Properties › Re: Request : Estimate For Chain Link Fence by adebaxton(m): 7:29pm On Mar 03, 2017 |
olawale100: I am writing this review not to cast aspersion on anybody's character but to guide and inform would be (future) clients on the likely quality of service they may get when you engage Engr Osaz – real name Osazuwa Enobakhare I wanted to do pile foundation for a property at Ikate Elegushi, Lekki area of Lagos. I got three quotes from nairalanders and after careful analysis and comparison, I decided to go with Engr. Osaz. I must confess my decision to go with Engr. Osaz was after reading the nice review written by one of his client, a medical doctor about the good job Engr. Osaz did for him at Isheri and also because he repeatedly stated that he is a structural engineer and will ensure the project will be properly & personally supervised.
After initial discussion and a quote was sent, I requested for a contract, he mentioned it won’t be necessary because the job is not that “big and serious”. He sent his quote and I did not negotiate at all because I believe I am getting a value added service after Engr. Osaz assured me that he being a structural engineer will ensure the project is properly supervised and handled. After mobilizing him with about 25% of the project cost, he came to site with some equipment, I enquired from him where the drilling machine is, I was shocked when he said he will use hand drilling option. I informed him I am not comfortable with this option because the piles are 10 meters deep, and 450mm diameter for 45 pile points. At no time did he specified that hand drilling will be used. Lesson learnt is that when dealing with people, there should be no assumption at all. He reviewed the cost upward. At that time I was not willing to go ahead with him again. He had dug a borehole (I agreed to provide the submersible pump). I informed him that he should deduct the cost of the borehole and transport for the hand drills. I stated categorically that I will only use mechanical drilling machine, he said he review the cost and get back to me. He reviewed the cost upward by 300k. I perused and informed him he should just refund me less borehole and transport cost, he later sent another email that he has reverted to the original quote. At this point, I sensed it may be difficult and hectic to retrieve money from Engr. Osaz without it getting ugly or resulting to waste of time, I decided to go ahead with him. He requested for additional funds. I was not willing to part with more funds without seeing the drilling machine on site. He persuaded me that once I move the funds to him, he will bring the machine and move to site and ensure there is good progress on the project. After paying him, it took about two days for him to bring the machine to site. I lost my cool and reached out to him. I practically called him about 2o times within a period of 5 hours, his phone did not go through, always going to voicemail. Eventually, the next day, they started drilling, I got to site, I could not see any casting machine, I asked Osaz, Osaz said they will use dry mix. I have a supervising engineer on site who at this time became so furious and refused to allow work to proceed until a casting machine is brought to site. Osaz refused to provide a casting machine, stating the cost will be borne by me. I made arrangement for 6 days for casting machine and operator. I paid from my pocket for this. At this point, Osaz had been paid about 78% of the project cost. My supervising engineer is always on site and was not happy with the handling and execution of the project. Osaz apparently subcontracted the drilling job to someone else and was not there to supervise as he had promised. About the 4th day, 26 pile points had been drilled and casted. On day 5, Osaz came late in the evening to site and was having challenges paying the caster 10,000. Nobody was supervising the casting process. He charged me over 3 times of what he was paying them. My engineer informed me about this and I was really upset. I came to site the next morning, the caster informed me that the casting crew are not happy with the rate Osaz is paying them, they had casted 5 points the day before and each of them got 1,000 each. I arranged 6 workers, promised to pay them 2,200 per point, bought shovels and decided to take over the casting as I was really disappointed with the way Osaz was going about the project. In the Afternoon, I got the greatest shock on this project, the drillers down tooled, Osaz had only paid them for 20 points and they were supposed to be paid for another 20 