₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,627 members, 8,512,861 topics. Date: Wednesday, 04 November 2026 at 06:45 AM

Toggle theme

Rotecch77's Posts

Nairaland Forum › Rotecch77's Profile › Rotecch77's Posts

1 2 3 4 5 6 7 8 ... 191 192 193 194 195 196 197 198 199 (of 332 pages)

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 9:57pm On Mar 23, 2019
08066619493
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 10:01am On Mar 23, 2019
[quote author=Neweko post=7690683
7]Well done man, you smash it. lovely house[/quote]Thanks chief.
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 9:06am On Mar 23, 2019
08066619493
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
Update coming soon

WATCH OUT ! WATCH OUT !! WATCH OUT !!!

THE GENERAL FINISHING OF OSUN STATE EDIFICE

COMING SOON.
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by rotecch77(m): 4:54pm On Mar 22, 2019
adeniyisamuel59:
How many packs of tiles would I need for 22sqm shop, what is the price of Nigeria tile pack and how many are inside a pack ?
*Diff size diff package in a carton.
Just go to tiles store tell them your measurement (22meter)then pick the design you want, they will tell you the exact quantity.

Example 40x40 packed 12pcs in a carton which is 1.92meter.

Also 60x60 packed 4pcs which is 1.44m
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 4:40pm On Mar 22, 2019
More coming
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op):
Final pics of the entrance

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 5:38pm On Mar 20, 2019
mufutau55:
Plaster work like it's screeded already... that is what I called professional work.

Hajji M.
Oh I'm so exited with this comment sir.
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 11:06am On Mar 20, 2019
mufutau55:
Nice!

Hajji M.
Thanks so much sir.
Work in progress.

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
oalandAgents2:
nice pic follow my too
Thanks, no problem.

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 2:08pm On Mar 19, 2019
Site update pics

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 12:56pm On Mar 18, 2019
Thank you all for your time here.
After wkd we resumed back to the site today for the new week.
Pics update coming soon
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by rotecch77(m): 10:09am On Mar 18, 2019
New week new deal
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 9:33am On Mar 17, 2019
Work in progress

Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:29am On Mar 17, 2019
08066619493
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 5:04pm On Mar 16, 2019
More coming
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 5:18pm On Mar 15, 2019
More coming
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 5:17pm On Mar 15, 2019
Work in progress
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
Sittingroom, rooms and kitchen pics
Work in progress.


*kitchen wall surface plastered rough to received tiles.




We always check to see that workers clear the
surroundings and floor after each day activities bcs this is our second office.

Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 11:13am On Mar 15, 2019
225x225x450mm is 9" block
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
Work in progress
You dont need to break bank before you get all these done from us.

Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 9:27am On Mar 14, 2019
Morning to you all
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 8:43am On Mar 14, 2019
hapiness44:
God job sir

Please check the below link and contact us for anything furniture

https://www.nairaland.com/4545349/sister
Thanks for your time here.

Advert Noted
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 8:40am On Mar 14, 2019
mufutau55:
Very nice plastering. Another good finishing coming up.
Keep it up.

Hajji M.
We really appreciated your time, advise, referral etc.
May God Almighty continue to give you more strength and power to continue with your good doing.
Thanks so much sir.

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
soulchuks:
nice one follow my too
Thanks my brother

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:04pm On Mar 13, 2019
GoodFaith:
In Benin
one bricklayer and a services set 100 block ( bricklayer 3k ,service 2k)
to set 400 block will be 20k

20 bags for one? ---- Get real
to set 100 block is one bag of cement
To set 400 block let us say 5 bags

rotecch77@ take your time oh
The dude is getting robbed
Ok i hear you.
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 3:28pm On Mar 13, 2019
Work in progress

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 11:36am On Mar 13, 2019
Men at work..

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m):
shelliz:
Good day all. Please i need help, got this bill of quantity from an engineer for the construction of 2 septic tanks/2 soak away with decking. I think the cost is high, what are your opinions please? Is there a recent thread for septic tanks construction here? Thanks all


(60) 12mm rods @2100 unit price =#126000
(5) 8mm rods @unit price 1100 = #11000
(60) 1×12×18 wood @unit price = 2300 = #138000
40 bags of cement @unit price 2500 = #75000
7 tonnes of granite = #45000
half role of binding wire =#3500
Bag of nail #8000
20 bamboo @unit price 200 =#4000
(20)2×3 wood @unit price 1050 =#21000
2 trips of sand #50,000

Labour
Digging of 2 septic tanks/soak away #50,000
Setting of the blocks #48000
Plastering #48000
capenter (without decking work) #32,000
Labour for casting #36000
Welder (without decking work) 16000
To pour the decking of the 2 septic tanks #24000


Supervision #40,000

Total #775,200 + cost of blocks + cost of welder and capenter for the decking.



LOCATION : EDO STATE/BENIN CITY
I like most replied you have gotten so far here.

But if will look at this quote very well is not too much on high side as some people exaggerated it.
Although few of the items are slightly on high side.

A. The size of your suckaway and septic tank will determine the cost.

1.cost of digging 2 unit of complete suckaway/ septic tank in lagos range btw 25-30 for 1unit, means 50- 60k for the 2 unit.(your quote says 50k STILL GOOD RATE.

2.Setting of block for the 2 unit will cost you around . Let say each unit is 400 block x2=800 ×50each=40,000
Your quote says 48,000 SLIGHTLY OK this will based on the size of the Suckaway/septic tank.

3.Carpenter : here in lagos for each unit it will cost about 10-15 x 2uint 20-30 ( this depends on area)

4 Iron bender same as carpenter.

5 .labour for casting both the columns, beam, and slab for the 2 unit will cost around 25-35k ( this also depends on your location bcs some labour now charge 3k for casting and bricklayer 3.5k.

Material.

CEMENT; 40 bags of cement for the 2unit means 20bags for each unit (a) settings of 400 block, floor casting, beams, columns, slab with good ratio lats say ratio 1;2;4 i will say ( your quote of 40bags is PERFECTLY OK

REINFORCEMENT, .as i said ealier .the size of the septic tanks will determine this but something 35-40 lenght of 12mm will do the beam, columns, slab of the 2 units.(note this is for regular septic tanks and suckaway)

But if you are still not ok with him you can buy your materials

LET ME STOP HERE FOR OTHERS.
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:01pm On Mar 12, 2019
Watch out for more pics here
Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op):
More pics

Properties › Re: The Finishing Of Gateway Contemporary Duplex By Rotech77 by rotecch77(op): 2:45pm On Mar 12, 2019
Current update pics
More coming.

1 2 3 4 5 6 7 8 ... 191 192 193 194 195 196 197 198 199 (of 332 pages)