Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 12:36pm On Dec 12, 2020 |
Depressed101: thanks. What do I do. All the plumber I've called so far about 2 keep saying toilet equipment leakage. I've fixed all except 1 wc that is frequently running. What do you suggest I do now.. Don’t be depressed as your user name here.... There is a solution -is either you change the pipe that supplied water from the tanks into the building - or if possible you can dig up the pipe and check where the leakage is.... the hard way but not the only way out ... |
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 9:43am On Dec 12, 2020 |
Depressed101: Hello rotecch77 good morning, trust you are OK. Please I have a plumbing problem.
My water drains too fast. How do I detect where a leakage might be occurring. I've fixed all dripping equipment in the kitchen and toilet. The compound is German floored, can't see any leakage sign....
We are talking about 4 1800litres geepee tank getting finished in less than 18hrs while usage is minimal or sometimes none existence like yesterday when nobody was at home The problem is from supply pipe from the tank into the building, you might not be able to notice this bcs of the depth of the pipe on the ground |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 2:03am On Dec 12, 2020 |
More
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 1:58am On Dec 12, 2020 |
Second “L” plastering going on .... watch out for more details and pics |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 1:56am On Dec 12, 2020 |
Update pics coming soon |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:51pm On Dec 08, 2020 |
More update coming soon |
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 5:16pm On Dec 08, 2020 |
Still available |
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by rotecch77(m): 8:32pm On Dec 07, 2020 |
More coming |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 8:31pm On Dec 07, 2020 |
Update pics
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 12:27pm On Dec 07, 2020 |
folmus: It's looking beautiful. Thanks sir |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:38am On Dec 07, 2020 |
New week new deal, we are here to handle your project range from -architectural drawing - construction -renovation
08066619493 |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 6:16am On Dec 07, 2020 |
Fixing of bathroom appliances coming soon |
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 6:16am On Dec 07, 2020 |
Still active |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:15am On Dec 07, 2020 |
Beframia: Wow! This is so so lovely. Thanks so much Some info about the plastering of the L shape so far. —30 bags of cement used so far for the L shape side —ratio 1:4 used here — cost of whole external plastering 400k —- duration 8days... L shape side A only |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 2:35pm On Dec 06, 2020 |
More
|
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 7:50am On Dec 06, 2020 |
Work still in progress |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:48am On Dec 06, 2020 |
Happy wkd |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:47am On Dec 06, 2020 |
We are here for you |
Properties › Re: The Construction/finishings Of Abeokuta Country Home By Rotech77 by rotecch77(op): 7:46am On Dec 06, 2020 |
Keep watching |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:46am On Dec 06, 2020 |
Watch out for more |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:28am On Dec 05, 2020 |
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:24am On Dec 05, 2020 |
Loading |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:23am On Dec 05, 2020 |
More pics
|
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 7:20am On Dec 05, 2020 |
More
|
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 7:15am On Dec 05, 2020 |
More
|
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 7:14am On Dec 05, 2020 |
progress pics update
|
Properties › Re: The Construction/finishings Of Abeokuta Country Home By Rotech77 by rotecch77(op): 7:06am On Dec 05, 2020 |
Update will surface soon |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:05am On Dec 05, 2020 |
Work still in progress |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 11:35am On Dec 02, 2020 |
Plastering of the external area still in progress
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:31am On Dec 02, 2020 |
megacontrol: That's fine.
I'll be glad if you could just share the person's contact now as I'm already at the point of decision making on which route to use.
Thanks a mil. 0802 226 3632. Chuks Tell him from Rotech |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:51am On Dec 02, 2020 |
megacontrol: Do you have formwork for rental? If yes, just provide the rates and qty for the plan. i do not need an analysis unless you plan to that for public knowledge.
I will do the cost-benefit analysis myself for this project.
Pls let me know if you have or not.
Thanks May be I misquoted you in the earlier post. Anyway I don’t have for foundation now, but if you don’t get it on time let me know I will link you with someone around ajah axis. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:41pm On Dec 01, 2020 |
megacontrol: I'm still very skeptical about all the recent talk around formwork purchase being a waste viz-a-viz rental, this is largely because we've always used it multiple times.
So i'll like to use this floor plan of an upcoming work as case study. can you pls let me know the cost for: - marine board/plywood formwork rental + carpenter labour for installation and removal - steel formwork rental + labour for installation and removal
You may estimate internal dimension not shown. Location: Lekki Lagos
rotech77 or other person offering such service should feel free to quote as well. I will find time very soon to do the analysis here |