There are only a few spaces left to be filled with sand .............
|
We are still offloading more trips of sand into this foundation........................
|
Sand filling still going on here, we filled 9 loads of sand yesterday............. |
Using water flow to settle the sharp sand deeper into the foundation..............
|
Different rooms showing different stages of filling, as we work to complete this filling process.................
|
We have been working on throwing more trips of sharp sand into this foundation,................
|
D1O:The current situation here is that works around this part of the town has been slow, owing to the bad conditions of the roads entering this area, especially in the rainy season. We haven't continued the development of more buildings. This morning, I sent one of my workers to go and check the conditions of the area and he reported that things are stable, with only one building being worked on by our neighbours. I am also on standby to build any type of structure any of the buyers here will need to erect. Buildings, BQ or fence. I also have lands here for sale, I will do well to advertise the lands with local agents to see if we can start up development here by letting new buyers to take up some lands here. Cost of land here is now N5m. Thanks. |
Richhard:Very good news. I was about to start ponding the foundation again when the rains started dropping. |
Sand filling still going on, heavy rain falling now. |
We continued to receive more filling sand, and continued to fill this deep foundation...............
|
Now, we start sand filling this foundation with clean sharp sand......................
|
Meanwhile, this was the evidence of more soil settlement the following day after we ponded the foundation. We will continue this process as we fill the foundation..................
|
We have continued to buy more filling sand and fill this deep foundation. Its difficult finding sand supplies now that the rains are here and roads are bad. But we are pushing ahead still, more updates later today. |
Richhard:Yes, there is a special tile for cement, and this is one of the different brands in the market. But our tilers sometimes have a mind of their own, since they didn't learn tiling work using this tiles adhesive, using it on site looks like a tall order for them. |
mekussa:Well explained, I have nothing to add, thanks. |
We will fill this level, watch the level with which this foundation soil settles, then fill 5he foundation some more and repeat the process till we are sure there no weak soils inside the foundation.
|
We are first going to fill this foundation with water, this is a process we call foundation ponding. The objective is to use water to start the compaction process, in stages, starting from the lowest level which Is the bottom of the foundation.
|
This foundation work we are doing here is going to be remarkably different from the other types we do. This is because of the type of soil we will be working on, which has a very low bearing capacity, with serious underground water movement.
|
FromZeroToHero:Welcome bro, I have a lot of experience with working with pipes, I have used these same quality of pipes to do over 50 buildings and none is leaking right now, except when wrongly fitted, or when damaged by careless use. I have also used PPR pipes and fittings in many previous projects with varyingdegreesof success, so I am no stranger to them. What we should consider is not what was used, but how it was used. PPR has it's own drawbacks too, like every other material out there in the market. But like I said, project managers work with what works for them. |
There will be a change of plans here, due to the conditions of this land and its waterlogged nature, we are not going to continue this sand filling with laterite soil as earlier planned. We are switching to sharp sand. More about this later. Thanks. |
More about the filling sand we're using in this site, we chose laterite soil, and in Enugu, there are these types of soil that is usually mixed with lumps of stones, sometimes heavier stones and boulders. From these types of stone, we can get gravel fro building purposes when washed properly.
|
Richhard:Thank you Sir |
The next stage in this foundation work is the filling of the foundation with sand brought in from elsewhere. We are buying laterite filling sand, mixed with lumps of stone for our use here................
|
We are in the final stages of the concrete cast for the top beams here...........
|
More picture updates from the foundation of this building.................
|
whirlwind7:You are correct Sir. The big mature ones are usually more sturdy, and will last longer like you said. Welcome Sir. |
We are still awaiting filling sand here, we are ready to start filling some parts of this foundation...... |
Looking for thick nylon sheets to aid in the water proofing of this foundation DPC.
|
Whole house foundation beam being treated with good concrete......................
|
Concrete cast for the top beam of this house is in progress...........
|
commited:10 in each packet, or box for all sockets and switches, except for double sockets which come in 5 per box. ..................
|
commited:Sometimes it depends on manufacturers, but mostly, there are 10 switches in a packet, irrespective of whether they are one gang, 2 gangs or 3. The notable difference is with sockets, there are double sockets that come in 5 pcs for a packet. |