Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 4:36am On Dec 16, 2021 |
mufutau55: Lovely. I like! Whatsapp sent. Thx.
Hajji M. I have replied you Sir. |
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 11:57pm On Dec 15, 2021 |
We've been very busy working on this house, more pictures later.........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:51pm On Dec 15, 2021 |
Finishing touches to breathe some life into the elephants.......
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:48pm On Dec 15, 2021 |
Bought more paints for the outside..........
The gloss paints are for the wooden doors...
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:46pm On Dec 15, 2021 |
More
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:39pm On Dec 15, 2021 |
The kitchen, let's tiptoe into this space to see what we are doing here.........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:34pm On Dec 15, 2021 |
Cleaning and washing out some rooms, brushing out paint and cement remains from every surface in the house. My house washing team is around.
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:28pm On Dec 15, 2021 |
Swimming pool tiles ongoing........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:25pm On Dec 15, 2021 |
Coping tiles gets to the site, testing the fit of it..........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:47am On Dec 15, 2021 |
Loading the swimming pool coping tiles today, the imported type.
|
Properties › Re: The Total Cost Of Building The House You Want. by spyder880(op): 11:46am On Dec 15, 2021 |
gideon1999: As part of the facilities in the compound. Thanks In that case the amount wont be enough again. An average swimming pool should cost about N3.5m with all its equipment. |
Properties › Re: The Awka Block Of 6 Flats Of 2 Bedrooms Project by spyder880(op): 7:34am On Dec 15, 2021 |
We will return to this site shortly to continue with our works here.......
More pictures later. |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:32am On Dec 15, 2021 |
Front
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 7:26am On Dec 15, 2021 |
Buying, and moving to site, some swimming pool equipment.........
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 7:25am On Dec 15, 2021 |
FEGEITOK: I am worried the one that is molded on the ground and hung and fall.
I feel this one with the cast with blocks can never fall.
But what do I know?
Thanks for your input and even more for your design which I am copying. Thank you bro. |
Properties › Re: The Total Cost Of Building The House You Want. by spyder880(op): 7:13am On Dec 15, 2021 |
gideon1999: Thanks for your reply. Please if you make it a 5 bedroom can swimming pool be accommodated. Thanks You mean swimming pool accommodated as part of facilities in the compound, or as part of the estimated bulksum? |
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 7:01am On Dec 15, 2021 |
Also at the main building..........
|
Properties › Re: The Making Of The "Contemporary 6 Bedroom Duplex " In Anambra by spyder880(op): 6:59am On Dec 15, 2021 |
Wall belts at the security man house........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:30am On Dec 15, 2021*. Modified: 6:57am On Dec 15, 2021 |
The fight for water..........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:28am On Dec 15, 2021 |
More trenches,
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:24am On Dec 15, 2021 |
More work......
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:22am On Dec 15, 2021 |
Foundation excavation works continue.........
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 6:10am On Dec 15, 2021 |
Starting with the excavation for the security man dwelling............
|
Properties › Re: Enugu Hilltop 6 Flats Of 2 Bedroom Flats Construction by spyder880(op): 6:07am On Dec 15, 2021 |
Back of some flats.........
|
Properties › Re: The Making Of The "4 Bedrooms Contemporary Style Duplex" (2 units) In Anambra by spyder880(op): 5:59am On Dec 15, 2021 |
We're now working nights 
|
Properties › Re: The Total Cost Of Building The House You Want. by spyder880(op): 5:46am On Dec 15, 2021 |
gideon1999: Please Can this be built on 500sqm and what's the cost of building it now Yes, it can fit in, the cost will be around N50m in the current naira power. Good morning. |
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 11:55am On Dec 14, 2021 |
FEGEITOK: Quick Question, this type of window dressing and that which is molded on the ground and hung up, which one do you recommend and why?
Just asking because I am copying this exact design and the workman is balking claiming the other one uses less materials and will cost me less.
I have a feeling he wants to avoid the extra work because he wants to go to another site.
I am resolute though; I want to replicate this even if it means hiring someone else to do it for me. This type is a frameless glass with no window hoods. Some people love it plain and simple. The other types are a lot of window hoods, frames and trims that are either plastered in during the window dressing, or molded on the ground and hung, depending on the design. Both are good, but it depends on what the owners of the house wants. |
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:05am On Dec 14, 2021 |
Work resumes at this site today. More pictures later. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:24am On Dec 14, 2021 |
More materials arriving.......
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:20am On Dec 14, 2021 |
Column starter bars...........
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:16am On Dec 14, 2021 |
Iron reinforcement works department.......
Column base reinforcement
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 1:41pm On Dec 12, 2021 |
kopell: That tree looks like hard wood, look at the middle. I"ve seen you slices tree on site used for paging before any reason for not doing same on this site Yes we always cut up the wood so we can reuse them, but this tree wasn't going to give us enough wood, it was better cutting up the stems for other uses. We cut some and got good looking wooden poles for electricity from it. |