Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 4:05pm On Mar 04, 2018 |
Testing the electrical fittings
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:12am On Mar 04, 2018 |
sewage tank construction
500 Pcs of 9" blocks @160*500= 15pcs of 16mm Rod @ 3150 = 12 pcs of 12mm rod @ 1950 = 10 cps of 8 mm rod @ 1000 = 1/2 inch aggregate (4buckets) @ 67,000 1 trip of sharp sand = 11000 33 bags of cement in view = 79,200
Carpenter labour =__ Iron fitter = __ Masons = __ Mason servants =__ Cast servants = ___
Near Total. = # 314,850 { Labour not inclusive }
We intend to use old wood and other left over material to make up, provided it can serve the purpose effectively.
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 10:40pm On Mar 03, 2018 |
Nigranks: If you dey Lagos na you we for give this job to. We like your ways and work Thank you sir. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 10:38pm On Mar 03, 2018 |
Nigranks: Hey boss
Is 150k Ok for electrical cabling pulling in a 4 flats of 3 bed room.the guy is asking for 185k 150k Is fair. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 6:57pm On Feb 16, 2018 |
sako28: Nice Job. What the cost of the PVC ceiling and the manufacturing.
Thank you #64,000 plus It's a China product |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 9:25pm On Feb 15, 2018*. Modified: 6:49am On Feb 16, 2018 |
So far on this project....
|
Properties › Re: New 10 Flats Of 2 Bedrooms Construction In Onitsha City by dubemcapital(m): 8:47am On Feb 15, 2018 |
spyder880: Forming the last floor. ....... well-done, good job sir. � |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 8:25pm On Feb 03, 2018*. Modified: 6:18am On Feb 06, 2018 |
Taking the compound level with the excavated soil from the septic tank. ...saving cost
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 2:31pm On Feb 01, 2018*. Modified: 6:37am On Feb 05, 2018 |
Looking differently... the house would have been better on 3 colours but we need to carefully consider the untarred dusty road just in front of the house. ( so we are looking for the untarred street road similar colour  pls bear with us)
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 2:23pm On Feb 01, 2018 |
So far on septic tank.... We stopped at 12ft (dept) because of the Rocky nature of the ground
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 12:17am On Feb 01, 2018*. Modified: 6:44am On Feb 01, 2018 |
Rounding off with tilling... I prefer skirting with tile trim.
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 8:40pm On Jan 31, 2018 |
dubemcapital: Having concluded the needful via finishing, painting is next in the list...
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 9:41pm On Jan 29, 2018 |
Having concluded the needful via finishing, painting is next in the list...
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:07am On Jan 29, 2018 |
adewaleID: More grace my brother, keep up the good work Sure. Thank you sir. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:06am On Jan 29, 2018 |
spyder880: Good work, I trust cometstar cables. Yes very well, it's a good one. Thank you sir |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 8:09pm On Jan 28, 2018*. Modified: 8:41pm On Jan 28, 2018 |
Memejem: Please what was the cost of labour for the electrical cost of this building.
A family member received a quote for 350,000 for a buglaow with a penthouse.6 rooms total and they priced 350,000. Originally 450,000. I feel like
that is too expensive. It’s for conduit wiring. And this labour cost doesn’t include wiring oo. Just the piping and fittings #350,000 ? Well there are some electrical engineering companies that charge higher than that, but I think is for the client to know if that is what he want. The charge for the electrical work for this project is approximately #150,000 to finishing. ( including thunder arresting installation and earthing) The electrical Fittings cost about : #242,000 While the wire (Comet star) cost about : 628,000 (but we have some coils remaining) Conduit pipe and boxes cost : (can't place it now) Totaling : #1,020,000 (excluding conduit pipe and boxes) |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 5:06pm On Jan 25, 2018 |
The septic tank is getting tougher every day yet not up to 8ft and we aim 14ft , the excavators advice we should dump some water in there, in view to soften the land. It was funny but I later bought the idea to see what the outcome will be like. After the exercise the ground seem harder 
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 6:58am On Jan 23, 2018 |
[sub][/sub][img][/img][size=8pt][/size] spyder880: Good work. Getting much better with neat and quality finishes. Keep it up. Thank you sir. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 6:53am On Jan 23, 2018 |
Oju4190: Gud afternoon Sir,pls is it advisable to build a Soakaway/septic tank at the front of ones house that car can drive or park on top.My builder advice me to do it but am not too comfortable with it. Ur opinion will be appreciated... tanjs It can be built in front of the house with a good reinforcement and quality casting such that heavy duty vehicles can run or park on it. Its usually last option However, if there is no cogent reasons Eg: lack of space or water logged land Etc. I advice you avoid it, because it's cost intensive. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 6:02pm On Jan 20, 2018 |
buzzetin: Thank you sir
Tile has front, sides and back, and when all the tiles are not facing one direction they (the tiles) must not be uniformly in line. It will look like some are bigger with some centimeters.
