Elengine's Posts
Nairaland Forum › Elengine's Profile › Elengine's Posts
1 2 3 4 5 6 7 8 9 10 11 (of 11 pages)
khattab008:Thank you for this response. Cheers |
Hello everyone I am very new here and I can see people talking about Cima here and there for Wes evaluation. My question is this, does Cima qualification give you additional mark and how do I claim it. My qualifications are HND, BSc, ACA, ACCADIPIFR, MSc accounting in view. I will appreciate response here. Thanks |
sonet:Please who can explain this to me, I work as a tax supervisor at one of the state internal revenue, which sector or job area can I claim for my work experience cos I didnt see anything tax |
edoman2016:OK sir. Sebi you will spend 6m for finishing abi. We are waiting for that kind of house. Please share with us how you are progressing. I will like to see it but on a serious note, if you spend 19m to finish it, you would begin to pay for maintenance cost two months after you park in |
The only difference between a duplex and 4 flats is that while they both have decking, the decking size might just be a bit bigger than that of duplex. Also the number of rooms will be more and that is purely blocks which is not expensive. 4 flats finishing sef may not be more than duplex because usually you want to rent it out and you may not do a superb finishing so to speak. So there is just little difference between a duplex and 4 flats bro |
Who is this person please? How can you say something like this? Please I was just reading through and I think I need to help people especially the new comers from being misled. Oga, firstly am chartered Accountant so I can tell you that I don't know about building by education but I just moved to my 4 bedroom duplex in July and I have been on property section since 2017. To get to a carcass like this won't cost you less than 13m naira. It is very simple. What is the cost of foundation plus German floor? Oga, to have a good German floor that will carry your house you would not spend less that 1.8m. To have a good decking you can't spend less that 2.5 or 3m. Iron alone 16mm is now 225k. Do you know the qty of 16mm, 12mm, 10mm you would use for decking and German floor. Roofing. Wood work plus logging and workmanship will take 800k while China gerrard will cost you about 1.5m plus workmanship. China roofing sheet in the market is about 2k to 2700 per sqm. Abeg my brother listen to professional oh. That was how someone said on property section that with 9m ony few things it will remain and I started thinking with my 12m I will almost finish. Hmmmm I spent 29m to complete the house. You will spend 100% of what brought your house to carcass to finish and that is if your taste is controlled. Enough for the wise hmohammed: |
davodyguy:See the line. Bit is as if the fence want to fall.
|
Hello my people. Please what is the problem here. The two are being seperately by what I don't know. Any remedy to this?
|
Are you on Instagram too? Your ID if yes |
Send your what's app no to me. I should paint my house in two weeks time. Fonyeri: |
Abeg o professional and experienced in the house. Which one is better between sweet homes WC / products and Choice. Help your friend oh |
Please tell them oh. That was how someone said 19m will build a 5 debroom duplex in 2018. Infact he said his friend started it and with 12m, he is already at finishing stage. Then I saw it and jumped at a 4 bedroom duplex with BQ. Today I ve spent roughly 25m and I have not moved in. Cabinet, painting, plumbing and electrical fittings plus compound flooring still remain���. Na so so then go dey deceive people up and down raymondFirstborn: |
Do it before tiling. But you need to bring your tiler and the people that will install it together to agree the space that will be left under the door. It must not be too much neither is it good to be short Nbg4real: |
Thank you for your comment sir. How would this save cost sir? Bruno85: |
Please when is the right time to paint house. Inner only please. Is it after everything has been completed including electrical fitting and plumbing? |
Prof and the experienced in the house. What can I do to avoid water leaking from my bathrooms on the ist floor to the ground floor. It is duplex and we have started tiling but someone said the bathroom may be leaking if I don't protect it now before it is tiled. He said no matter how good the tiler is, it will still leak. Pls I need advice. Thanks. |
Kindly add me on what's app too 08033725262 quote author=peterjero post=87751588]Kindly add me to the group 08134325407[/quote] |
Yes yes Adedward. Please can you give me his no. I need to start immediately Adedward: |
Good afternoon my oga in the house. Please who can recommend a good Tiler for me. It is a duplex and I plan to buy the tiles on Tuesday and work must begin on Wed this week. Location is Wawa after Berger before Arepo. Cheers |
How many sqm will your 20 litre paint cover for internal? |
I will even call you now quote author=elengine post=88236653]How much is the marble per sqm quote author=rotecch77 post=79377467] All measurement for tiles, marble etc, are same SQM. price depends on the type needed, there are varieties of it.[/quote] |
How much is the marble per sqm quote author=rotecch77 post=79377467] All measurement for tiles, marble etc, are same SQM. price depends on the type needed, there are varieties of it.[/quote] |
Professionals and the experienced in the house. Please who has used Ggc pop paint for screeding. I set out for glova paint but all I saw was Ggc pop paint and they are saying it is very good. I need people to share their experience. Thanks. |
Hello professionals in the house. Please I need clarification about American panel doors. Do I need to pre install wooden sub-frame before installing the panel door? Cause some are saying that the frames that come with the door is the only thing I need. Thanks |
Thank you for this Olazzeedris: |
Hello everyone. Please is it necessary to install sub frame installing America door or flush door? I e can I still install America panel or flush door without sub frame attached to each entrance |
How much is the one numbered 36305. quote author=write2obi post=83214526]30*60 waterproof glazed inkjet ceramic wall tiles. [/quote] |
How much do you screed with or without material. Thanks. quote author=emmadejust post=83984797][/quote] |
Please house. Which cement is better for screeding BTW dangote and Lafarge. [quote author=csiworksnig p |
[/quote]