points before they can proceed. I had to breach protocol, I engaged the drillers because I cannot afford my project to be stalled. (I am also paying for the casting machine on a daily basis) I enquired how much is being owed for the remaining 25 pile points. They told me it is 375,000. I moved 300,000 to the owner of the drilling machine and he immediately directed his boys to commence work. Osaz was no where to be found, he was incommunicado. He had the effrontery to call me and tell me cock and bull stories. I told him I have left him to God but I just had to let people know the type of person this guy is. AT the end, I paid for the concrete job for the last 12 points, I paid the drillers a sum of N375,000 Net, I lost some money but not so much, Osaz abandoned the job after he had collected a huge chunk of money from me for the project. He stopped coming to site altogether and most painful is when you call him and his phone does not go through. His is the most irresponsible behavior I have seen in a “professional”. I told him that most of my artisans that are not educated are more reliable and protect their reputation better. Osaz is not a man of his words, as a feedback, I will never engage Engr Osaz again and if I know anyone that is interested in engaging him, I will advise the party accordingly. That is my personal experience with this man Been in the construction field with diverse experience on and off nairaland... served so many Nairalanders till date, I find it so difficult how individuals come in here portraying themselves as Engr,QS,Architect without being certified or even qualified in any way. It's time, We all make proper consultation on any so called contractor on Nairaland and beyond. |
Properties › Re: Kindly Help With A Brief Cost Breakdown On Casting Slab by adebaxton(m): 8:23am On Feb 07, 2017 |
Will be right back |
Properties › Re: What Can I Build On This Land? by adebaxton(m): 8:50am On Jan 26, 2017 |
Alajiki: Experts in the house,
Please I need your candid advice on this. I just acquired the parcel of land shown on the attached survey plan. I am contemplating building a bungalow consisting of 2 units of 2 bedroom flats and 4 units of room and palour self contain while still leaving enough parking space. Can this be descent and appealing to prospective tenants? The location of the land is a determinant for the prospective of the types of tenant. The land will accommodate the 2 nrs of 2bedroom Upstairs and the 4Mini flats on the ground floor with 4 cars parking space. My advice allow an Architect draw 3 types of plan considering the ventilation system for the apartments on the ground floor.
I want all apartments to be on the zero floor. No storey building. |
Properties › Re: How Much To Build 3 Bedroom Bungalow At Oke Afo Area by adebaxton(m): 7:13pm On Jan 16, 2017 |
Bullet1234: Out of curiosity, can the experts in the house... give me rough estimate for a 3bedroom bungalow on a half plot in Oke Afo area in Lagos. Thanks Oke Afa in Isolo or Oko Afo in Badagry? |
Properties › Re: What Would Be The Cost Of Building A 4-bedroom Duplex Now In Abuja by adebaxton(m): 7:57am On Jan 15, 2017 |
Following |
Properties › Re: Cement Increase by adebaxton(m): 4:37pm On Jan 09, 2017 |
EgunMogaji: Not sure if its going up on Monday but based on your post I went ahead and ordered 50 bags for storage.
I paid N2,350 in Ibadan today but paid N2,150 less than a month ago 
+++++
It is I, EgunMogaji aka Egun Anigilaje Oko Afusatu Olobe Iyo, His Excellency GburuGburu 2 of California, sitting pretty @ FTC. Again  Lolz, Ur Titles are rib cracking. Buying @ 2,400 presently. It was 2,200 last 2 weeks |
Properties › Re: Cost To Supervise A Foundation Of 2storey Building Of 6flats by adebaxton(m): 2:05pm On Jan 08, 2017 |
Where is the location of the proposed project. |
Health › Re: Atan Cemetery Shames The Dead Too [VIEWER DISCRETION ADVISED] by adebaxton(m): 7:48pm On Dec 31, 2016 |
An eye opener |
Properties › Re: Cost Of Building A 4 Bedroom Duplex In Ebonyi State by adebaxton(m): 7:25am On Dec 22, 2016 |
Roughly 13 Million for the Foundation to Roofing Level. |
Sports › Re: John Utaka Wins Japanese League Highest Goalscorer Award by adebaxton(m): 3:33pm On Dec 21, 2016 |
EdifiedCEO: Former Super Eagles striker, John Utaka was on Tuesday night during the Japanese Football League awards ceremony, given the highest goalscorer award for his wonderful season in the Japanese top flight- the J1 league, after he scored 19 goals for his club Sanfrecce Hiroshima.
He won the award together with Leandro of Vissel Kobe FC who also scored 19 goals.