However, behind the tile you will see an arrow, the arrow is meant to face one direction. Educate your tilers for excellent job if you want a very good tilling job because 99% of tilers don't know about this. You are welcome sir |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 6:00pm On Jan 20, 2018 |
Dieumerci: Neat job.
Well done sir. Thank you sir |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:55am On Jan 18, 2018*. Modified: 6:43am On Jan 19, 2018 |
Pvc ceiling is on, but not a good idea for a pvc ceiling to be fixed before wall tiles it should be the other way round.
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:45am On Jan 18, 2018 |
Electrical finishing
Some will done now while some will be after the painting for a better results
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:34am On Jan 18, 2018 |
Septic tank and Soak away.
Size : 12ft width by 17ft length by 14ft depth.
But will cut the soak away at 10ft then continue with the tank down to 14ft. Please stay with us.
|
Properties › Re: Construction Of Flats In Owerri (new Dimension To Nigerian Architecture) by dubemcapital(m): 1:17am On Jan 14, 2018 |
skimanski: Painting of External walls Good job there, well done. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 4:41pm On Jan 13, 2018 |
We are done running the wire through conduit
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 1:00am On Jan 10, 2018*. Modified: 8:10am On Jan 18, 2018 |
OK, moving on to wall tilling now.
This tile is 25 by 40mm --- design code 5003
Because it has to be suspended on the wall with a light mortar till when it dry to glue to the wall parmernently, it needs to be so socked in water for 20mins or more in preparation for that.
|
Properties › Re: Tigerkenn Homes, Our Annual Summary Page by dubemcapital(m): 2:58pm On Jan 09, 2018 |
Excellent! More grace to you sir. |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 10:14am On Jan 09, 2018*. Modified: 10:30am On Jan 09, 2018 |
More pics of the floor tile
|
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:10am On Jan 09, 2018 |
adewaleID: Your costing proves you are a trusthworthy builder. Goodmen are few and far. Keeping up the good work we are following Thank you sir, all thanks to God |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 8:25pm On Jan 08, 2018 |
dubemcapital: Yes the labour is for, cast workers, masons, carpenters Iron workers is 235,000 +50,000 for electrician and plumber (As at that stage not for the whole project)
That is just the labour no need to make up what is not (my belief anyway)
The size of the slab is
Please I will communicate the size of the deck soon I need to reconfirm that. The size of the slab is : 8.016m by 16.946m or 26.3ft by 55.6ft |
Properties › Re: *** Building on an existing structure a storey Of One Bedroom (4 Flats)*** by dubemcapital(op): 7:05am On Jan 07, 2018*. Modified: 4:49pm On Jan 07, 2018 |
ceelog: Oga this labour cost seem small ooo. Is it for casters, Mason, plumber, iron fitters and the carpenter? Abeg what is the size of the deck? Yes the labour is for, cast workers, masons, carpenters Iron workers is 235,000 +50,000 for electrician and plumber (As at that stage not for the whole project) That is just the labour no need to make up what is not (my belief anyway) Please I will communicate the size of the deck soon I need to reconfirm that. |