Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:16pm On Sep 21, 2019 |
1st stage of the substructure Mech piping will follow immediately after this stage |
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 5:13pm On Sep 21, 2019 |
We resumed back to the site yesterday for the continuation. Pics update coming soon. Thank you all for your time here |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 6:58am On Sep 21, 2019 |
Final stage of the interior finishing coming soon |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:55am On Sep 21, 2019 |
Filling still in progress.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:35pm On Sep 20, 2019*. Modified: 7:45pm On Sep 20, 2019 |
Jeff68: GM, rotecch77,
I am a new member here, I have seen a lot of your build, I am impressed! I have project and I was quoted some prices for windows. I just want to check if he is being honest. The site is in Ibeju, I need your help, can you tell me the prices for casement windows with net and burglary for the following sizes:
1800 x 1200 3panel 1500 x 1200 3panel 1200 x 1200 3panel 600 x 700 600 x 1200 900 x 1500 and the accessories need to place the windows and possible installion cost. Remain Blessed! Aluminum window prices depends on the type of the materials used I.e Nigeria tower product, Nigalex, thick imported Aluminum, light gauge imported Aluminum. Nigeria Tower brand 1800x1200 cost btw 55-60k 1500x1200 Btw 50-55k 1200x1200 btw 40-45k 600x700 btw 20-22k 1200x600 btw 25-28k 900x1500 btw 40-45k |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:57pm On Sep 19, 2019 |
Earth filling in progress
|
Properties › Re: Free Leakage Test On Any Building Both Old And Ongoing Project By Rotecch77 by rotecch77(op): 7:25am On Sep 19, 2019 |
Still on |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 7:17am On Sep 19, 2019 |
Thank you all for your time here. Frontage Old fence demolition going on. Others work also in progress
|
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 9:32pm On Sep 17, 2019 |
Installations of water closet still going on, pics coming soon |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:29pm On Sep 17, 2019 |
Work in progress |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:22pm On Sep 17, 2019 |
Work still in progress
|
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 10:15pm On Sep 15, 2019 |
Contact us for Specially built Aluminum door for toilet.
Product specifications *Nigeria Aluminum frame. *turkish made key *5mm glass *cladding board.
Advantage over wooden toilet door *Non sagging *Non decay *Easy to clean *No repaint *Available in many colors
Each cost 32-37k Cost of the door plus installation within Lagos.
*Pvc Turkish made door for toilet also available* Price;60-65k. Cost of the door with installation.
08066619493
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:06pm On Sep 15, 2019 |
Contact us for Specially built Aluminum door for toilet.
Product specifications *Nigeria Aluminum frame. *turkish made key *5mm glass *cladding board.
Advantage over wooden toilet door *Non sagging *Non decay *Easy to clean *No repaint *Available in many colors
Each cost 32-37k Cost of the door plus installation within Lagos.
*Pvc Turkish made door for toilet also available* Price;60-65k. Cost of the door with installation.
08066619493
|
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 6:36am On Sep 15, 2019 |
Site update coming soon |
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 6:36am On Sep 15, 2019 |
08066619493 |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 6:34am On Sep 15, 2019 |
Specially made toilet door, water closet, Italian water heater and others accessories now at site for installation.
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:31am On Sep 15, 2019 |
08066619493 |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:30am On Sep 15, 2019 |
Casting of columns, earth fillings, will be the next line of action. Thanks for your time here |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:54pm On Sep 13, 2019 |
Pics
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 4:58pm On Sep 13, 2019 |
More coming |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:45am On Sep 13, 2019 |
Pics
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:14am On Sep 13, 2019 |
Almost done with the sub structure block settings |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 9:10am On Sep 13, 2019 |
Work in progress, window, wiring, kitchen cabinet etc
|
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 9:08am On Sep 13, 2019 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:17pm On Sep 12, 2019 |
bixton: More so why is it that professionals, consultants and contractors don't recommend, construct and build a tank system within the roof ( embedded within the roof wood work frame/inside the ceiling). Is it not cost effective in its entirety compared to the design and construction of an external tank stand? Yes, people use to do that, but to me I don’t like the idea because of the maintenance aspect of it. 1. If the tank is leaking you can’t know on time. 2. If you need to replace the tank( due to damage) it will be difficult to do so bcs you will need to remove the roof cover. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:29am On Sep 12, 2019 |
eddybongo101: Hello, please what is the estimated number of blocks required to build a four(4) Bedroom bungalow all en-suit, with two parlours, ante room, kitchen, store,dinning, laundry room. Best regards as i wait your response. Inconclusive info. Provide your drawing, QS will answer you and others professionals in the field from the forum here |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:27am On Sep 12, 2019 |
bixton: Okay. Well I think if anyone is trying the fly system then the tank should be as close as possible to the building itself as much as its structurally safe for both. It's ideal that pipe from the tank taking water to the building be less visible to on-lookers irrespective of the positioning or view of the building. This is just an assumption that whoever did the plumbing works offered his services from the beginning of the construction of the structure. Thereby the thought of one wondering what manner of person did such kind of work will not occur in his absence. You are right |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:44am On Sep 12, 2019 |
bixton: Do you do the "fly system" based on your clients informing you of their views or its your idea entirely? . At time it might happened that I met the building halve way (most pipe might’ve been berried inside slab) or on the roof already). Some might be from the drawing. Or at times I design it on my own. But let me say I like downward system mostly bcs if your tank is far from the building this system is the best. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:38am On Sep 12, 2019 |
earthrealm: ok, just as i tot, though i experience airlock, and its the downward approach method in the apartment Ok, but the airlock their might be from the size of pipe used plus if there are lot of elbow used for the supply pipe line. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:34am On Sep 12, 2019 |
beamNIGERIA: Flying cold water supply is rather vernacular, shouldn't there have been a booster pump. Thanks, booster pump can be used if you need more water pressure in your building, mind you not every piping system can withstand the booster pump pressure bar, more so you need constant light to make it function. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:34am On Sep 12, 2019 |
earthrealm: WHtas the advantage of the side pipping style, instead of coming down first...then going up again.highlighted in yellow
i think your style may increase water pressure, inside the house, would use less pipe. but its a bit unsightly, so pls educate us more on why u used that approach Everything/every system has merit and demerit Advantages of this system fly over ( upper connection supply) 1. It will reduce materials. 2. There will be water for both the upper and down floor of the building at the last bottom level of the tank water. Disadvantage 1. Their will be likely air lock once in a while( but once the taps are open within 2-10 minute it will be off). Advantage of direct downward system. 1. Air lock can not occur on this system Disadvantage 1. Once the water on the over head tank is low, the upper floor will experience low pressure of water Actually I use to do both, check the pics here we did down ward system for a nairaland member, Gbadex did the painting.
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:20pm On Sep 11, 2019*. Modified: 6:42pm On Sep 11, 2019 |
Work in progress
|