Utaka took to his Instagram page to share photos from the ceremony.
With this award, Utaka, 32, becomes the second African player to win the award in Japan after Patrick Mboma, who won it in 1997 after scoring 25 goals for Gamba Osaka.
See photos below:
http://www.newshelm.com/2016/12/photos-john-utaka-wins-japanese-league.html That's Peter Utaka |
Sports › Re: John Utaka Wins Japanese League Highest Goalscorer Award by adebaxton(m): 3:32pm On Dec 21, 2016 |
That's peter not John |
Agriculture › Re: The Plantain City Project Ogun State by adebaxton(m): 2:49pm On Dec 04, 2016 |
Ffg |
Politics › Re: Reno Omokri Tweets Patriotic9jaboy's Comment About Him On Nairaland by adebaxton(m): 2:50pm On Nov 15, 2016 |
Wow, dats absurd |
Politics › Re: The Dilapidated State Of Sango rd. Lagos-abeokuta Expressway(pics) by adebaxton(m): 1:28pm On Nov 03, 2016 |
Thank God I had a foresight concerning that road. From Dalemo- Sango- Joju to Owode remains an eye sore for a federal road. |
Technology Market › Re: Used Gotv For Sale by adebaxton(m): 8:46am On Oct 17, 2016 |
justhelp: I have upgraded to Dstv this month so I have this 6month old Gotv Decoder for sale with remote and adaptor at give away price just 2k. Can pick it in Agege. Drop ur contAct |
Celebrities › Re: Photos Of Millionaire Who Abandons $230,000 Ferrari California On Flooded Road by adebaxton(m): 2:34pm On Oct 10, 2016 |
Absurd |
|
Properties › Re: I Need Estimate For Fencing 50ft X 100ft Or 460sqm Plot Of Land by adebaxton(m): 12:00pm On Oct 04, 2016*. Modified: 12:22pm On Jan 31, 2017 |
paking: I need estimate for fencing a plot of land 50ft x100ft or 460sqm at Agbowa, Ikorodu Lagos. I'm ready to start immediately interested person should post their estimate. Good Morning Sir, 100 ft X 2 sides = 200 ft Back: 50 ft Front: 50-12ft(gate allowance)= 38ft 200+50+38= 288ft/3ft= 96ft x 2 blocks = 192 blocks per course (3ft= 2blocks) 192blocks x 11 course=2,112 Nos of 6' Vibrated Blocks X 175 Naira: 369,600 Gravel: 15 Tons : 39,000 Sharpsand: 4 Trip x 29,000: 116,000 Cement: 68 Bags x 2,150 : 146,200 Water Provision* Material Total: 670,800 General Labor: 300,000 NB: Cross Bonding of the fence by blocks or iron rod is at your discretion. Option A: Blocks @ 3m interval 320 Blocks X 175: 56,000 Cement: 10 Bags X 2,150: 21,500 Total: 77,500 Naira Option B: Iron: 36 Length of 12mm X 1,800: 64,800 10 Length 8mm(stirrup) X 1,350: 13,500 I Roll of Binding Wire.: 6,500 16 Units of Softwood: 19,200 10 Units of 2by3 Hardwood: 4,000 Quarter Bag of 3' Nail : 1,750 Cement : 18 Bags x 2,150: 38,700 Total: 148,450 Naira Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Cost Of Building A Three Bedroom Flat In The North by adebaxton(m): 11:12am On Sep 19, 2016*. Modified: 12:22pm On Jan 31, 2017 |
sashx: Hey Nairalanders,
Can anybody assist with the average cost of bul in a simple three bedroom flat in the north. Below are the flow and roof plan. Thank you Budget: 4.8m for the carcass: from foundation to roofing( Finishing excluded based on your choice) Mail me for a proper breakdown for all stages involved till completion. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Cost To Build Four Bedroom Bungalow With Pent House In Mowe Area by adebaxton(m): 8:30pm On Sep 18, 2016 |
Currently executing a similar project for a Nairalander in his hometown in Awka, Anambra State.
