Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:57pm On Mar 27, 2025*. Modified: 8:22am On Mar 30, 2025 |
Ayohbk: Hello All, Thanks for your feedbacks. after several back and forth these are the costs paid and work have started already. Just dropping the information for anyone else who might need it.
Omo on Ile #1,350,000 Safety Commission. #200,0000 Town Planning Office. #200,000 These were paid Last weeks Then Labca were paid 1.3m. Tried to beat it down but they didn't agree. Even after the 1.3m they gave conditions that we should finish the work quick before they move their oga. Else we'll have to pay another Money if we stop and restart some other time.
Nigeria was really a country.
Thanks for your inputs. Cc diordaves acmebuilding Billions123 gabbytabby kopell and everyone else It’s good as you repotted back,people will learn one or two things from this, more so Materials Testing personal might show up oo |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:16pm On Mar 25, 2025*. Modified: 7:55pm On Mar 25, 2025 |
inze: . . . most likely.
Most of these fancy mixers are meant to run with a pressure pump as they have smaller inners for water flow. A client had similar experience and it's solution is getting quality "full-open" mixers n faucets. Usually don't come so fancy though but gets the job done. You can browse through Sweet-home product in your locality (not an advert) they mostly come in knobs-style open and close
@rotech would remember this also  Yes, I can remember the scenario then, you are 100% right with the way you explained those faucets/ taps Reason why it’s good to use full inner gauge gate valve for central toilet control to allow full pressure water supply into toilet and kitchen. Only that to get good quality now is very scarce,, instead we used stop cock mostly now and this doesn’t allow full water passage at a go. Pics 1, stop cock Pics 2 gate valve
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 11:47am On Mar 25, 2025 |
More pics from our ongoing project |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:45am On Mar 25, 2025 |
Our Ibadan project is also in progress
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:44am On Mar 25, 2025 |
Almost done with pop ceiling work here. Tiling and some wall screeding loading Watch out for more
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:38am On Mar 24, 2025 |
Still on the finishing aspect |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:36am On Mar 24, 2025 |
kopell: Please let gard people with right information. Every building as different history. If you see me write anything here is from my personal experience NOT them say I did it. I just finished one of his similar case I build the house in 94 with every government approve. Chose to renovate 2 years ago just like everyone else, government official show up asking for renovating permit, don't have one I thought its was a joke fast forward continue work. they can back few weeks later with stop work Order. As stubborn man I call my connection at the top in Alausa. He told me I should know better their are process I have to follow before I start now. He sent me back to the local branch, to continue the process. When they sent me the requirements I look at it as waste of resources on the old house I chose to bring down the house, that when the drama start all over, all those requirements which I follow through. I couldn't believe this people have so much time to come for inspection, from set back, checking if what we have on drawing is what we are building as we progress, on the project even till the roofing stange. So please if they don't come for you, don't think the dont work . You may just be lucky. If they caught you at the middle, trust me you will pay all those fees Baba you will not die untimely death, If we tell them they will say those Engr has come again with dubious way of supporting where they will see money to chop. What you said is 100% on point unless if you build in hidden area and they didn’t notice on time, once they notice it they will still serve you letter.. Even demolition has permit, let alone full renovation work. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:14am On Mar 24, 2025 |
Did you know that cost of electrical work in a construction project typically falls within a range of 3% -10% of the total project cost( this covered materials, labour, overhead charges) , depending on factors like project complexity, material choices, and location |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:59pm On Mar 23, 2025*. Modified: 5:41pm On Mar 23, 2025 |
FACTORS THAT INFLUENCE LABOR COST/RATIO
Several external and internal factors can impact labor ratios:
Project Complexity: Complex projects often require specialized labor, increasing costs.
Geographic Location: Regions with higher living costs typically see increased wages.
Market Conditions: Labor shortages or high demand can drive wages up further.
Project Type: Residential, commercial, and industrial projects differ in labor demands.
Technology Adoption: Automation and prefabrication can improve productivity, reducing labor ratios over time. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:03pm On Mar 23, 2025 |
kopell: Some of us care ooo. I will soon take front seat in your lecture room. Ramada Kareem, to all our muslims brothers and sister. Thanks baba agbalagba I will surely post it bit by bit |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:30am On Mar 23, 2025 |
Did you know that materials covered about 65-75pec of total cost of construction ?
This is for educational purposes only for who care to know
Watch out for more tips |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:58pm On Mar 22, 2025 |
Watch out for more update here |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:52pm On Mar 22, 2025 |
Did you know that cost of Labour covered about 28-35pec of the total cost of construction?
Anything above this is reap off
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:12pm On Mar 20, 2025 |
Finishing still in progress |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:10pm On Mar 20, 2025 |
|
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 9:12am On Mar 19, 2025 |
Arbo contractor Ltd |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:11am On Mar 19, 2025 |
Still available |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:10am On Mar 19, 2025 |
More pics update
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:07am On Mar 19, 2025 |
Valuepaints20: We are trusted and Quality guarantee company.
For quality your painting jobs
Call/whatsapp:08163862804
We bring quality to your doorstep nationwide. This looks nice as usual |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:06am On Mar 19, 2025 |
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:06am On Mar 18, 2025 |
Coming out gradually by gradually |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:02am On Mar 18, 2025 |
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:34am On Mar 14, 2025 |
Pics update
|
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 9:32am On Mar 14, 2025 |
Happy jumat to all Muslims that are here |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:31am On Mar 14, 2025 |
Stayed tuned |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 9:30am On Mar 14, 2025 |
ibadan project update
|
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 11:54am On Mar 13, 2025 |
Still available |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:54am On Mar 13, 2025 |
Pop ceiling still in progress in Bld 3 |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 11:53am On Mar 13, 2025 |
More coming soon |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:29pm On Mar 12, 2025 |
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:35pm On Mar 12, 2025 |
More loading
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:02am On Mar 12, 2025 |
Game house slab casting done
|