The projects methodology is framed structure constructure and commenced from the dpc stage with placement of kickers of 75mm in height.
|
Continuation of first floor blockwork.... Placement of first floor colunm and lintel formwork
|
During the excavation process, some of the excavated pits got flooded by underground water. This prompted the request for a change request to enable us employ Reinforced concrete Grade beams to link the affected pad bases. After the approval of our change request. Excavation for the RC Grade beam with dimensions of 300mm x 450mm commenced
|
Continuation of excavation works.
|
Start of Reinforcement works The pad base varried from 3m x 3m to 1.5m x 1.5m. The reinforcement works for the colunm starter bars was also done.
|
The Excavation of the foundation commenced after the setting out operation. The foundation type employed for this project was isolated Pad and Strip foundation. Excavation of the isolated pad began buy excavating the individual pad bases down to a depth of 1.6m.
|
The project commensed with the setting out of the foundation by the project surveyor using surveying instruments and the working drawings. The project methodology is the constuction of a framed structure.
|
Project Title : Renovation of a 5bedroom duplex Project Location: Asokoro, Abuja Project Code : #AsokoroBuild Contractor : Harneyprojects ltd RC 781615 ( www.harneyprojects.com) Client : ****** Project cost: 65 million naira
|
Project Title: Residencial construction of a 5 beroom Semi-detached duplex in Gwarimpa, Abuja Project Location: Gwanrimpa, Abuja Project Code : #Balibuild2 Contractor : Harneyprojects ltd RC 781615 ( www.harneyprojects.com) Client : ******** Project cost: ******
|
Project Title: Residencial construction of 6 units of 5 bedroom terrace Project Location: Gwanrimpa , Abuja Contractor : Harneyprojects ltd RC 781615 ( www.harneyprojects.com) Client : ******** Project cost: ******
|
Harneyprojects:As built picture
|
Four bedroom duplex Project code : #SaphireBuild Construction diary : ******** Sits perfectly on a 50ft x 100ft plot of land Four bedroom duplex - 4 ensuite bedrooms Maid room Visitors toilet Main lounge Kitchen Dining room
|
Continuation of first floor blockwork
|
DankemzI:Thank you sir |
Great news. I have built several structures in Anambra, i can attest to the economic opportunities this Gas plant would bring along |
The building construction industry and residential realestate sector is growing which would translate to gdp growth. Alot of our clients are Diasporan which translate to dollar remittance to our eonomy. Harneyprojects is a buiding design and construction company, we have first hand experience of this growth. Check out this thread on a 950million naira project in Abuja, Nigeria https://www.nairaland.com/6836433/kugbobuild-construction-diary-mini-estate If Nigeria can tap it full potential, the sky is the limit. |
Harneyprojects is a building design and construction firm that has built several buildings accross the east expecially for our igbo Brothers and sisters living abroad, we worked in Anambra, omo, Ebonyi and Enugu. The hospitality of the east was incredible, beautiful women, fine food and beautiful culture. This is sad news if true. |
First floor blockwork
|
Hatesin:The reinforcement to be used is dictated by the structural design done by a structural engineer. Its might be possible to have 12mm rods in your ground floor columns for structures with little load specifications. But I do not trust the yield strength of Reinforcement sold in the Nigerian market, so i wont recommend having 12mm rods in colunms for building greater than 1 floor. The BS code specifies a strength of 460N/mm2 but Nigerian reinforcement have been found to have less than 390N/mm2. |
From sunrise to sunset #KugboBuild
|
First floor blockwork
|
Horlardorjah:Thank you sir |
Concrete Curing activities
|
First floor slab and beam concreting The concrete was mixed in ratio 1:1:1:4 1 bag of cement, 2 head pan of sharp sand, 2 head pan of stone dust and 8 head pan of gravel.
|
Harneyprojects: A block of 3 units of 2 bedroom flats and 6 units of one bedroom flats Each 2 bedroom unit has - 2 ensuite bedrooms 1 Visitors toilet Main lounge Dining Kitchen Each one bedroom unit has- 1 bedroom 1 toilet Main lounge Dining Kitchen
|
Reinforcement works
|
Reinforcement works and formwork
|
Formwork placement for the first floor slab and beams...
|
All structural first floor beams have a depth of 450mm. The structural reinforcement specifications is 3Y16 top, 3Y16 bottom with shear reinforcement spaced at 200mm C/C
|
After completion, we proceed to First floor slab/Beam construction commonly called "decking" |
Ground floor construction.....
|
Ground floor construction This involves ground floor blockwork, lintel/colunms formwork, lintel ironwork and concreting.
|