Spyder880's Posts
Nairaland Forum › Spyder880's Profile › Spyder880's Posts
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (of 1148 pages)
Scaffolding is any type of temporary structure, or supports built around a work area to aid workers to reach higher in relative safety to work on any ongoing new work, maintenance, or a cleaning process in a building structure. An example of a structure where scaffolding is usually done to support the work process is a home building project. Different kinds of workers will work on a scaffolding during the life of a home building project, masons, carpenters, plastering workers, screeding teams, electricians, painters and even cleaning workers will work on scaffolds from time to time. Scaffolding could be done on, and around every kind of building structure, be it residential, commercial or industrial buildings. There are a lot of materials that could be used to form scaffolding supports on a building project, they include; 1. Iron scaffolding 2. Aluminium scaffolding 3. Bamboo scaffolding In iron and aluminium scaffolding, there are fixed types, there are also adjustable types that are fixed with bolts, some are jointed by way of removal of the different components to move the scaffolding to another part of the work. In bamboo scaffolding, the scaffold is usually built by bamboo of different sizes nailed together by a professional, then additional work is done to provide more stability and firmness to the different components that make up the scaffolding. There is also the use of specially made straps to tie down the ends and joints of the scaffolding, there could also be the use of iron strips (binding wires) tied like ropes around each joint. All these are processes made to ensure the safety of bamboo scaffolding form works. It's usually advised that workers who will have to work on scaffolds are additionally provided with fastening tools to provide additional safety, and suspend workers mid air, in the event of accidental slips or falls. These fasteners come in the form of belts, ropes and suspenders that hold workers working at heights. One important thing to consider in a scaffolding is the nature of work that will be done, so that the right kind of spaces are provided in the scaffolding, while ensuring the safety of workers. Safety of workers should be the most important consideration above all else, ensure that your scaffolding works meets intentionally accepted safety standards. Think safety always. |
We want to do a scaffolding work around the blocks laid in this house, this scaffolding will aid us to work better around the high walls. We will be using bamboo scaffolds to create a strong frame to support our workers here. ...................
|
Taping of furniture fittings and appliances to prevent paint stains on them................
|
Front of the house.................
|
We are targeting a total headroom of about 3.6 meters.........................
|
We are doing a 10 course block height here before the lintels.
|
omanzo02:Good evening bro, long time. I took a much needed rest, I am back fully now. I know you mean water cistern, WC. All the brands you mentioned are good, ranging from 55k to 65k. But the ones of 100k and above have better flushing mechanisms. |
buzzetin:Thank you bro |
Repainting the inner walls of this house............
|
Our plan is to round off on the lintel height by tomorrow...........
|
And up ..............
|
hslbroker2:My main man HSLbroker, thank you Sir. |
Then the blocks started going up...........
|
More work on the forming of block wall lines....................
|
Today, we started working on the block walls of this ground floor. ...............
|
Today, my painter has started working on this house, starting from the exterior walls of the fence...............
|
Yesterday, we bought and moved some paints into this house, in readiness for the start of the painting.
|
We are back to complete the works at this house, we will be doing some touch ups on some uncompleted small works, wash out the whole house, and finally repaint the house, inside and outside. |
Still waiting for sharp sand here, some drivers promised to deliver some loads to this site today. |
isahkadir1:Thank you. |
Adedward:Thank you Ade, I trust you're still as efficient and trustworthy as always. Well done bros. |
We are set to commence the second stage of this work as from Saturday, we plan to start raising the block walls, forming the rooms and raising the columns around this house.this weekend. More updates later. |
We are already offloading more quality blocks to be used for the start of the ground floor walls of this house.
|
GreekDon:This foundation was planned to cost a little less than 14m. The modification we did in this foundation plan was threefold, adding 2 reinforced beams, and using only sharp sand to do the filling. We also had to raise the height of the foundation by about 450mm to beat the possibility of flooding in this area. The total money spent on this foundation is nearly double of the budgeted amount. We will be fighting to remain below the next budget as we plan to resume works here later this weekend. More updates later. Thanks. |
Although it has been raining since yesterday, we are still watching the concrete cast over the foundation as it cures. We will be pouring water on it to ensure proper curing. |
Standing on the completed portions...............
|
We later completed most of the concrete cast of this floor..............
|
Now, let's do what must be done................
|
While I seal the whole floor, i like to expose my column footings, so that the concrete we are going to cast will have direct contact with the starter bars....................
|
Spreading nylon sheets on the ground, for dampness prevention, and cutting off possible capillary movement of water to the lower walls of the house.
|
Working with the compaction machine ....................
|
We just brought a compaction machine to this foundation...................
|