Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:38am On Dec 15, 2023 |
More of the completed compound.............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:36am On Dec 15, 2023 |
The final look of this floor when we completed the work.................
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:34am On Dec 15, 2023 |
denzel231: Oga Spyder and the engineer in the house. See the quotation they give me for floor stamping.. na Edo state I dey. I feel it's a bit expensive.. how una se am .
***Estimate for 200 sq meter foreign stamp floor**
1. cement 105bags× 5,700 =#598,500 2. 30tones of half inch granite with transport =#585,000 3.3 4trips of sharp sand (2in1 tipper)×45,000= #180,000 4. 15 (buckets) of color hardener 12,500=187,500 5. Release Agent 1 bucket #70,000 6. Ranging pipe 10×5,500=#55,000 7.Ramming machine 35,000 8. polish (70 litres)×4,000=#280,000 9. color paste 5kg = 25,000 10. transport to bring load to site #20,000 Materials Total=#2,036,000
Labour 1700×200msq= #340,000
SUM TOTAL #2,376,000 Good stamped concrete is costly these days. |
Politics › Re: Former Anambra Governor, Chukwuemeka Ezeife Is Dead by spyder880(m): 8:15am On Dec 15, 2023 |
The great Okwadike na Igboukwu!
May his gentle soul rest in peace. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:13am On Dec 15, 2023 |
We are committed to completing every work in this house before Christmas. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:12am On Dec 15, 2023 |
Compound increte works started yesterday morning...................
|
Travel › Re: Enugu Greenery: The Most Serene City In Nigeria by spyder880(m): 8:24pm On Dec 14, 2023 |
michlins: Spyder880 with the way this guy is going, how can you ever leave this city Enugu sweet my brother  |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:06pm On Dec 14, 2023 |
Front of the compound, we are working on the fence walls outside.............
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:40pm On Dec 14, 2023 |
Back of the house............
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:39pm On Dec 14, 2023 |
More
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:37pm On Dec 14, 2023 |
And we're ready to start the floor concrete cast...............
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:35pm On Dec 14, 2023 |
We haven't stopped sand filling this compound............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:15am On Dec 14, 2023 |
The elephant statue............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:55am On Dec 14, 2023*. Modified: 9:13am On Dec 14, 2023 |
The sides and the back............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:51am On Dec 14, 2023 |
Inside the compound............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:48am On Dec 14, 2023 |
The flowers.............
|
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:23am On Dec 14, 2023*. Modified: 8:44am On Dec 14, 2023 |
We have been working on this house to give it a facelift before the holidays.............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:59am On Dec 14, 2023 |
Gen2men: Is this off-white Engineer No this is white. Welcome. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:44am On Dec 12, 2023 |
Beframia: How many tonnes is each trip of this truck? About 7 tonnes. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:46pm On Dec 10, 2023 |
Badgers14: Oga / Madam of this house really chop money here ooo 
Once again, Mr. Spyder delivered as always. Keep it up brother man! No big small thing o, thank you bro. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:47pm On Dec 10, 2023 |
This compound has consumed so much filling, up to 96 trips of sand offloaded so far.............
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:39pm On Dec 10, 2023 |
More.........
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:36pm On Dec 10, 2023 |
Sand filling as seen from different parts of the compound.........
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:29pm On Dec 10, 2023*. Modified: 8:44am On Dec 12, 2023 |
Tipping many more trips of filling sand, we are working with 3 trucks at the same time................
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:18pm On Dec 10, 2023 |
Sand filling of this compound floor has since started............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:13pm On Dec 10, 2023 |
Chidimercy: Engineer please I am almost this partner of house but a 3 storey building. I am bothered how the parapet and belting would be painted since I have removed the scaffold. The only other option is hiring a painter that can do the same work with a ladder. Another option, although will be costly will be to erect a makeshift iron scaffolding work for the painting of the parapet and window hoods. Thanks. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 12:24pm On Dec 10, 2023 |
FromZeroToHero: weldone bro. Why didn't you do screeding before painting? The whole of the inside, outside and every wall and surfaces in this house was screeded. The screeding work was also top notch. There are pictures of screeding works on this house in the past pages. Welcome bro. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:44am On Dec 10, 2023 |
A view from the back of this house..........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:03am On Dec 10, 2023 |
We have painted the parapet and some hoods and designs on this building............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:55am On Dec 10, 2023 |
Meanwhile, outside this house...............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:50am On Dec 10, 2023 |
All the ceiling in this house has been painted............, now we're starting to paint inner room walls........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:34am On Dec 10, 2023 |
More.
|