Harneyprojects's Posts
Nairaland Forum › Harneyprojects's Profile › Harneyprojects's Posts
From the stand point of a construction company, the middle income class that used to be our customer base as shrunked or fled to canada/UK. Something urgent needs to be done about the economy. |
May their sacrifise not be in vain. May God grant then eternal rest
|
The realestate industry would benefits heavely from infrastructure development in Abuja. |
May God Grant her the fortitude to bear the loss. |
Kpele |
Kuginzi:All the Building approval agencies in Nigeria need to be crammed, they are concerned about collecting bribes and have left out the part of their jobs that involves making sure the buildings being approved are fit for construction. They also fail to follow up during the construction process and action contractors who have contravened. There are cases where not a single Registered engineer is on-site to supervise the structural works which would later result in building collapses. There have been 150 building collapses in Lagos state alone since 2005 with resulting loss of lives and injuries. As a construction company we have first hand experience as to the uselessness of this agencies. |
Blinding of the trench and pad bases with 75mm concrete with mixed ratio 1:3:6 NB Blinding is the placement of weak concrete to level the excavation surface and prepare it to receive the Foundation concrete of higher concrete strenght and thickness.
|
Golan007: What is going on? They are gradually turning the sweet eastern Nigerian into another North Eastern Nigeria |
This is getting out of hand, We used to drive to Orlu to withdraw money while building a strcuture for a client in Isieke. |
Atleast 10 killed and many injured after a church collapsed in Asaba, Nigeria The building collapsed while evening service was going on resulting in death and injuries. The injured have been rushed to hospital and are receiving treatment. This collapse is coming after the building collapse in Lagos resulting in the death of many. Although cases of building collapse are not rapant in Asaba, building collapse in Lagos is endemic with reports of Atleast 150 collapses since 2005 resulting in deaths of hundreds of people. Use of substanded building materials and poor building construction practices can be blamed for this incidents ravaging the whole country. Something urgent as to be done by the government to save Nigerians from Dealth and injuries from Building collapse.
|
Second floor reinforcement work
|
We sha win this war and work towards rebuilding the north east. The reconstruction of the north east is not going to be easy but it must be done. |
Congratulations to them. I am into the business of building design and construction and with the current prices of materials, i know it s not easy to build mason like this at this time. Congrats to them. |
dachisom:Call/whatsapp : 08068396895 |
Things are getting out of hand. |
The breakdown of the moral Fibre of our society is ridicolous. I have constructed several buildings in Imo state and can clearly remember the neighborly love I felt there. We need to find our way back |
Resort Accommodation facility ( A-frame design) 1 ensuite bedroom 1 bedroom on a mezzanine floor Main lounge Dining Kitchen
|
More construction pictures
|
Compaction of the stonebase
|
Grading of the stonebase
|
Second floor slab and beam reinforcement work
|
Placement of stoneBase
|
Happy new year from the Harneyprojects team
|
Happy new year from the Harneyprojects team
|
Happy new year from the Harneyprojects team
|
Happy new year from the Harneyprojects team
|
Happy new year from the Harneyprojects team
|
Happy new year from the Harneyprojects team
|
Continuation of road compaction
|
Watering of the laterite to aid compaction
|