Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 2:51pm On Feb 10, 2024 |
michlins: so I just heard that cement is 10k per bag now.
You really moved fast We bought 200 bags at N8,500 yesterday. Things are not funny any more. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:03am On Feb 10, 2024 |
More.....
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:00am On Feb 10, 2024 |
From the outside.............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:54am On Feb 10, 2024 |
Generator base plastering, dressing.............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:52am On Feb 10, 2024 |
Fence coping, fence plastering, electrical piping...............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:49am On Feb 10, 2024 |
Plastering, dressing, security house.........
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:46am On Feb 10, 2024 |
michlins: please oh, how do you go about preparing your quotation with this type of deviation?
From 7500 to 8500. Nothing can prepare you for this My brother, quotation in Nigeria is no longer reliable. But we must fight to move with better speed, in that way, we minimize the damage that will come from this inflation. |
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:29am On Feb 10, 2024 |
Still buying more cement yesterday, N8,500 per bag, before you arrange for transportation. |
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:28pm On Feb 09, 2024*. Modified: 6:28am On Feb 10, 2024 |
We have also started working on reinforcement rods...............
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:20pm On Feb 09, 2024 |
More
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:17pm On Feb 09, 2024 |
More from the foundation blinding..........
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 9:06pm On Feb 09, 2024 |
Updates on this foundation, we have sank the column bases on the basement flat foundation, currently doing the concrete blinding...............
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 10:36pm On Feb 06, 2024 |
Akerewe: well done engineer, how much is this plastic tank currently? N135,000 |
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:33pm On Feb 06, 2024 |
Cement jumped from N6,000 to N7,500 within a week, Nigeria we hail thee.
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:31pm On Feb 06, 2024 |
omanzo02: What type of board is the most budget friendly for pop ceiling this moment?
Everything age well these days as prices runs faster than budget🤣. It's still the good old POP, PVC boards are also costly. |
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 6:25am On Feb 06, 2024 |
Work on this foundation has continued, we are being circumspect with the foundation plans, it seems we need to introduce a couple of columns to improve in the design plans of this building. More pictures later as we start the column base excavation today. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 11:20pm On Feb 05, 2024 |
dongc: Those not exposed to rain ?....still cant get those meters at my place ...they keep asking for money up and down yet no meters available. They are exposed but that's the way the Electricity distribution company wants it, they mounted it themselves. They are trying to reduce hiding meters because of possibility of people bypassing wires if the meters are hidden or boxed. |
Properties › Re: The Property Investment and development Journal by spyder880(op): 7:57pm On Feb 05, 2024 |
More properties that are for sale to be posted soon, stay tuned.............. |
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:53pm On Feb 05, 2024 |
The floor, as seen from the top................
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:52pm On Feb 05, 2024 |
More,
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:50pm On Feb 05, 2024 |
More finished portions of the increte works, this work is unique, I dont think it has been dome in this design anywhere in Nigeria.............
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:47pm On Feb 05, 2024 |
In case you're wondering, this is not a coal mine, but we have this shale formation under the whole of Enugu city.
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:44pm On Feb 05, 2024 |
Our attempt to drill up water from this deep well is getting a lot of effort.............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:25pm On Feb 05, 2024 |
Electricity distribution meters, etc...........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:23pm On Feb 05, 2024 |
More works as we start fence plastering works, roofing of the security man house, etc ..........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:20pm On Feb 05, 2024 |
Our work updates at this house, fencing, gate, security house, etc...........
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:16pm On Feb 05, 2024 |
Repaired site store, buying plastic tanks, hoses, more equipment..............
We are setting up nicely.
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:14pm On Feb 05, 2024 |
We are also buying iron reinforcement rods for our use here, rods are so costly now...........
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:12pm On Feb 05, 2024 |
We have started foundation excavation works here.......
|
Properties › Re: Building Construction Of 8 Flats Of 3 Bedrooms + Basement At Onitsha by spyder880(op): 7:10pm On Feb 05, 2024 |
We are still working to bring in more materials in formnof chippings, sand and other materials............
|
Properties › Re: The Property Investment and development Journal by spyder880(op): 5:10pm On Feb 02, 2024 |
I have a plot of land for sale, direct brief, measuring 580 sqm and lying at Alulu Nike area, close to the Local government headquarters of Enugu East.
This land will be ideal for the building of multiple blocks of flats of any types, no government restrictions on number of floors, very good rental valuations in the neighborhood.
Title: Family deed of lease, survey plans and all other documents on my name.
Condition of the land: Level dry land, water is close to the surface, ideal for wells and low yield boreholes. Fenced on only one side, very close to the main road.
Asking price: N15m.
|
Properties › Re: The Property Investment and development Journal by spyder880(op): 6:25am On Feb 01, 2024 |
It's a serious development which every property investor cannot afford to overlook, the development has burst into the Enugu Abakaliki express, creating another inroads to Akpuoga Nike town...............
|