Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:39pm On May 29, 2016 |
allCopacetic: Fantastic job chief, excellent delivery. the masonry work, is particularly very neat. And the roof gutter idea is just Ingenious. From a quick glance i'd say, it reduces the amount of roofing material generally needed, greatly reduces (if not totally) the chances of the wind blowing the roof off. There's little to no room for the wind to exert any upward or lateral force . and with conduit piping for the rain water, that eliminates the need for unsightly pipes running along the length of the building. Fantastic Thanks bros, you have really help me shed light on this issue. The parapet is made up of u shape concrete slab and beam around the perimeter of the house, then the roof slopes into the U shape concrete that is serving as a gutter, drain pipes are also connected at intervals to drain off the rain water. The floor is screeded to slopes towards the drain pipes. Roof Gutter and parapet is best for tall buildings, because of the higher wind pressure, also you need just a regular roof with falls on the four side. The roof cost is cheaper but the roof gutter is not friendly at all  |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:35pm On May 28, 2016 |
more and more
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:33pm On May 28, 2016 |
more of roof gutter
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:29pm On May 28, 2016 |
more pics of roof gutter
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:22pm On May 28, 2016 |
the roof carcass and covering
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:45pm On May 28, 2016 |
msogunro: How did you cap off the roof? Did you deck the roof or construct low angled roof tiles? The roof is within the parapet wall, the wall went all around the house. |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:24pm On May 28, 2016 |
kopell: Aventures we need to talk, I'll call you tomorrow. Thanks for the call sir, really appreciated. |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:51pm On May 17, 2016 |
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:38pm On May 16, 2016 |
more views
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:34pm On May 16, 2016 |
work update
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 7:26pm On May 02, 2016 |
allCopacetic: Great job Oga Aventures , We interfaced a while back, early last month i believe. I sent across the 8 Schneider distribution boards for this project. Came across this thread a number of times but as usual, I had no idea I was supplying to you or that the items were for this project. Enterpreneur is indeed a man of remarkable taste and very clear preference . I hope to make out time and visit this beautiful project before its completion. Glad to see the project is coming on great. God's grace and God's speed Thanks my broda. Your timely delivery and good price has no equal. Thanks once more. |
Properties › Re: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 8:55pm On Apr 26, 2016 |
stpat1: How deep do one need to dig for foundation of a 2 storey building? Not water logged area. Also, won't the foundation need to be chained? yoir structural engineer is in the best position to determine this because a lot of parameter deduced from his structural calculation and soil test report are needed to know thw best depth |
Properties › Re: Construction Ofsemi-detached Twin Duplex And Restructuring Of Bungalow In Magodo by Aventures(m): 7:40pm On Apr 23, 2016 |
Nice Job Good speed |
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 3:34pm On Apr 20, 2016 |
|
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 12:36pm On Apr 18, 2016 |
if you are the owner of this Truck come carry am now oooí ½í¸ |
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 9:49pm On Apr 16, 2016 |
Still available |
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 2:33pm On Apr 12, 2016 |
for sale |
Properties › Re: DIY Construction Of My House In PH. by Aventures(m): 2:26pm On Apr 12, 2016 |
VictorRomanov: Well I don't mean to criticize, just sharing what I know.
1stly The reason hollow blocks are used is 'cause the hollow in them prevents heat transfer thru conduction. That means a house build with a solid block would be hotter than that built with hollow,especially in our climate.
2ndly its the width of the block that actually spreads load, not how dense it is. That means wider area would be better. 9" width would be better than 6" width. Also your house would be heavier since u re using solid blocks, which would require deeper and wider foundation to spread the load.
3rdly, cost-wise, Moulding a 9" hollow block consumes less sand than a 6" solid block.
I don't know the rational behind your choice (maybe space conservation) and the work has commenced already, but consider these point for future projects. If space conservation is the reason, I suggest u frame the building, (I.e. construct the columns and beams first, then add 6" hollow blocks later). In that case the blocks don't bear any loads, just the columns and beams.
Thanks! I concur. Just in addition, this house may have been designed using a partition load based on hollow blocks. Also there could be some little challenges in running 4 inches pipes as conduit except the design has made a provision for duct. |
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 6:21pm On Apr 11, 2016 |
|
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 5:05pm On Apr 10, 2016 |
|
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 6:52pm On Apr 09, 2016 |
still on |
Autos › Re: Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 6:34pm On Apr 08, 2016 |
still on board |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:08pm On Apr 08, 2016 |
work progress pics
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:03pm On Apr 08, 2016 |
mufutau55: Wow! I love a honest review like the one above... I am surely following. Hajji M. seconded |
Autos › Reg. Toyota Tacoma 2000 Double Cabin For Sale. 1.5m by Aventures(op): 12:01pm On Apr 08, 2016 |
Dear all,
A Toyota Tacoma 2000 model for sale at 1.5 M asking. Features
Transmission: Automatic
AC : Chilling
Interior: Fabrics
Entry Port : Lagos Tin Can
Year of Reg: 2015
Engine: V6 Engine running perfectly and fuel efficient
contact 08023142108
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:53am On Apr 06, 2016 |
Thanks to you all. Really appreciate our amiable client for his comment.
We need the services of professional steel stanchions fabricator. pls post ur past job. i ll post the design on here shortly
Supplier of burnt brick external wall tiles. pls post sample here and ur rate |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 1:52pm On Apr 02, 2016 |
esoorita: In all honesty, there are only three builders on Nairaland. In alphabetical order, They are (1) Aventures (2) Segcymoor (3) Spyder. These are builders that has set the pace for others to follow. No controversies, no dirty games, no sharp practises in their dealings with clients. Gentlemen, keep up the good work! Aventures, you have done extremely well with this project so far. Thank you sir |
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 6:19am On Apr 02, 2016 |
large pics
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:12pm On Apr 01, 2016 |
setting of plastering gauge
Window fab in progress on site
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:11pm On Apr 01, 2016 |
more pics
|
Properties › Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:09pm On Apr 01, 2016 |
Hi All,
Sorry for keeping you all waiting for so long,.
Glory be too God the build is standing tall and we are about adding flesh and sinews to the carcass.
|
Properties › Re: Construction Ofsemi-detached Twin Duplex And Restructuring Of Bungalow In Magodo by Aventures(m): 9:03pm On Apr 01, 2016 |
Nice Speed, perfect Job. |