₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,703 members, 8,524,720 topics. Date: Wednesday, 25 November 2026 at 11:45 AM

Toggle theme

Spyder880's Posts

Nairaland Forum › Spyder880's Profile › Spyder880's Posts

1 2 3 4 5 6 7 8 ... 35 36 37 38 39 40 41 42 43 (of 1148 pages)

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:38am On Dec 15, 2023
More of the completed compound.............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:36am On Dec 15, 2023
The final look of this floor when we completed the work.................

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:34am On Dec 15, 2023
denzel231:
Oga Spyder and the engineer in the house. See the quotation they give me for floor stamping.. na Edo state I dey. I feel it's a bit expensive.. how una se am .


***Estimate for 200 sq meter foreign stamp floor**

1. cement 105bags× 5,700 =#598,500
2. 30tones of half inch granite with transport =#585,000
3.3
4trips of sharp sand (2in1 tipper)×45,000= #180,000
4. 15 (buckets) of color hardener 12,500=187,500
5. Release Agent 1 bucket #70,000
6. Ranging pipe 10×5,500=#55,000
7.Ramming machine 35,000
8. polish (70 litres)×4,000=#280,000
9. color paste 5kg = 25,000
10. transport to bring load to site #20,000
Materials Total=#2,036,000

Labour 1700×200msq= #340,000

SUM TOTAL #2,376,000
Good stamped concrete is costly these days.
Politics › Re: Former Anambra Governor, Chukwuemeka Ezeife Is Dead by spyder880(m): 8:15am On Dec 15, 2023
The great Okwadike na Igboukwu!

May his gentle soul rest in peace.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:13am On Dec 15, 2023
We are committed to completing every work in this house before Christmas.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:12am On Dec 15, 2023
Compound increte works started yesterday morning...................

Travel › Re: Enugu Greenery: The Most Serene City In Nigeria by spyder880(m): 8:24pm On Dec 14, 2023
michlins:
Spyder880 with the way this guy is going, how can you ever leave this city
Enugu sweet my brother grin
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:06pm On Dec 14, 2023
Front of the compound, we are working on the fence walls outside.............

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:40pm On Dec 14, 2023
Back of the house............

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:39pm On Dec 14, 2023
More

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:37pm On Dec 14, 2023
And we're ready to start the floor concrete cast...............

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 1:35pm On Dec 14, 2023
We haven't stopped sand filling this compound............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 9:15am On Dec 14, 2023
The elephant statue............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op):
The sides and the back............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:51am On Dec 14, 2023
Inside the compound............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op): 8:48am On Dec 14, 2023
The flowers.............

Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by spyder880(op):
We have been working on this house to give it a facelift before the holidays.............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:59am On Dec 14, 2023
Gen2men:
Is this off-white Engineer
No this is white.

Welcome.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:44am On Dec 12, 2023
Beframia:
How many tonnes is each trip of this truck?
About 7 tonnes.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:46pm On Dec 10, 2023
Badgers14:
Oga / Madam of this house really chop money here ooo grin

Once again, Mr. Spyder delivered as always. Keep it up brother man!
No big small thing o, thank you bro.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:47pm On Dec 10, 2023
This compound has consumed so much filling, up to 96 trips of sand offloaded so far.............

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:39pm On Dec 10, 2023
More.........

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:36pm On Dec 10, 2023
Sand filling as seen from different parts of the compound.........

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op):
Tipping many more trips of filling sand, we are working with 3 trucks at the same time................

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:18pm On Dec 10, 2023
Sand filling of this compound floor has since started............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:13pm On Dec 10, 2023
Chidimercy:
Engineer please I am almost this partner of house but a 3 storey building. I am bothered how the parapet and belting would be painted since I have removed the scaffold.
The only other option is hiring a painter that can do the same work with a ladder. Another option, although will be costly will be to erect a makeshift iron scaffolding work for the painting of the parapet and window hoods. Thanks.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 12:24pm On Dec 10, 2023
FromZeroToHero:
weldone bro. Why didn't you do screeding before painting?
The whole of the inside, outside and every wall and surfaces in this house was screeded. The screeding work was also top notch. There are pictures of screeding works on this house in the past pages.

Welcome bro.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:44am On Dec 10, 2023
A view from the back of this house..........

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:03am On Dec 10, 2023
We have painted the parapet and some hoods and designs on this building............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:55am On Dec 10, 2023
Meanwhile, outside this house...............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:50am On Dec 10, 2023
All the ceiling in this house has been painted............, now we're starting to paint inner room walls........

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:34am On Dec 10, 2023
More.

1 2 3 4 5 6 7 8 ... 35 36 37 38 39 40 41 42 43 (of 1148 pages)