Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 12:20pm On Nov 12, 2020 |
bosman50: What's the Total cost for roofing of a three br flat in Benin? Here are the factors of hat determine the cost - type of roof materials.( Gerald, long span etc) - height of building -type of wood -size of the building if you can answer all these questions, I will give you the likely cost. |
Technology Market › Re: Used Haier Thermocool Fridge And Bruhm Freezer For Sale At Reduce Price by rotecch77(op): 12:14pm On Nov 12, 2020 |
bosman50: Is the freezer still available? Sold already Thanks |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 5:32am On Nov 11, 2020 |
rotecch77: Thanks for your time and support here.
Another finishings for New client in Benin is loading.
Some pictures of the materials to be used
Spanish / Nigeria made tiles Executive water closet. Shower cubicle Luxury kitchen sink Genuine England standing shower mixer And many more
Watch out ! New thread for this new project will surface soon Watch out |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:18pm On Nov 10, 2020 |
Electrical piping work done Pics coming soon |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:22pm On Nov 09, 2020 |
NL1960: following Big Boss, thanks sir Watch out for more |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 4:02pm On Nov 09, 2020 |
Watch out |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 4:01pm On Nov 09, 2020 |
Watch here for the new Benin project pics |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 4:00pm On Nov 09, 2020 |
Pics coming soon |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 9:29pm On Nov 08, 2020 |
Electrical and mechanical piping work for the slab is loading..... watch out |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:05pm On Nov 08, 2020 |
More update pics
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:51pm On Nov 07, 2020*. Modified: 9:17pm On Nov 07, 2020 |
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 1:47pm On Nov 07, 2020 |
Watch out for update pics here |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 6:08am On Nov 07, 2020 |
We are affordable |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:47am On Nov 07, 2020 |
Jumyg: Following. Weldone Rotech Thanks for your time and comment here. I really appreciate |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:46am On Nov 07, 2020 |
Sholapey: Amazing job weldone sir! Thanks so much sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:16pm On Nov 06, 2020 |
EgunMogaji2: They say this na isale eko type house  Oh my lagos |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:13pm On Nov 06, 2020 |
Badgers14: When a tiler says, 25 x60 tile..
I assume they meant length 25 x width 60.. is this correct?
Also what unit are the measurements , are they in mm or m. Like 25mm x 60mm or ? 25cm *60cm is (it always written this way 250mm * 600mm) on the cartons Italian do write in inches at time I.e 12 inches x 33inches at time ooo and it mean length and width |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:14pm On Nov 06, 2020 |
More coming soon |
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 8:13pm On Nov 06, 2020 |
0806661 9493 |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:12pm On Nov 06, 2020 |
On the way |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:50pm On Nov 06, 2020*. Modified: 10:20pm On Nov 06, 2020 |
Slab formwork done.
Materials and Labour cost 270k Plank Bamboo Labour Nail Transport
Our reinforcement for the slab is ready Next few days my iron bender will be done with it
12mm=124 length. (260k per tone) (2850 length 16mm =12 length 8mm = 15 length (1500 per length Binding wire = 1 bundle. 10k
Watch out for more details
|
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 12:32pm On Nov 05, 2020 |
Slab formwork is in progress |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:46pm On Nov 04, 2020*. Modified: 10:13pm On Nov 04, 2020 |
One4me: Respects Sir! The above does not solve the heat problem, l have experienced it before and l did exactly that, based on advice. It was a three storey building with the top decked with concrete, instead of roof. We keep our Generators and other things at the top and also take breeze there at night but during the day time, f[b]rom about 11am till 3am in the middle of the night[/b], you cant stay inside, even with A.C at full blast in the afternoons. I eventually have to moved out of the house because it was cooking me from the inside, so to speak. Damages everything, from Electronics, to leather Shoes. 
After many years, on a visit to a neighbour who persisted to live there, l saw that what they did was to install Polystyrene Insulators on the Concrete deck and this reduced the heat in the house drastically. The explanation was that the Concrete absorbs the sun's heat in daytime and gives it out from the evenings, till it finally loses that heat completely around 3am in the night. By gumming such insulators (those white, packing foam) on the Concrete, the Sun's heat is prevented from even reaching the Concrete so that it cant absorb it.
Doing POP "inside" the rooms wont stop the Concrete from absorbing the heat and it will still pour it out in the space between Concrete Ceiling the POP but the POP Ceiling cannot withstand the pressure build-up arising from the sealed space (if completely sealed), as the temperature in-between rises, it will eventually crack and breakdown. And if not completely sealed, the heat still escapes into the room (as in my own case!) and we were back to square one. within a few weeks, the POP was discoloured and cracking. and dont forget that the Concrete also transmits the heat to the walls because our walls get hot too.
The ultimate solution is one that prevents the rays of the sun from hitting that concrete. Roof it or insulate it Thanks so much chief for this. Actually I know of this polystyrene system but I do use it for damped problem although it can also protect heat.its good insulating material too. Somethings ago I used it for a member here to stop damps/ insulator on decking ( the upper area of the building wasn’t built then. Now let’s check some advantages and uses of pop (plaster of Paris) Advantages of Plaster of Paris: It is light in weight and more durable. It has low thermal conductivity. It is very good fire resistant and hence a very good heat insulating material. It does not shrink while setting. Therefore, it does not develop cracks on heating or setting. It forms a thick surface to resist normal knocks after drying. It mixes up easily with water and is easy to spread and level. It has good adhesion on fibrous materials. It gives a firm surface on which the colours can settle. It has no appreciable chemical action on paint and does not cause alkali attack. Plaster of Paris gives a decorative interior finish. Its gypsum content provides it a lot of shine and smoothness. It can easily be moulded into any shape. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 1:10pm On Nov 04, 2020 |
Dennis3D: Good idea, but... I will be a bit more worried about the staircase area that goes up to the upper floor (not completed), if not properly done, might lead to leakage and would be worrisome to the POP. Just my thought. That section( stir area) doesn’t need. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 11:27am On Nov 04, 2020 |
Update pics on the way |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:04am On Nov 04, 2020 |
Tezcatlipoca: Hello everyone, please I stay in a decked apartment but yet to complete the building on top of it and the heat is so unbearable. Is dere something that can be done or placed on top of the building to reduce the heat please? install pop underneath the decking. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 7:53pm On Nov 03, 2020 |
Watch out |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:52pm On Nov 03, 2020 |
Progress pics will surface soon |
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 9:02am On Nov 02, 2020 |
Coming soon |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 9:01am On Nov 02, 2020 |
New Benin project loading |
Properties › Re: Special Project For Special Man "Hajj Mufutau" by rotecch77(op): 9:00am On Nov 02, 2020 |
We are here for you |