₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,346,705 members, 8,524,741 topics. Date: Wednesday, 25 November 2026 at 12:09 PM

Toggle theme

Spyder880's Posts

Nairaland Forum › Spyder880's Profile › Spyder880's Posts

1 2 3 4 5 6 7 8 ... 46 47 48 49 50 51 52 53 54 (of 1148 pages)

Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 10:02pm On Sep 25, 2023
Alpharey:
Pls try and contact me. I can drop my numbers. It's a business no and public
Send a message to me on WhatsApp 080 333 50 750. Thanks.
Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 9:42pm On Sep 25, 2023
Alpharey:
Wow, that's some beautiful project you are doing here. Please always contact us for your tiles and bricks @Building materials market Ogidi Anambra State
I will be in the building materials market at Ogidi tomorrow.
Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 8:36pm On Sep 25, 2023
t2luv1:
How much is the square footage of that house?
Will do some calculations and get back to you, cement costs are making a mess of our previous figures. Thank you.
Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 8:35pm On Sep 25, 2023
SonofGod231:
Enugu-Port Harcourt express way dey where exactly abi na the name of a road in enugu?!😔
There is a straight double lane expressway that started at this point and terminates at Mile 1, Diobu, Port Harcourt.
Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 8:32pm On Sep 25, 2023
rolams:
Hope nobody died?
No lives were lost, we thank God.
Properties › Re: How We Built The Block Of Lock-up Shops In Enugu by spyder880(op): 8:26pm On Sep 25, 2023
We have started painting this house............

More pictures later
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 7:16pm On Sep 25, 2023
We are busy at this site, work plan for this week;

1. Plastering of exterior walls, to be completed this week
2. Dressing of doors and windows, to be completed this week
3. Ceiling POP, to be concluded this week
4. Wall screeding, to be started this week
5. Wall and floor tiles, to be bought this week
6. Tanks, piping of tanks, to be started this week.

More pictures of work progress later.
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:10pm On Sep 25, 2023
Updates from our works at this site as at today;

1. Plastering of walls, completed
2. Installation of doors and windows, completed
3. Dressing of doors and windows, ongoing
4. Pop ceiling, completed
5. Wall screeding, to be started tomorrow
6. Wall and floor tiles, to be bought tomorrow
7. Soakaway system, to be started on Wednesday


More pictures of work progress in this site by tomorrow.
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 5:11pm On Sep 25, 2023
More, with the front...........

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 5:07pm On Sep 25, 2023
From another side.........

Closer

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 5:05pm On Sep 25, 2023
Outside this house today, we are still working..............

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 4:49pm On Sep 25, 2023
More.....

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 4:47pm On Sep 25, 2023
Pictures from the works we're doing at this building today............

Floor tiles being done on the gallery, and the main living room.

Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op):
nwakaibe:
Spyder Spyder, long time we no see you oh.
How are the building projects coming up?
It's been long ooo, projects are moving swiftly, just crossed this bridge to see this one i am building for a Nairalander somewhere in Enugu, and on returning, the bridge has collapsed.

See link to the house I went to see below........

https://www.nairaland.com/7516888/making-captivating-5-bedrooms-duplex/16

Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 3:34pm On Sep 25, 2023
May attach a video

Travel › Re: Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 3:33pm On Sep 25, 2023
I just passed this bridge some moments before this happened.

Travel › Bridge Collapses On Enugu - Port Harcourt Express Road by spyder880(op): 3:33pm On Sep 25, 2023
SPECIAL ANNOUNCEMENT

The Enugu State Ministry of Works and Infrastructure wishes to notify the General public of bridge collapse which occurred on 25th September 2023 along Kilometer One, Enugu Port Harcourt Expressway, i.e, between Naira Triangle and Goshen Flyover.

The general public and road users are hereby advised to detour to Nza through New Haven, or Ogui Road to their various destinations, while the authorities are coming up with measures for immediate repair on the failed section.

Signed
Engr. Gerald Otiji
Honourable Commissioner

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:54am On Sep 23, 2023
I have a lot more ceiling designs on the link below for people that may need to browse through and see more ideas.

https://www.nairaland.com/1922424/ceiling-pop-designs-house
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:49am On Sep 23, 2023
We have done all these ceiling works in many of the over 70 houses I have built, and we are ready to create more designs according to the choices of our clients, and the market trends.

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:45am On Sep 23, 2023
So, I basically see myself as a designer, a tailor of sorts, ready to collect the materials given to me and weaving it into the style of clothes that will fit the choices of my clients, and making sure the building comes out looking great in the end.

Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 7:39am On Sep 23, 2023
If it's designed ceilings, I get am plenty, only that my client chooses what they want to be in their house, not me. Buildings are like clothes, and the styles one person will want is not the styles another person will choose.

Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 7:10am On Sep 22, 2023
Rawgold300:
Wow thanks.. you are way helpful for some of us who are not around to monitor our project but yet determined to have something in our country.

If you don’t mind sharing the total Sqm of the pop area and if the 1.8m involves the workmanship? Pls
The total money includes the labour charges, I have forgotten the total measurements we did then. Thanks.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 10:24pm On Sep 21, 2023
Gen2men:
What would the three stages of electrical cost you in this build . I heard the wiring part cost more.
For buildings like this, the 3 stages may cost up to 5m. The wires obviously cost more.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:51pm On Sep 21, 2023
erico2k2:
I think this is down to security.
You're correct Sir.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 8:50pm On Sep 21, 2023
Gen2men:
Spyder I thought electrical wiring comes after door and window installation?
If I have men working in the site that I think will be there till the finish, then I can have the house wired before doors and windows. The advantage of doing wiring early is the benefit of seeing where there are blocked piping, and the work of braking walls or under decking to correct the piping work when it's still early, which is before wall screeding or ceiling works under the decking as the case may be.

What makes me leave wiring till later in some sites is to save the wires from being stolen if the work is not continuous. Thanks.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:04pm On Sep 21, 2023
Gen2men:
Looks like you have multiple teams on the ground working on this site. Nice job
Yes, I have my plastering team, ceiling team, screeding team, electrical team all working now, the door crew will arrive this weekend, to work with the windows guys, then all windows and doors will be dressed same time.

We are already moving for tiles and sanitary wares. Welcome.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 4:24pm On Sep 21, 2023
erico2k2:
Well-done Bossman
Thank you Sir.
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 4:12pm On Sep 21, 2023
More pictures from the back...........

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:38pm On Sep 21, 2023
More pictures from outside.........

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:30pm On Sep 21, 2023
More pictures from outside this building..............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:27pm On Sep 21, 2023
Electrical wiring works all of the flats...............

Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 1:24pm On Sep 21, 2023
More.......

1 2 3 4 5 6 7 8 ... 46 47 48 49 50 51 52 53 54 (of 1148 pages)