Can this be descent and appealing to prospective tenants?
The location of the land is a determinant for the prospective of the types of tenant. The land will accommodate the 2 nrs of 2bedroom Upstairs and the 4Mini flats on the ground floor with 4 cars parking space.
My advice allow an Architect draw 3 types of plan considering the ventilation system for the apartments on the ground floor.

I want all apartments to be on the zero floor. No storey building.
PropertiesRe: How Much To Build 3 Bedroom Bungalow At Oke Afo Area by adebaxton(m): 7:13pm On Jan 16, 2017
Bullet1234:
Out of curiosity, can the experts in the house... give me rough estimate for a 3bedroom bungalow on a half plot in Oke Afo area in Lagos. Thanks
Oke Afa in Isolo or Oko Afo in Badagry?
PropertiesRe: What Would Be The Cost Of Building A 4-bedroom Duplex Now In Abuja by adebaxton(m): 7:57am On Jan 15, 2017