|
Properties › Re: Cost Of Putting Tiles In My Apart by adebaxton(m): 11:48am On Sep 18, 2016 |
cheenway: Please u would like to know how much it will cost me to tile my apartment. I'm renovating the place so I intend starting from my parlour and if possible the kitchen. It is a room and parlour self contain. The size of the parlour is a little bigger than 12" by 16". I think dat z how it is calculated That's approx. 18sqm needed. Visit any tiles shop then get coverage of 18sqm, most are packaged @ 2sqm per carton or more. |
Properties › Re: Decorative Fence Ideas, Please Help With Suggestions! by adebaxton(m): 8:04am On Sep 17, 2016 |
Safety in a developing area is my priority, Make your fence high by 2.4m. The beauty of the structure would have been secreted. That gives a peace of mind. Install Electric Fence Wire, CCTV too. |
Properties › Re: How Much To Build A Hotel In Nigeria (lagos, Anambara, Owerri) by adebaxton(m): 7:43am On Sep 16, 2016*. Modified: 12:23pm On Jan 31, 2017 |
1st: Step choose a specific location. 2nd: Specifications: Swimming Pool, Parking Space, Recreational Areas and the numbers of rooms to be sited in the proposed structure. 3rd: Engage a team of Architect, Quantity Surveyor, Structural Engineer and Builder. 4th: Allow the Architect provide a drawing with reference to your specification in the 2nd step. 5th: The Q.S and Builder can now provide a BOQ and Estimate Respectively. 6th: Scrutinize material needed as specified. 7th: Go for Building Plan Approval 8th: Good to go.
For consultation and service.
Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Satellite TV Technology › Re: Why Hitv Collapsed by adebaxton(m): 5:57pm On Sep 09, 2016 |
Worth reading, I salute Toyin Zubair tenacity. Never stop trying. |
Car Talk › Re: What's The Oldest Car You've Driven by adebaxton(m): 9:12am On Jul 18, 2016 |
Proudly 87 Honda Accord still own it date, My 1st car though. |
Properties › Re: Minimum Days Required To Build 5 Bedroom Duplex by adebaxton(m): 9:22am On Jul 13, 2016*. Modified: 12:23pm On Jan 31, 2017 |
Tony2016: What is the minimum days required to build 5 bedroom duplex, including outside interlock. Well Finished in 4 months depending on availability of fund. Reach Us: 08058307787 Email: access2m@yahoo.com access2m@hotmail.com |
Properties › Re: Advice On Building A 3 Bedroom Bungalow by adebaxton(m): 8:43pm On Jul 12, 2016 |
skelefish: are u talking abt the four corners, that is just 4 pillars or 3m along the exterior wall? does this your 3m intervals column system apply to all bungalow, including those on dry land?
a bungalow to be built on a dry land, will have columns at 3m intervals, when it is not carrying parapet, what for? You never can say if the op wants that. Low cost doesn't mean just an anyhow building. |
Properties › Re: Advice On Building A 3 Bedroom Bungalow by adebaxton(m): 8:02pm On Jul 12, 2016 |
EgunMogaji: Mr. Ade, your reputation precedes you Sir.
Might you be chanced to educate the house on this astute thought process?
Thanks. In order not to compromise quality, I advice the corners of the outer wall to have a continuous column at every 3m intervals, it gives support to the building and also minimize any crack whatsoever. |
Properties › Re: Help On Estimate by adebaxton(m): 9:06am On Jul 11, 2016 |
chekasforchekas: Please can someone please help me with a total cost/ estimate of building a three story building in Enugu, please help a brother here, I have a land but need to build and finish not one year one block. Alright, Will try to assist in my own little way. Get a Building Plan first. |
Properties › Re: Advice On Building A 3 Bedroom Bungalow by adebaxton(m): 8:55am On Jul 11, 2016 |
larryblack007: The land is located at ayetoro-itele.... Any idea about the land there? I thank u all. Ayetoro-itele axis is more of a dry land, I advise you use pillars in your foundation then terminate some at the German floor but make sure the 4 corners of the house still maintain pillars continuously. |
|
Autos › Re: going by adebaxton(op): 10:45am On Jun 25, 2016 |
Alright |